Standard Raised NESO medium 10 Feb 2026 GC0186 Proposed Grid Code Changes - Post Electricity System Restoration Standard (ESRS) View summary Open page also affects STC and DCODE Standard Raised NESO low 12 Nov 2025 GC0184 Increasing Reactive Power Requirements for PPMs when Operating below Maximum Active Power Urgent Implementation NESO medium 9 Jul 2025 GC0183 Generator and Interconnector Availability During a Severe Space Weather Event Standard Workgroup NESO low 7 Jul 2025 GC0182 Standardisation of Power Flow Metering Polarity Standard Workgroup Statkraft low 26 Jun 2025 GC0181 Enhance the Effectiveness of System Incidents Reporting Fast Track Implemented NESO 3 Apr 2025 GC0180 Corrections to the Grid Code following implementation of GC0175 View summary also affects N/A
Standard Workgroup NESO medium 12 Mar 2025 GC0178 Temporary Overvoltage - Specification of Limits and Clarification of Obligations Standard Report NESO low 12 Mar 2025 GC0179 Removal of Balancing Code No.4 and Balancing Code No.5 from the Grid Code Self-Governance (direct) Implemented NESO 13 Jan 2025 GC0177 Planning and Operational Compliance Contacts View summary also affects N/A
Standard Raised NESO high 7 Jan 2025 GC0185 Grid Code Changes for Mandatory Frequency Response (MFR) replacement Standard Workgroup NESO high 11 Nov 2024 GC0176 Introduction of Demand Control Rotation Protocol within Operating Code 6 of the Grid Code Standard (direct) Implemented NESO 8 Oct 2024 GC0175 Removing references to “Fax” or “Facsimile” within the Grid Code View summary also affects CUSC and STC
Self-Governance Implemented NESO 11 Jun 2024 GC0174 Review of obligation to provide EU Transparency Availability Data as specified in OC2.4.7 View summary also affects BSC
Standard Decision NESO low 22 May 2024 GC0173 Consistency of Technical and Compliance Requirements between GB and European Users Standard (direct) Implemented NESO 3 May 2024 GC0172 Replacing References to Electricity Supply Industry Arbitration Association View summary also affects CUSC, STC & BSC
Self-Governance (direct) Implemented NESO 28 Mar 2024 GC0171 Improving the clarity and transparency of the Compliance Process for Small Generators with a Bilateral Embedded Generator Agreement (BEGA) View summary also affects NA
Standard Decision NESO low 6 Mar 2024 GC0169 Material changes arising from Grid Code Modification GC0136 Fast Track Implemented ESO 6 Mar 2024 GC0170 Typographical and formatting updates following the implementation of GC0156: Facilitating the Implementation of the Electricity System Restoration Standard View summary also affects N/A
Standard Workgroup NESO high 5 Mar 2024 GC0168 Submission of Electro Magnetic Transient (EMT) Models TBC Withdrawn ESO 10 Jan 2024 GC0167 Material and Non Material Grid Code Changes View summary also affects N/A
Standard Implemented NESO 29 Nov 2023 GC0166 Introducing new Balancing Mechanism Parameters for Limited Duration Assets View summary also affects BSC
Fast Track Implemented ESO 6 Oct 2023 GC0165 Typographical and formatting changes to the Grid Code View summary also affects N/A
Standard Consultation NESO low 4 Oct 2023 GC0164 Simplification of Operating Code No.2 Self-Governance Implemented NESO 2 Oct 2023 GC0163 GB Grid Forming (GBGF) - Removal of Virtual Impedance restriction View summary also affects N/A
Urgent Implemented ESO 20 Jul 2023 GC0162 Changes to OC6 to amend the operational timings for the delivery of the additional demand reduction above 20%, with a focus between 20% and 40% View summary also affects Distribution Code
Urgent Implemented ESO 17 May 2023 GC0161 Changes to OC6 to allow for site protection View summary also affects Distribution Code
Urgent Implemented SSE Generation Ltd 28 Sept 2022 GC0160 Grid Code Changes for BSC Mod P448: "Protecting Generators subject to Firm Load Shedding during a Gas Supply Emergency from excessive Imbalance Charges" View summary also affects BSC (P448)
Standard Implemented NESO 13 Sept 2022 GC0159 Introducing Competitively Appointed Transmission Owners View summary also affects CUSC (CMP403 and CMP404), STC (CM086 and CM087), SQSS (GSR031)
Self-Governance (direct) Implemented ESO 10 Aug 2022 GC0158 Reversing unimplemented aspects of GC0068 View summary also affects BSC
Self-Governance (direct) Implemented ESO 13 Jun 2022 GC0157 Grid Code Housekeeping Modification View summary
Standard Implemented ESO 8 Feb 2022 GC0156 Facilitating the Implementation of the Electricity System Restoration Standard View summary also affects Grid Code (GC0148), CUSC (CMP398 and CMP412), SQSS (GSR032), STC (CM089 and STCP PM0128), BSC (P451) and Distribution
Code/G99 and European Network Codes
Standard Workgroup NESO low 1 Dec 2021 GC0155 Clarification of the Fault Ride Through Technical Requirements Standard Implemented ESO 24 Nov 2021 GC0154 Incorporation of interconnector ramping requirements into the Grid Code as per SOGLA119 View summary also affects European Network Codes (SOGL)
Standard Implemented ESO 14 Jul 2020 GC0148 Implementation of EU Emergency and Restoration Code Phase II View summary also affects Distribution
Code, STC, European Network Codes
Standard Workgroup NESO medium 11 Mar 2020 GC0140 Grid Code Sandbox: enabling derogation from certain obligations to support small-scale trials of innovative propositions View summary Open page also affects CUSC (CMP341) Standard Implemented ESO 11 Mar 2020 GC0141 User Compliance Processes and Modelling following 9th August Power Disruption View summary also affects STC
Standard Workgroup Electricity North West medium 10 Feb 2020 GC0139 Enhanced Planning Data Exchange to Facilitate Whole System Planning View summary Open page also affects STC (STCP19-5) Standard Implemented ESO 10 Feb 2020 GC0138 Compliance process technical improvements (EU and GB User) View summary
Standard Workgroup SSE Generation Ltd low 1 Jun 2018 GC0117 Improving transparency and consistency of access arrangements across GB by the creation of a pan-GB commonality of Power Station requirements View summary Open page also affects CUSC, STC & BSC Standard Report SSE Generation Ltd medium 1 Jul 2017 GC0103 The introduction of harmonised Applicable Electrical Standards
in GB to ensure compliance with the EU Connection Codes Implemented GC0097 Grid Code Processes Supporting TERRE
Implemented GC0100 EU Connection Codes GB
Implementation – Mod 1
PLS ALSO REFER 101 &102
Implemented GC0101 EU Connection Codes GB
Implementation – Mod 2
PLS ALSO REFER 100 &102
Implemented GC102 EU Connection Codes GB
Implementation – Mod 3
PLS ALSO REFER TO 100 &101
Implemented GC0110 LFSM-O compliance
requirements for Type B PGMs
Implemented GC0104 EU Connection
Codes GB Implementation –
Demand Connection Code
Implemented GC0098 Using GB Grid Code data to construct the EU Common Grid Model in accordance with Regulation (EU) 2015/1222 (CACM) and Regulation (EU) 2016/1719 (FCA)
Implemented GC0099 Establishing a common
approach to interconnector scheduling
consistent with the single intraday market
coupling processes set out within Regulation
(EU) 2015/1222 (CACM).
Implemented GC0108 EU Code: Emergency
& Restoration: Black start testing requirement
Implemented GC0106 Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)
Implemented GC0115 Legal Separation housekeeping: NGET to The Company
Implemented GC0116 Correction to the compliance dates included in
modifications GC0100-102 for the Requirements for
Generators (RfG) and HVDC European Network Codes
Implemented GC0112 National Grid Legal Separation Grid Code changes to incorporate NGESO
Implemented GC0120 National Grid legal separation changes to clarify Grid Code responsibilities and consequential changes
Implemented GC0122 Amending references to NGET and the Company within the Grid Code following previous modifications
Implemented GC0114 System Operation Guideline: Prequalification Processes
Implemented GC0118 Modification to the Grid Code to accommodate the recent Distribution Code modification to Engineering Recommendation P28 –Voltage fluctuations and the connection of disturbing equipment to transmission systems and distribution networks in the UK
Implemented GC0111 Fast Fault Current Injection specification
text
Implemented GC0124 Critical Friend review period for submission of new modifications
Implemented GC0123 Clarifying references to NGET and Relevant Transmission Licensees
Implemented GC0125 EU Code Emergency & Restoration: Black Start testing requirements for Interconnectors
Implemented GC0127 EU Code Emergency & Restoration: Requirements resulting from System Defence Plan
Implemented GC0128 EU Code Emergency
& Restoration: Requirements
resulting from System
Restoration Plan
Implemented GC0135 Removal of Redundant Provisions
Implemented GC0143 Last resort disconnection of Embedded Generation
Rejected GC0107 GC0113 The open, transparent, non discriminatory and timely publication of
the generic and/ or PGM specific values required to be specified by the relevant
TSO(s) and / or relevant system operator et al., in accordance with the RfG.
Implemented GC0096 Energy Storage
Implemented GC0105 System Incidents Reporting
Implemented GC0129 Updating references to Engineering Recommendation G5
Implemented GC0132 Updating the Grid Code governance process to ensure we capture EBGL change process for Article 18 T and Cs
Implemented GC0131 Quick Win’ Improvements to Grid Code Open Governance Arrangements
Implemented GC0142 Adding Non-Standard Voltages to the Grid Code
Withdrawn GC0121 Grid Code changes in the event the UK leaves the EU without an agreement
Withdrawn GC0145 Updating the Grid Code to include the Manually Activated Reserve Initiative (MARI)
Implemented GC0136 Non-material changes to the Grid Code following implementation of the EU Connection Codes.
Implemented GC0130 OC2 Change for simplifying ‘output useable’ data submission and utilising REMIT data
Implemented GC0147 Last resort disconnection of Embedded Generation – enduring solution
Implemented GC0144 Alignment of Market Suspension Rights to the EU Emergency and Restoration Code Article 35.1(b)
Implemented GC0149 Grid Code changes to reflect the terms of the UK’s departure from the EU
Implemented GC0109 Publication of the various GB electricity Warnings or Notices or Alerts or
Declarations or Instructions or Directions etc., issued by or to the Network
Operator(s).
Implemented GC0134 Removing the telephony requirements for small, distributed and aggregated market participants who are active in the Balancing Mechanism
Implemented GC0150 Housekeeping change post- GC0147 implementation
Implemented GC0151 Grid Code Compliance with Fault Ride Through Requirements
Implemented GC0152 Updating the Grid Code governance process to ensure we capture network code on electricity emergency and restoration (NCER) change process for Article 4 Terms and Conditions (T&Cs)
Implemented GC0137 Minimum Specification Required for Provision of Virtual Synchronous Machine (VSM) Capability
Rejected GC0133 Timely informing of the GB NETS System State condition
Implemented GC0153 Making the Grid Code Gender Neutral
Implemented GC0146 Solutions for frequency control of Power Park Modules
Implemented GC0126 Implementing Profiled Stable Import and Export Limits, and reversing unimplemented aspects of GC0068