Part 2 Matter Report Peter Waymont (EASTERN POWER NETWORKS PLC) 22 Feb 2026 DCP471 Lead Time For DCPs View summary
Part 2 Matter Report Lee Stone (NPOWER COMMERCIAL GAS LIMITED) 20 Feb 2026 DCP472 DCMDG & SIG Agenda Timings View summary
Part 1 Matter Raised Chris Ong (EASTERN POWER NETWORKS PLC) 13 Jan 2026 DCP469 Cross Code Standardisation of Charging Arrangement Notice Periods View summary
Part 2 Matter Consultation Mark Bellman (ELECTRICITY NORTH WEST LIMITED) 14 Nov 2025 DCP468 Remove Redundant DataFlow from DTC/EMDS View summary
Part 1 Matter assessment Peter Waymont (EASTERN POWER NETWORKS PLC) 23 Oct 2025 DCP466 Tariff Band to Follow Capacity View summary
Part 1 Matter Raised Paul Morris (LONDON POWER NETWORKS PLC) 21 Oct 2025 DCP467 Online reporting tools for Category A and B defects View summary
Part 1 Matter Raised Dave Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 15 Oct 2025 DCP465 NFD Generator and Battery Capacity Charges View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 12 Sept 2025 DCP462 Impact of MHHS on certain DCUSA owned flows View summary
Part 1 Matter assessment Rob Gladstone (SOUTHERN ELECTRIC POWER DISTRIBUTION PLC) 8 Sept 2025 DCP464 IDNO Connection Applications: Treatment of Existing Assets View summary
Part 1 Matter assessment Peter Waymont (EASTERN POWER NETWORKS PLC) 5 Sept 2025 DCP463 Charging non-consuming De-energised CT-Metered sites View summary
Part 1 Matter assessment Ben Godfrey (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 13 Aug 2025 DCP461 Reducing the Impact of Transmission Distribution Charges View summary
Part 2 Matter Implemented Andy Green (ELECTRALINK LIMITED) 12 Aug 2025 DCP460 Updating Incorrect Company Names Referenced throughout the DCUSA View summary
Part 2 Matter assessment Anne-Claire leydier (UK POWER DISTRIBUTION LIMITED) 1 Aug 2025 DCP459 DNO invoices to Embedded DNO View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 17 Jul 2025 DCP458 Amend DCP 414 process View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 9 Jul 2025 DCP457 Housekeeping Items View summary
Part 1 Matter Implemented Ofgem (-) 4 Jun 2025 DCP456 MHHS Incremental Changes for Go Live View summary
Part 2 Matter Implemented Mark Bellman (ELECTRICITY NORTH WEST LIMITED) 22 May 2025 DCP455 Align RAV price-inflation with that used in ED2 View summary
Part 1 Matter Raised Craig Booth (-) 6 May 2025 DCP454 Provide enduring targeted relief from residual charges for electric vehicle charging sites View summary
Part 2 Matter Implemented Tracey Taylor (ELECTRICITY NORTH WEST LIMITED) 9 Apr 2025 DCP453 Correction to Schedule 22 – Example 7 View summary
Part 1 Matter Decision Andrew Enzor (FIELD GAIA LTD) 5 Mar 2025 DCP452 Correct application of Forward Cost Pricing EDCM charges to users connected directly to a Grid Supply Point View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 10 Feb 2025 DCP451 Suspending Registrations View summary
Part 1 Matter Implementation Chris Ong (EASTERN POWER NETWORKS PLC) 10 Feb 2025 DCP450 Managing the effects of surplus residual charge in the CDCM View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 18 Dec 2024 DCP449 NTC phone number deletion View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 11 Nov 2024 DCP448 Supercustomer Billing View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 11 Nov 2024 DCP447 NTC Section Footers View summary
Part 1 Matter Raised Mark Rose (EASTERN POWER NETWORKS PLC) 7 Nov 2024 DCP446 Emergency Disconnections View summary
Part 1 Matter Implemented Ofgem (-) 4 Sept 2024 DCP445 Implementation of Market-wide Half Hourly Settlement (MHHS) Arrangements View summary
Part 2 Matter Withdrawn Peter Waymont (EASTERN POWER NETWORKS PLC) 3 Sept 2024 DCP444 Additional Settlement Runs View summary
Part 1 Matter assessment Peter Waymont (EASTERN POWER NETWORKS PLC) 9 Jul 2024 DCP443 Excess Capacity View summary
Part 1 Matter Raised Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 1 Jul 2024 DCP442 Aligning enduring flexible connections View summary
Part 1 Matter Implemented Simon Vicary (EDF ENERGY CUSTOMERS LIMITED) 23 Apr 2024 DCP441 Proposal to increase the number of allowed Change Report alternative variations from two to three View summary
Part 1 Matter Implementation Peter Waymont (EASTERN POWER NETWORKS PLC) 15 Apr 2024 DCP440 Consuming "de-energised" sites View summary
Part 1 Matter Rejected Peter Waymont (EASTERN POWER NETWORKS PLC) 14 Mar 2024 DCP439 Backdating Tariff Changes View summary
Part 1 Matter Implemented Babatunde Olukotun (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 27 Feb 2024 DCP438 Rate of Return Change Proposal View summary
Part 1 Matter Rejected Dave Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WALES) PLC) 13 Feb 2024 DCP437 To Shorten the DUoS Pricing Notice Periods View summary
Part 2 Matter Implemented Paul Nicholson (NORTHERN POWERGRID (NORTHEAST) PLC) 12 Feb 2024 DCP436 Date change for the provision of Rota Load Block Alpha Identifiers and potential provision of additional data View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 9 Feb 2024 DCP435 Party Novation Process View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 9 Feb 2024 DCP434 Credit Cover RAV in ED-2 View summary
Part 1 Matter Implemented Chris Barker (ELECTRICITY NORTH WEST LIMITED) 5 Jan 2024 DCP433 Limitation for backdating of rebates/charges under Schedule 32 View summary
Part 2 Matter Implemented Andrew Sherry (ELECTRICITY NORTH WEST LIMITED) 13 Dec 2023 DCP432 Amend the Recognised Credit Assessment Agency table in Schedule 1 View summary
Part 2 Matter Rejected David Ballantyne (ECO GREEN MANAGEMENT LIMITED) 10 Oct 2023 DCP431 Party Novation Process View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 2 Oct 2023 DCP430 Reducing Good Payment Record View summary
Part 2 Matter Implemented Donna Butcher (SOUTH EASTERN POWER NETWORKS PLC) 12 Sept 2023 DCP429 Obtaining an Independent Credit Assessment View summary
Part 2 Matter Implemented Donna Jamieson (ENERGY ASSETS NETWORKS LIMITED) 14 Aug 2023 DCP427 Housekeeping Log Items View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 8 Aug 2023 DCP426 Multiple Party Categories View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 25 Jul 2023 DCP428 Zero REP-002/A Data View summary
Part 1 Matter Implemented Lee Wells (NORTHERN POWERGRID (YORKSHIRE) PLC) 13 Jul 2023 DCP425 Cost Apportionment Factor "cap" Methodology View summary
Part 1 Matter assessment Mary Gillie (GREEN ENERGY (UK) LIMITED) 10 May 2023 DCP424 Use of System charging for Complex Sites View summary
Part 1 Matter Withdrawn Tom Cadge (THE ELECTRICITY NETWORK COMPANY LIMITED) 9 May 2023 DCP423 LDNO Discounts for Negative Scaling View summary
Part 2 Matter Implemented Brian Hoy (ELECTRICITY NORTH WEST LIMITED) 5 May 2023 DCP422 Access SCR Clarifications and Corrections View summary
Part 2 Matter Implemented Dave Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 12 Apr 2023 DCP421 Update the Tables in Schedule 15 of DCUSA View summary
Part 1 Matter assessment Dave Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 29 Mar 2023 DCP420 Provide targeted relief from residual charges for electric vehicle charging sites View summary
Part 1 Matter Raised Nikhel Jethwa (SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC) 6 Mar 2023 DCP419 Pre-Notifications of Planned Supply De-Energisations View summary
Part 2 Matter Implemented Lee Wells (ELECTRICITY NORTH WEST LIMITED) 3 Jan 2023 DCP418 Access SCR alignment View summary
Part 1 Matter Implemented Simon Yeo (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WEST) PLC) 16 Nov 2022 DCP417 Ability for the DCUSA Secretariat to Raise Change Proposals View summary
Part 2 Matter Withdrawn Peter Waymont (EASTERN POWER NETWORKS PLC) 14 Nov 2022 DCP416 Electronic Invoicing Post MHHS View summary
Part 2 Matter Withdrawn Peter Waymont (EASTERN POWER NETWORKS PLC) 10 Nov 2022 DCP415 Replacement of D0242/D0315 for MHHS View summary
Part 1 Matter Implemented Lee Stone (E.ON UK PLC) 18 Oct 2022 DCP414 Transitional Protection for NHH CT Customers affected by regulatory change View summary
Part 1 Matter Decision Lee Stone (E.ON UK PLC) 11 Oct 2022 DCP412 Allocation of banding for TCR Charges for 'Peaky' Final Demand Customers View summary
Part 1 Matter Rejected Christine Austin (ELECTRICITY NORTH WEST LIMITED) 27 Sept 2022 DCP413 Value of a User's Credit Allowance in Schedule 1 View summary
Part 1 Matter Rejected Peter Waymont (EASTERN POWER NETWORKS PLC) 14 Sept 2022 DCP411 Charging De-energised sites View summary
Part 1 Matter Implemented Richard Ellis (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 13 Jul 2022 DCP410 Fairer re-assessment of the allocation of Final Demand Sites prior to subsequent price control periods View summary
Part 1 Matter Withdrawn Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 11 May 2022 DCP408 Energy Bills Support Scheme (EBSS) cost-recovery treatment View summary
Part 1 Matter Rejected Kevin Woollard (BRITISH GAS TRADING LIMITED) 6 May 2022 DCP409 Change to Credit cover calculations to include Last Resort Supply Payment View summary
Part 1 Matter Implemented Brian Hoy (ELECTRICITY NORTH WEST LIMITED) 6 May 2022 DCP406 Access SCR: Changes to CCCM View summary
Part 1 Matter Implemented Brian Hoy (ELECTRICITY NORTH WEST LIMITED) 6 May 2022 DCP407 Access SCR: Speculative Development View summary
Part 1 Matter Implemented Tom Cadge (ELECTRICITY NORTH WEST LIMITED) 6 May 2022 DCP405 Access SCR: Managing Curtailable Connections between Licensed Distribution Networks View summary
Part 1 Matter Implemented Tony McEntee (ELECTRICITY NORTH WEST LIMITED) 6 May 2022 DCP404 Access SCR: Changes to Terms of Connection for Curtailable Customers View summary
Part 1 Matter Implemented Andrew Pace (HARTREE PARTNERS SUPPLY (UK) LIMITED) 14 Apr 2022 DCP403 Clarify the application of the TCR fixed charge View summary
Part 2 Matter Implemented Andrew Sherry (ELECTRICITY NORTH WEST LIMITED) 9 Mar 2022 DCP402 Amendment to the 'Effective From' Date of DCP 349 View summary
Part 1 Matter Implemented Nicola Garland (-) 2 Feb 2022 DCP401 Consequential DCUSA changes for Switching SCR (REC 3.0) View summary
Part 1 Matter Implemented Carl Dennis (SHELL ENERGY UK LIMITED) 21 Jan 2022 DCP400 Commissioning of Works using shared Meter Operator services by the Crowded Meter Room Coordinator View summary
Part 2 Matter Implemented Steve Halsey (LONDON POWER NETWORKS PLC) 12 Jan 2022 DCP399 Revision to Embedded Capacity Register (ECR) to lower threshold for entries from 1MW to 50kW View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 22 Nov 2021 DCP398 Gender Neutral Amendments to the DCUSA View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 11 Oct 2021 DCP396 Housekeeping Change to Schedule 33 View summary
Part 2 Matter Implemented Paul Fitzgerald (SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC) 6 Oct 2021 DCP397 Modification of the Load Managed Area Notice Template View summary
Part 1 Matter Implemented Diandra Orodan (THE ELECTRICITY NETWORK COMPANY LIMITED) 5 Oct 2021 DCP395 Allocation of Smart Meter Communication Licence costs within LDNO Tariffs View summary
Part 1 Matter Implemented Kevin Woollard (BRITISH GAS TRADING LIMITED) 2 Sept 2021 DCP394 Allow any REC Accredited Meter Operator to De-Energise any Metering Point View summary
Part 1 Matter Implemented Rachel Clark - Ofgem (-) 13 Aug 2021 DCP393 Market-wide Half-Hourly Settlement (MHHS) Implementation and Governance Arrangements View summary
Part 1 Matter Rejected Simon Vicary (EDF ENERGY CUSTOMERS LIMITED) 14 Jul 2021 DCP392 Charging of Third Party DNO Works to Transmission Connection Users View summary
Part 1 Matter Implemented Rachel Clark - Ofgem (-) 5 May 2021 DCP391 Retail Code Consolidation Significant Code Review View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 14 Apr 2021 DCP386 Sharing Network Information with Owners and Occupiers View summary
Part 1 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 14 Apr 2021 DCP389 TCR – Clarification on Exceptional Circumstances and Allocation Review for 'New' Sites View summary
Part 1 Matter Withdrawn Kevin Liddle (NORTHERN POWERGRID (NORTHEAST) PLC) 14 Apr 2021 DCP390 Provision of Isolations for Safe Working on Customers' Electrical Installations View summary
Part 1 Matter Raised Lee Stone (E.ON ENERGY SOLUTIONS LIMITED) 14 Apr 2021 DCP388 Amendments to Facilitate Appropriate Residual Charging for Sites with a Mix of Final and Non-Final Demand View summary
Part 1 Matter Implemented Matthew Tucker (Welsh Power) (-) 6 Apr 2021 DCP387 Amendment to the Definition of Non-Final Demand Site to Align with CUSC View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 25 Mar 2021 DCP385 No Retrospective Capacity Reductions View summary
Part 1 Matter Rejected Julia Haughey (EDF ENERGY CUSTOMERS LIMITED) 10 Mar 2021 DCP384 Charging of Third Party DNO Works to Transmission Connected Users View summary
Part 1 Matter Implemented Paul Morris (LONDON POWER NETWORKS PLC) 10 Feb 2021 DCP383 Provision for Distributors to Move Meters for Service Alterations View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 9 Feb 2021 DCP381 Update to Sandbox Process View summary
Part 1 Matter Rejected Kevin Woollard (BRITISH GAS TRADING LIMITED) 9 Feb 2021 DCP382 2021-22 Electricity Theft Detection Incentive Scheme (ETDIS) Timings View summary
Part 2 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 9 Dec 2020 DCP380 TCR Alignment Changes View summary
Part 2 Matter Implemented Marc Newby (SMARTESTENERGY LIMITED) 18 Nov 2020 DCP377 Subsequent Theft Charter Change View summary
Part 2 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 5 Nov 2020 DCP378 DCP333 Housekeeping Change View summary
Part 2 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 5 Nov 2020 DCP379 Amend Table 1 of Schedule 15 to maintain alignment with the distribution licence View summary
Part 2 Matter Implemented Tom Cadge (THE ELECTRICITY NETWORK COMPANY LIMITED) 21 Oct 2020 DCP376 Provision of Customer Residual Charging Bands to Suppliers View summary
Part 1 Matter Implemented Donna Jamieson (ENERGY ASSETS NETWORKS LIMITED) 30 Sept 2020 DCP375 Amendments to the Unmetered Supplies National Terms of Connection View summary
Part 1 Matter Implemented Stacey Buck (INDEPENDENT POWER NETWORKS LIMITED) 9 Sept 2020 DCP374 Energy Theft Transition into the Retail Energy Code View summary
Part 1 Matter Implemented Jane Edge (BRITISH GAS TRADING LIMITED) 12 Aug 2020 DCP372 Changes to the Theft Code of Practice View summary
Part 1 Matter Withdrawn Richard Hartshorn (SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC) 15 Jul 2020 DCP371 Last resort arrangements for Distributors to manage specific consumer connected devices View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 10 Jul 2020 DCP373 Groups in Schedule 11 View summary
Part 2 Matter Implemented Rebecca Lowe (EDF ENERGY CUSTOMERS LIMITED) 6 Apr 2020 DCP370 Inclusion of Outcome Files in the Escalation Process View summary
Part 2 Matter Implemented Jennifer Pickering (E.ON ENERGY SOLUTIONS LIMITED) 18 Mar 2020 DCP366 Theft Detection Incentive Scheme Company Merges View summary
Part 2 Matter Implemented Rebecca Lowe (EDF ENERGY CUSTOMERS LIMITED) 18 Mar 2020 DCP367 Theft Detection Incentive Scheme – Clarification to the Final Supply Point Market Share (FSMS) View summary
Part 1 Matter Implemented Kevin Woollard (BRITISH GAS TRADING LIMITED) 18 Mar 2020 DCP368 Amendment to the Electricity Theft Detection Incentive Scheme (ETDIS)Timing View summary
Part 2 Matter Implemented Rebecca Lowe (EDF ENERGY CUSTOMERS LIMITED) 18 Mar 2020 DCP369 Theft Charter View summary
Part 2 Matter Implemented Rebecca Lowe (EDF ENERGY CUSTOMERS LIMITED) 18 Mar 2020 DCP365 Requirements on Suppliers to Provide Outcome Files View summary
Implemented Paul Morris (EASTERN POWER NETWORKS PLC) 12 Feb 2020 DCP364 Provision of Information on Suppliers Emergency Metering Service Provisions View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 3 Feb 2020 DCP362 The Update of Relevant European Union (EU) Clauses as a Result of Brexit. View summary
Part 2 Matter Implemented Andrew Sherry (ELECTRICITY NORTH WEST LIMITED) 21 Jan 2020 DCP363 Refining the definition of 'Eligible Electricity Storage Facility' in the EDCM View summary
Part 1 Matter Implemented Claire Campbell (SP DISTRIBUTION PLC) 14 Jan 2020 DCP361 Ofgem Targeted Charging Review Implementation: Calculation of Charges View summary
Part 1 Matter Implemented Tony McEntee (ELECTRICITY NORTH WEST LIMITED) 14 Jan 2020 DCP358 Ofgem Targeted Charging Review Implementation: Determination of Banding Boundaries View summary
Part 1 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 14 Jan 2020 DCP359 Ofgem Targeted Charging Review Implementation: Customers – who should pay? View summary
Part 1 Matter Implemented Simon Yeo (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 14 Jan 2020 DCP360 Ofgem Targeted Charging Review Implementation: Allocation to Bands and Interventions View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 24 Oct 2019 DCP356 Housekeeping change following the approval of DCP 332 and DCP 268 View summary
Part 2 Matter Withdrawn Chris Ong (SOUTH EASTERN POWER NETWORKS PLC) 25 Sept 2019 DCP352 CDCM Modelling Assumptions Housekeeping View summary
Part 2 Matter Withdrawn Chris Ong (SOUTH EASTERN POWER NETWORKS PLC) 25 Sept 2019 DCP353 EDCM – LRIC Modelling Assumptions Housekeeping View summary
Part 2 Matter Withdrawn Chris Ong (SOUTH EASTERN POWER NETWORKS PLC) 25 Sept 2019 DCP354 EDCM – FCP Modelling Assumptions Housekeeping View summary
Part 2 Matter Withdrawn Chris Ong (SOUTH EASTERN POWER NETWORKS PLC) 25 Sept 2019 DCP355 PCDM Modelling Assumptions Housekeeping View summary
Part 2 Matter Implemented Rebecca Lowe (EDF ENERGY CUSTOMERS LIMITED) 17 Sept 2019 DCP357 DCP 357 – Sharing theft data between the TRAS and ELEXON View summary
Part 2 Matter Implemented Alex Cebo (EDF ENERGY CUSTOMERS LIMITED) 10 Sept 2019 DCP351 Recovery of Incorrectly Paid Incentive Scheme Credits View summary
Part 1 Matter Implemented Tim Hughes (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WALES) PLC) 17 Jul 2019 DCP348 DNO charging for installing capacity management and communications equipment to enable Flexibility in Connections View summary
Part 1 Matter Implemented Andrew Sherry (ELECTRICITY NORTH WEST LIMITED) 17 Jul 2019 DCP349 Effectiveness of the current provision of unsecured cover under Schedule 1 View summary
Part 1 Matter Implemented Lisa Waters (UK POWER RESERVE LIMITED) 17 Jul 2019 DCP350 Creation of Embedded Capacity Registers View summary
Part 2 Matter Withdrawn Ruby Curry (BRITISH GAS TRADING LIMITED) 12 Jun 2019 DCP347 Removal of Non-Participating Supplier and SoLR From Annual Reports View summary
Part 2 Matter Implemented Matthew Simkiss (NPOWER LIMITED) 15 May 2019 DCP346 Amendment to Code of Practice Confirmed Theft Definition View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 14 Mar 2019 DCP345 Sandbox Application View summary
Part 1 Matter Rejected Claire Towler (SSE ENERGY SUPPLY LIMITED) 26 Feb 2019 DCP344 Solutions for a new approach to billing and remittance View summary
Part 1 Matter Rejected Andrew Enzor (NORTHERN POWERGRID (NORTHEAST) PLC) 12 Feb 2019 DCP343 Use of a nominated calculation agent for the calculation of the LV mains split View summary
Part 2 Matter Implemented Marvin Clare (OPUS ENERGY LIMITED) 7 Feb 2019 DCP338 Update to the ETDIS Schedule View summary
Part 2 Matter Implemented Andrew Enzor (NORTHERN POWERGRID (NORTHEAST) PLC) 1 Feb 2019 DCP339 Amend definition of 'Other Charges' in Clause 19.2.1 to exclude the recovery of approved Last Resort Supply Payment Claims View summary
Part 1 Matter Withdrawn Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 1 Feb 2019 DCP340 Notice period required to recover approved last resort supply payment claims which breach the materiality threshold View summary
Part 1 Matter Implemented Tony Mcentee (ELECTRICITY NORTH WEST LIMITED) 31 Jan 2019 DCP341 Removal of residual charging for storage facilities in the CDCM View summary
Part 1 Matter Implemented Tony Mcentee (ELECTRICITY NORTH WEST LIMITED) 31 Jan 2019 DCP342 Removal of residual charging for storage facilities in the EDCM View summary
Part 2 Matter Implemented Sasha Pearce (NPOWER LIMITED) 17 Jan 2019 DCP335 Provision of email contact details for use in Incident Management scenarios View summary
Part 2 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 8 Jan 2019 DCP337 Resolution of Housekeeping Items View summary
Part 2 Matter Implemented Chris Ong (EASTERN POWER NETWORKS PLC) 7 Jan 2019 DCP336 Rota Disconnections and the publication of data by Nominated Central Source View summary
Part 2 Matter Implemented Marvin Clare (OPUS ENERGY LIMITED) 21 Nov 2018 DCP330 TRAS Escalation Process View summary
Part 1 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 12 Nov 2018 DCP332 Appropriate treatment and allocation of Last Resort Supply Payment claim costs View summary
Part 1 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 12 Nov 2018 DCP333 Appropriate treatment and allocation of eligible use of system bad debt costs View summary
Part 2 Matter Implemented Andrew Enzor (NORTHERN POWERGRID (NORTHEAST) PLC) 12 Nov 2018 DCP334 Update to Schedule 15 ('Cost Information Table') to maintain alignment with the distribution licence View summary
Part 2 Matter Implemented Piers Merritt (BRITISH GAS TRADING LIMITED) 10 Oct 2018 DCP331 Right to Audit ETTOS Tip Off Investigations View summary
Part 2 Matter Implemented Andrew Sherry (ELECTRICITY NORTH WEST LIMITED) 21 Sept 2018 DCP329 Amend Requirements for Emergency De-energisation in Schedule 2B – National Terms of Connection View summary
Part 1 Matter Rejected Kara Burke (NORTHERN POWERGRID (NORTHEAST) PLC) 17 Aug 2018 DCP328 Use of system charging for private networks with competition in supply View summary
Part 2 Matter Implemented Hollie Nicholls (-) 11 Jul 2018 DCP324 National Grid Legal Separation Changes to the DCUSA View summary
Part 2 Matter Implemented Marvin Clare (OPUS ENERGY LIMITED) 11 Jul 2018 DCP327 Requirement to Provide Supplier Theft Contacts View summary
Part 2 Matter Implemented Kara Burke (NORTHERN POWERGRID (NORTHEAST) PLC) 11 Jul 2018 DCP325 Reviewing the requirements of Sections 35A ('Provision of Cost Information'), 35B ('Production of the Annual Review Pack'), Schedule 15 ('Cost Information Table') and Schedule 20 ('Production of the Annual Review Pack') View summary
Part 2 Matter Implemented Julie Jeffreys (-) 22 Jun 2018 DCP323 Removal of Unused Data Items View summary
Part 1 Matter Implemented Steven Gough (OVO (S) ELECTRICITY LIMITED) 20 Jun 2018 DCP326 Introduction of Load Diversification Identifiers for Load Managed Areas View summary
Part 2 Matter Implemented Piers Merritt (BRITISH GAS TRADING LIMITED) 13 Jun 2018 DCP322 ETTOS Tip-Offs Read and Response Timelines View summary
Part 2 Matter Implemented Angus Rae (SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC) 12 Jun 2018 DCP320 DCUSA Ltd Shareholder Provisions View summary
Part 1 Matter Withdrawn Andrew Enzor (NORTHERN POWERGRID (NORTHEAST) PLC) 12 Jun 2018 DCP321 Removal of residual charging for embedded generators in the EDCM View summary
Part 2 Matter Implemented Piers Merritt (BRITISH GAS TRADING LIMITED) 16 May 2018 DCP318 Theft Code of Practice Investigation and Reporting Processes View summary
Part 1 Matter Withdrawn Andrew Enzor (NORTHERN POWERGRID (NORTHEAST) PLC) 11 May 2018 DCP319 Removal of residual charging for embedded generators in the CDCM View summary
Part 2 Matter Implemented Paul Bedford (OPUS ENERGY LIMITED) 9 May 2018 DCP317 Amend the DCUSA 'Smart Meter Installation Forecast' reporting obligation to make use of the BEIS rollout profile template View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 3 Apr 2018 DCP316 General Data Protection Regulation Compliance for DCUSA View summary
Part 2 Matter Implemented Peter Waymont (-) 16 Feb 2018 DCP315 Housekeeping View summary
Part 1 Matter Withdrawn Donna Townsend (ESP ELECTRICITY LIMITED) 19 Jan 2018 DCP314 Appropriate treatment of Bad Debt following appointment of Supplier of Last Resort View summary
Part 1 Matter Implemented Andrew Enzor (NORTHERN POWERGRID (NORTHEAST) PLC) 20 Oct 2017 DCP311 Clarification of NUF cap and collar calculations View summary
Part 1 Matter Rejected Andrew Enzor (NORTHERN POWERGRID (NORTHEAST) PLC) 10 Oct 2017 DCP313 Eligibility Criteria for EDCM Generation Credits View summary
Part 1 Matter Implemented A Hodge (ESP ELECTRICITY LIMITED) 10 Oct 2017 DCP312 Standardisation of the Reporting of HH Portfolio Billing Data by EDNOs View summary
Part 2 Matter Implemented Andrew Sherry (ELECTRICITY NORTH WEST LIMITED) 21 Sept 2017 DCP308 Notice period to change Revenue Protection Agent View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 14 Sept 2017 DCP310 ENA Office Move View summary
Part 2 Matter Implemented A Hodge (-) 12 Sept 2017 DCP309 Reporting ETTOS Identified Theft to the TRAS Service Provider View summary
Part 1 Matter Withdrawn Claire Towler (SSE ENERGY SUPPLY LIMITED) 16 Aug 2017 DCP307 Requiring IDNOs to comply with D2021 billing View summary
Part 1 Matter Implemented Kevin Woollard (BRITISH GAS TRADING LIMITED) 25 Jul 2017 DCP288 Introduction of the Electricity Theft Detection Incentive Scheme View summary
Part 1 Matter Implemented Neil Brinkley (THE ELECTRICITY NETWORK COMPANY LIMITED) 19 Jul 2017 DCP306 Treatment of Ofgem Licence Fees within the PCDM View summary
Part 1 Matter Implemented Andrew Enzor (NORTHERN POWERGRID (NORTHEAST) PLC) 12 Jul 2017 DCP305 LDNO Boundary Level Definitions in the EDCM View summary
Part 1 Matter Implemented Kevin Woollard (BRITISH GAS TRADING LIMITED) 11 Jul 2017 DCP304 Metering Works by Non-Appointed Meter Operator View summary
Part 1 Matter Withdrawn Paul Morris (EASTERN POWER NETWORKS PLC) 22 Jun 2017 DCP302 Moving Made Safe Instances To Cat B View summary
Part 2 Matter Implemented Andy Knowles (UTILITA ENERGY LIMITED) 12 Jun 2017 DCP301 Update Schedule 25 – Appendix 2 data items View summary
Part 2 Matter Rejected Peter Waymont (EASTERN POWER NETWORKS PLC) 19 May 2017 DCP298 Notice of RAV View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 17 May 2017 DCP299 Clarify Distributor reporting requirement to the ETTOS Service Provider View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 17 May 2017 DCP300 Panel members and alternates View summary
Part 2 Matter Rejected Jeremy Guard (OCTOPUS ENERGY OPERATIONS 2 LIMITED) 24 Apr 2017 DCP303 Provision of Electricity Market-share data to SMICoP Limited View summary
Part 2 Matter Implemented Kevin Woollard (BRITISH GAS TRADING LIMITED) 21 Apr 2017 DCP296 Notification Process for Remedied DCUSA Payment Default(s) View summary
Part 1 Matter Rejected Kevin Woollard (BRITISH GAS TRADING LIMITED) 19 Apr 2017 DCP297 Network Interventions SLA Enhancement View summary
Part 1 Matter Implemented Thomas Cadge (THE ELECTRICITY NETWORK COMPANY LIMITED) 17 Mar 2017 DCP294 Capacity Management following acceptance of Connection Offer View summary
Part 1 Matter Implemented Richard Ellis (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 15 Mar 2017 DCP295 CVA Registrants acceding to the DCUSA View summary
Part 1 Matter Implemented Oliver Day (EASTERN POWER NETWORKS PLC) 14 Feb 2017 DCP293 Charging Methodology Cut-off Date View summary
Part 1 Matter Withdrawn Simon Yeo (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 10 Feb 2017 DCP291 Application of Generation Credits to EDCM Customers View summary
Part 2 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 10 Feb 2017 DCP292 Align DCUSA Schedule 15 table 3 to the CDCM tariff structure following the approval DCP 222 'Non billing of Excess Reactive Power Charges' View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 17 Jan 2017 DCP290 Housekeeping Change to Update PCDM Model References View summary
Part 1 Matter Withdrawn Johannes Nowak (MVV ENVIRONMENT SERVICES LIMITED) 22 Dec 2016 DCP287 Generation credits in the EDCM View summary
Part 1 Matter Implemented Chris Ong (SOUTH EASTERN POWER NETWORKS PLC) 16 Dec 2016 DCP289 Creation of Distribution Charging Methodology Development Group View summary
Part 2 Matter Rejected Peter Waymont (SOUTH EASTERN POWER NETWORKS PLC) 6 Dec 2016 DCP281 Changes to Schedule 19 – Portfolio Billing View summary
Part 1 Matter Withdrawn helen fosberry (E.ON ENERGY SOLUTIONS LIMITED) 9 Nov 2016 DCP286 Formalising the Theft Steering Group View summary
Part 1 Matter Rejected Johannes Nowak (MVV ENVIRONMENT SERVICES LIMITED) 21 Oct 2016 DCP283 The calculation of generation credits in the CDCM View summary
Part 1 Matter Withdrawn Johannes Nowak (MVV ENVIRONMENT SERVICES LIMITED) 21 Oct 2016 DCP284 The Application of Scaling to Generation Credits in the CDCM View summary
Part 2 Matter Implemented Kevin Woollard (BRITISH GAS TRADING LIMITED) 12 Oct 2016 DCP285 Schedule 23, Appendix 1 SLC References View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 23 Sept 2016 DCP282 Embedded Distribution Network Operator (EDNO) UMSO View summary
Part 2 Matter Implemented Andrew Sherry (ELECTRICITY NORTH WEST LIMITED) 26 Aug 2016 DCP279 Linking Credit Cover to the Annual Iteration Process View summary
Part 2 Matter Implemented Kevin Woollard (-) 18 Aug 2016 DCP280 Clarification of TRAS Accession Process View summary
Part 2 Matter Implemented helen fosberry (E.ON UK PLC) 22 Jul 2016 DCP277 Schedule 25 – Amendment to Appendix 2 Conditionality View summary
Part 1 Matter Implemented Maitrayee Bhowmick-Jewkes (NPOWER LIMITED) 20 Jul 2016 DCP278 Allocation of Users to the ETTOS Secure Email Service View summary
Part 2 Matter Implemented Angus Rae (SOUTHERN ELECTRIC POWER DISTRIBUTION PLC) 4 Jul 2016 DCP276 Amendments to CDCM LV Substation Tariff Note 5 View summary
Part 1 Matter Withdrawn Lee Wells (NEAS ENERGY LIMITED) 10 Jun 2016 DCP274 The Application of Export Capacity Charges in the EDCM View summary
Part 1 Matter Implemented Peter Waymont (-) 10 Jun 2016 DCP275 Code Governance Review 3 & SLC 22 View summary
Part 2 Matter Implemented Dan French (NPOWER LIMITED) 20 May 2016 DCP269 Revenue Protection Service Withdrawal Period View summary
Part 1 Matter Rejected Patricia Wormald (NORTHERN POWERGRID (YORKSHIRE) PLC) 20 May 2016 DCP270 Removal of HV Medium tariff from CDCM View summary
Part 2 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 18 May 2016 DCP273 Align CDCM table 1001 (target revenue) to latest Schedule 15 template View summary
Part 2 Matter Implemented Dan French (NPOWER LIMITED) 11 May 2016 DCP271 Process and Costs of Providing Additional Hunter Facilities View summary
Part 2 Matter Implemented helen fosberry (E.ON UK PLC) 11 May 2016 DCP272 TRAS Amendment of Schedule 25 Appendix 2 View summary
Part 2 Matter Implemented Graham Wood (BRITISH GAS TRADING LIMITED) 16 Mar 2016 DCP267 Introduction of a new definition for 'Confirmed Theft' View summary
Part 1 Matter Implemented Lee Wells (NORTHERN POWERGRID (NORTHEAST) PLC) 16 Mar 2016 DCP268 DUoS Charging Using HH settlement data View summary
Part 2 Matter Implemented Tim Hughes (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WEST) PLC) 16 Mar 2016 DCP265 High Cost Cap/Voltage Rule Precedence – revision to Schedule 22 of the DCUSA (the Common Connection Charging Methodology) View summary
Part 1 Matter Rejected George Moran (BRITISH GAS TRADING LIMITED) 9 Mar 2016 DCP266 The calculation and application of IDNO discounts View summary
Part 1 Matter Implemented helen fosberry (E.ON UK PLC) 15 Feb 2016 DCP264 Introduction of Energy Theft Tip Off Line Service View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 22 Jan 2016 DCP263 NTC DEH Gap View summary
Part 2 Matter Implemented Sasha Pearce (NPOWER LIMITED) 20 Jan 2016 DCP261 Use of Theft Assessment Calculator View summary
Part 2 Matter Implemented Michael Walls (ESP ELECTRICITY LIMITED) 13 Jan 2016 DCP262 Schedule 19 Credit/Re-invoice for HH Specific Data View summary
Part 2 Matter Implemented helen fosberry (E.ON UK PLC) 9 Dec 2015 DCP260 TRAS Incident Single Point of Contact View summary
Part 1 Matter Implemented Paul Morris (UK POWER DISTRIBUTION LIMITED) 20 Nov 2015 DCP253 Retightening and Remaking Of Whole Current Metering System Terminal Connections View summary
Part 2 Matter Implemented Brian Hoy (ELECTRICITY NORTH WEST LIMITED) 20 Nov 2015 DCP255 Changes to Electricity (Connection Charges) Regulations 2002 View summary
Part 1 Matter Implemented Paul McGimpsey (SP DISTRIBUTION PLC) 20 Nov 2015 DCP259 CMP223 – Enduring Generation User Commitment View summary
Part 2 Matter Implemented Lorna Mallon (SCOTTISHPOWER ENERGY RETAIL LIMITED) 11 Nov 2015 DCP257 Amendment to TRAS Data File Names View summary
Part 2 Matter Implemented Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 11 Nov 2015 DCP258 PCDM Model version post DCP 117 View summary
Part 1 Matter Implemented Kevin Woollard (-) 10 Nov 2015 DCP256 Change to DCUSA to mitigate risks of non-payment of non-payment of DCUSA invoices View summary
Part 1 Matter Rejected Andrew Burns (EFFORTLESS ENERGY LTD.) 4 Nov 2015 DCP254 TRAS De Minimis Threshold View summary
Part 1 Matter Rejected Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 15 Oct 2015 DCP251 Clarification And Extension Of The Application Of LDNO Tariffs Under The CDCM View summary
Part 1 Matter Rejected Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 15 Oct 2015 DCP252 Clarification And Extension Of The Application Of Portfolio Tariffs Under The EDCM View summary
Part 2 Matter Rejected Paul Morris (LONDON POWER NETWORKS PLC) 25 Sept 2015 DCP250 Supplier Roll Out Template View summary
Part 2 Matter Implemented Patricia Wormald (NORTHERN POWERGRID (NORTHEAST) PLC) 18 Sept 2015 DCP249 Changes to Schedule 15 spreadsheets to reflect RIIO ED1 View summary
Part 1 Matter Implemented Richard Vernon (NPOWER LIMITED) 17 Sept 2015 DCP247 Introduction of TRAS Dispute Procedure View summary
Part 1 Matter Implemented George Moran (-) 17 Sept 2015 DCP248 Providing protection for customers against being charged inappropriate capacity charges during the implementation of P272 View summary
Part 2 Matter Rejected Kevin Woollard (-) 3 Jul 2015 DCP246 Correction to unintended consequence of implementation of DCP 239 View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 30 Jun 2015 DCP245 Housekeeping re Schedule 24. View summary
Part 1 Matter Withdrawn Paul Morris (LONDON POWER NETWORKS PLC) 10 Jun 2015 DCP244 MOP Leaving Site for Cat A Situations View summary
Part 1 Matter Rejected Chris Ong (-) 5 Jun 2015 DCP243 Treatment of Customer Contributions in the CDCM View summary
Part 1 Matter Withdrawn David Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WALES) PLC) 18 May 2015 DCP242 Defer the Implementation of Changes to Excess Capacity Charges View summary
Part 1 Matter Withdrawn Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 12 May 2015 DCP241 Provision of a Single Charging and Cost Information Model View summary
Part 1 Matter Implemented Mo Sukumaran (SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC) 15 Apr 2015 DCP240 Nominated Calculation Agent to calculate the LV Mains Split View summary
Part 1 Matter Implemented Patricia Wormald (NORTHERN POWERGRID (NORTHEAST) PLC) 8 Apr 2015 DCP238 Notice Period for Non DUoS Charges View summary
Part 2 Matter Implemented Kevin Woollard (-) 8 Apr 2015 DCP239 Alignment of DCP 195A Smart Meter Installation Forecasts submission dates with DECC reporting View summary
Part 2 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 7 Apr 2015 DCP237 Housekeeping change associated with the definition of Prescribed Period and ESPR View summary
Part 1 Matter Implemented Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 20 Mar 2015 DCP233 Housekeeping change following implementation of DCP 189 View summary
Part 1 Matter Implemented Angus Rae (SOUTHERN ELECTRIC POWER DISTRIBUTION PLC) 17 Mar 2015 DCP236 Variation of Charges Notice Periods Embedded Networks View summary
Part 1 Matter Withdrawn Graham Smith (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WEST) PLC) 9 Mar 2015 DCP235 Provision of Service Termination Equipment Information View summary
Part 1 Matter Implemented Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 27 Feb 2015 DCP234 Merging the PCDM and extended PCDM View summary
Part 1 Matter Implemented David Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WALES) PLC) 18 Feb 2015 DCP232 GP and GL Solution View summary
Part 1 Matter Implemented David Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 11 Feb 2015 DCP230 Rate of Return Enduring Solution View summary
Part 1 Matter Implemented Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 28 Jan 2015 DCP231 Extended PCDM Under the EDCM View summary
Part 1 Matter Withdrawn David Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WEST) PLC) 14 Jan 2015 DCP229 Generic Import Charge for Generators View summary
Part 1 Matter Implemented George Moran (-) 13 Jan 2015 DCP227 Removing the inconsistency in the application of Peaking Probabilities in the CDCM View summary
Part 1 Matter Implemented George Moran (-) 13 Jan 2015 DCP228 Revenue Matching in the CDCM View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 5 Jan 2015 DCP226 Housekeeping 66/72/73/77/80 View summary
Part 1 Matter Implemented Kevin Woollard (-) 19 Dec 2014 DCP225 Theft Risk Assessment Service Party obligations View summary
Part 1 Matter Implemented Chris Ong (SOUTH EASTERN POWER NETWORKS PLC) 10 Dec 2014 DCP198 Align the PCDM Model with the Legal Text View summary
Part 1 Matter Withdrawn David Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 9 Dec 2014 DCP224 Rate of Return Enduring Solution View summary
Part 1 Matter Implemented Simon Yeo (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WEST) PLC) 2 Dec 2014 DCP222 Non billing of excess Reactive Power charges View summary
Part 2 Matter Implemented Patricia Wormald (NORTHERN POWERGRID (YORKSHIRE) PLC) 1 Dec 2014 DCP220 Correction Of Paragraphs 17 and 18 In Schedule 16 (CDCM) To Accurately Reflect Network Levels In The Network Model View summary
Part 2 Matter Withdrawn Peter Waymont (EASTERN POWER NETWORKS PLC) 26 Nov 2014 DCP221 Model Version View summary
Part 1 Matter Withdrawn Donna Townsend (ESP ELECTRICITY LIMITED) 26 Nov 2014 DCP223 To Introduce into Governance a Process to Effectively Manage the Late Payment of DCUSA Ltd Invoices by Parties View summary
Part 2 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 7 Oct 2014 DCP218 Licence Derogation Notification View summary
Part 2 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 7 Oct 2014 DCP219 DCUSA Housekeeping changes View summary
Part 1 Matter Implemented Chris Ong (EASTERN POWER NETWORKS PLC) 18 Sept 2014 DCP217 Rate of Return View summary
Part 2 Matter Implemented Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 10 Sept 2014 DCP216 Amending The EDCM Model Format View summary
Part 1 Matter Implemented Richard Vernon (NPOWER LIMITED) 29 Jul 2014 DCP215 The Inclusion of a Theft Assessment Calculator within DCUSA View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 16 Jul 2014 DCP214 Voting View summary
Part 1 Matter Withdrawn Donna Townsend (ESP ELECTRICITY LIMITED) 7 Jul 2014 DCP213 Providing Clarity on Late Payment of DCUSA Invoices being considered in Breach of DCUSA View summary
Part 1 Matter Implemented Chris Ong (SOUTH EASTERN POWER NETWORKS PLC) 27 May 2014 DCP212 Align the Extended PCDM Model with the Legal Text View summary
Part 1 Matter Rejected Alex Greetham (LONDON POWER NETWORKS PLC) 20 May 2014 DCP211 Enhance transparency of DCUSA change management View summary
Part 1 Matter Implemented Chris Allanson (NORTHERN POWERGRID (NORTHEAST) PLC) 8 May 2014 DCP209 Resolving Unregistered Customers View summary
Part 1 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 8 May 2014 DCP210 The Assessment timetable View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 23 Apr 2014 DCP208 Non-veto of derogations View summary
Part 1 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 24 Mar 2014 DCP207 Amending Licence & DCUSA Derogation Scope View summary
Part 1 Matter Rejected Glenn Sheern (E.ON ENERGY SOLUTIONS LIMITED) 13 Mar 2014 DCP206 Removal of Charge 1 from the EDCM View summary
Part 1 Matter Rejected Catherine Falconer (SOUTHERN ELECTRIC POWER DISTRIBUTION PLC) 12 Mar 2014 DCP205 Recovery of costs due to load and generation increases from existing customers in RIIO-ED1 View summary
Part 1 Matter Implemented Angus Rae (SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC) 27 Feb 2014 DCP204 Smart Metering Related Amendments to Schedule 8 View summary
Part 1 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 10 Feb 2014 DCP203 The Rationalisation of Discount Factors used to Determine LDNO Use of System Tariffs relating to UMS Connections on Embedded Distribution Networks and the associated LDNO tariffs View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 16 Jan 2014 DCP202 Abolition Of National Consumer Council View summary
Part 1 Matter Implemented Glenn Sheern (E.ON ENERGY SOLUTIONS LIMITED) 13 Jan 2014 DCP201 Provisions For The Theft Risk Assessment Service (TRAS) View summary
Part 1 Matter Implemented Tim Hughes (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WEST) PLC) 1 Jan 2014 DCP200 Unmetered Supplies – revision to Schedule 22 of the DCUSA (the Common Connection Charging Methodology) View summary
Part 2 Matter Withdrawn Alex Greetham (SOUTH EASTERN POWER NETWORKS PLC) 12 Dec 2013 DCP199 Housekeeping Change To Remove Duplicated Definitions View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 10 Dec 2013 DCP197 PCDM Model version post DCP118 View summary
Part 1 Matter Rejected Glenn Sheern (E.ON UK PLC) 26 Nov 2013 DCP196 Panel Ability To Refer A Change Proposal To The DCUSA Standing Issues Group For Pre-assessment. View summary
Part 1 Matter Implemented Glenn Sheern (E.ON ENERGY SOLUTIONS LIMITED) 14 Nov 2013 DCP195 Service Level Agreement for Resolving Network Operational Issues View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 13 Nov 2013 DCP194 Panel sending back Change Reports View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 13 Nov 2013 DCP193 Panel Editing Change Reports View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 13 Nov 2013 DCP192 Costs v. Budget View summary
Part 1 Matter Rejected John Lawton (ELECTRICITY NORTH WEST LIMITED) 31 Oct 2013 DCP158 DNO DUoS Re EDNOs View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 17 Oct 2013 DCP191 Publication of Revenue Protection Code of Practice View summary
Part 1 Matter Rejected Bob Weaver (-) 18 Sept 2013 DCP190 Credit for equipment recovery associated with temporary connections View summary
Part 1 Matter Implemented Wendy Mantle (SP MANWEB PLC) 12 Aug 2013 DCP189 Un-expired capitalised O&M View summary
Part 1 Matter Implemented Wendy Mantle (SP MANWEB PLC) 12 Aug 2013 DCP188 Addition of Black and Yellow Tariff to Portfolio Billing View summary
Part 1 Matter Withdrawn David Wornell (NATIONAL GRID ELECTRICITY DISTRIBUTION (SOUTH WALES) PLC) 12 Aug 2013 DCP183 To Convert the super red KWH to KVA when calculating the EDCM tariffs View summary
Part 2 Matter Rejected Sasha Pearce (NPOWER LIMITED) 2 Aug 2013 DCP187 Changes to Requirements to Provide Metering Data View summary
Part 1 Matter Implemented Chris Ong (SOUTH EASTERN POWER NETWORKS PLC) 19 Jul 2013 DCP185 LDNO discount on 20% of residual revenue View summary
Part 2 Matter Implemented Lorna Mallon (SCOTTISHPOWER ENERGY RETAIL LIMITED) 10 Jul 2013 DCP184 Housekeeping change following implementation of DCP127 View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 8 Jul 2013 DCP186 SEC Consequential Changes View summary
Part 1 Matter Implemented Gillian Miller (SP DISTRIBUTION PLC) 24 Jun 2013 DCP182 Removal of Disconnection Notice View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 17 Jun 2013 DCP181 Previous Connection Terms Enduring View summary
Part 1 Matter Implemented Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 12 Jun 2013 DCP179 Amending the CDCM tariff structure View summary
Part 1 Matter Withdrawn Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 12 Jun 2013 DCP180 Further reduction in the volatility of Use of System Charges View summary
Part 1 Matter Implemented Patricia Wormald (NORTHERN POWERGRID (NORTHEAST) PLC) 11 Jun 2013 DCP178 Notification period for change to use of system charges View summary
Part 1 Matter Implemented Alex Greetham (SOUTH EASTERN POWER NETWORKS PLC) 4 Jun 2013 DCP176 Housekeeping Change for Disconnection Definition View summary
Part 1 Matter Implemented Alex Greetham (SOUTH EASTERN POWER NETWORKS PLC) 4 Jun 2013 DCP175 Add National Terms of Connection Version Control View summary
Part 2 Matter Implemented Alex Greetham (SOUTH EASTERN POWER NETWORKS PLC) 4 Jun 2013 DCP177 Housekeeping change relating to DCP 127 to allow Gas Suppliers accession to DCUSA View summary
Part 1 Matter Implemented Patricia Wormald (NORTHERN POWERGRID (NORTHEAST) PLC) 23 May 2013 DCP174 Qualification and Application of LV Sub-Station Tariffs View summary
Part 1 Matter Withdrawn Chris Ong (EASTERN POWER NETWORKS PLC) 17 May 2013 DCP173 Retrospective changes of Tariff (LLFC / Unique Identifier) View summary
Part 1 Matter Implemented Deborah Macpherson (SP DISTRIBUTION PLC) 30 Apr 2013 DCP172 Clarification of way in which voltage rise is used in determining the New Network Capacity View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 2 Apr 2013 DCP170 Code Governance Review Phase 2 View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 2 Apr 2013 DCP171 Housekeeping re Black Yellow Green View summary
Part 1 Matter Withdrawn Chris Ong (SOUTH EASTERN POWER NETWORKS PLC) 13 Mar 2013 DCP169 Seasonal Time of Day (SToD) HH Metered Tariffs in the CDCM View summary
Part 1 Matter Withdrawn Donna Townsend (ESP ELECTRICITY LIMITED) 14 Feb 2013 DCP168 The Administration of Use of System charges relating to connections from Embedded Distribution Network Operator (EDNO) systems to Unmetered Supplies (UMS) for LA customers. View summary
Part 1 Matter Rejected Neil Magrath (EASTERN POWER NETWORKS PLC) 13 Feb 2013 DCP167 Additional Example(s) For The Common Connection Charging Methodology To Illustrate 'Remote Reinforcement' and 'Network Reconfiguration' View summary
Part 1 Matter Rejected Neil Magrath (EASTERN POWER NETWORKS PLC) 13 Feb 2013 DCP166 Additional text for the DNO Common Connection Charging Methodology to provide clarity where a customer requests a supply voltage in excess of the minimum scheme for the capacity requested. View summary
Part 1 Matter Implemented Patricia Wormald (NORTHERN POWERGRID (NORTHEAST) PLC) 13 Feb 2013 DCP163 Removal of HVS Tariffs from the CDCM Methodology View summary
Part 1 Matter Withdrawn Gavin Baker (SMARTESTENERGY LIMITED) 12 Feb 2013 DCP165 Voltage Level Approach to Unit Charges in the CDCM View summary
Part 1 Matter Rejected Patricia Wormald (NORTHERN POWERGRID (YORKSHIRE) PLC) 12 Feb 2013 DCP164 Review of the change process for Use of System methodology changes View summary
Part 1 Matter Rejected Neil Magrath (EASTERN POWER NETWORKS PLC) 7 Feb 2013 DCP162 Non Secure Connections in the Common Connection Charging Methodology View summary
Part 1 Matter Implemented Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 6 Feb 2013 DCP161 Excess Capacity Charges View summary
Part 1 Matter Implemented Peter Waymont (-) 24 Jan 2013 DCP024 Green Deal Arrangements View summary
Part 1 Matter Rejected Oliver Day (SOUTH EASTERN POWER NETWORKS PLC) 10 Jan 2013 DCP160 Non-Half Hourly (NHH) Notional Capacity View summary
Part 1 Matter Withdrawn George Moran (BRITISH GAS TRADING LIMITED) 8 Jan 2013 DCP159 Volumes data in the CDCM View summary
Part 2 Matter Implemented Peter Waymont (-) 14 Nov 2012 DCP156 Update to derogation clause View summary
Part 1 Matter Withdrawn Donna Townsend (ESP ELECTRICITY LIMITED) 14 Nov 2012 DCP157 Amendment to the status of a CP View summary
Part 1 Matter Withdrawn Kevin Woollard (BRITISH GAS TRADING LIMITED) 10 Oct 2012 DCP155 Amendment to the Intent of a CP View summary
Part 1 Matter Implemented Jonathan Wisdom (NPOWER LIMITED) 18 Aug 2012 DCP150 Implementation of Notice in DCUSA for Changes to certain CDCM Inputs View summary
Part 1 Matter Implemented Patricia Wormald (NORTHERN POWERGRID (NORTHEAST) PLC) 8 Aug 2012 DCP152 Implementation of the combined EDCM for import and export charges View summary
Part 1 Matter Rejected Kevin Woollard (BRITISH GAS TRADING LIMITED) 8 Aug 2012 DCP153 Service Level Agreement for Resolving Network Operational Issues View summary
Part 1 Matter Implemented Brian Hoy (ELECTRICITY NORTH WEST LIMITED) 18 Jul 2012 DCP140 Inclusion of the Common Connection Charging Methodology into the DCUSA View summary
Part 1 Matter Implemented Glenn Sheern (E.ON UK PLC) 18 Jul 2012 DCP142 Using D2021 for all invoices/credit notes if it is used at all View summary
Part 1 Matter Implemented Glenn Sheern (E.ON UK PLC) 18 Jul 2012 DCP144 Prohibiting rounding of HH data View summary
Part 1 Matter Rejected Glenn Sheern (E.ON UK PLC) 18 Jul 2012 DCP145 Mandating compliance with D2021 processes View summary
Part 1 Matter Rejected Glenn Sheern (E.ON UK PLC) 18 Jul 2012 DCP143 Estimating missing reactive data View summary
Part 1 Matter Rejected Glenn Sheern (E.ON UK PLC) 18 Jul 2012 DCP141 Invalid settlement classes View summary
Part 1 Matter Rejected George Moran (BRITISH GAS TRADING LIMITED) 18 Jul 2012 DCP139 Non-Application of FCP charge for Category 0000 Customers View summary
Part 1 Matter Implemented Glenn Sheern (E.ON ENERGY SOLUTIONS LIMITED) 10 Jul 2012 DCP146 HH Invoice Runs View summary
Part 1 Matter Implemented Glenn Sheern (E.ON ENERGY SOLUTIONS LIMITED) 10 Jul 2012 DCP147 Preventing UoS invoices containing non-UoS elements. View summary
Part 1 Matter Implemented Glenn Sheern (E.ON ENERGY SOLUTIONS LIMITED) 10 Jul 2012 DCP148 Rebilling to be done via Credit/Re-Bill View summary
Part 1 Matter Rejected Glenn Sheern (E.ON ENERGY SOLUTIONS LIMITED) 10 Jul 2012 DCP149 Prohibiting HH invoices containing data from 2 different clock time calendar months View summary
Part 1 Matter Withdrawn John Lawton (ELECTRICITY NORTH WEST LIMITED) 28 Jun 2012 DCP151 HH Aggregated tariffs View summary
Part 1 Matter Implemented George Moran (BRITISH GAS TRADING LIMITED) 20 Jun 2012 DCP136 Notice period for Asset Cost Changes in the CDCM View summary
Part 1 Matter Implemented Hui Heng (SSE ENERGY SUPPLY LIMITED) 18 Jun 2012 DCP138 Implementation of alternative network use factor (NUF) calculation method in EDCM View summary
Part 2 Matter Withdrawn Chris Ong (EASTERN POWER NETWORKS PLC) 13 Jun 2012 DCP135 Clarification of CDCM Changes View summary
Part 1 Matter Rejected Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 13 Jun 2012 DCP137 Introduction of locational tariffs for the export from HV generators in areas identified as generation dominated. View summary
Part 1 Matter Rejected Peter Waymont (EASTERN POWER NETWORKS PLC) 10 May 2012 DCP133 500MW Network Common Model for CDCM Input View summary
Part 1 Matter Implemented Daniel Hickman (NPOWER LIMITED) 9 May 2012 DCP134 Implementation of notice in DCUSA for changes to distribution time-bands View summary
Part 1 Matter Implemented George Moran (-) 9 May 2012 DCP132 Improving the transparency of CDCM target revenue View summary
Part 2 Matter Implemented George Moran (-) 9 May 2012 DCP131 Improving the predictability and transparency of CDCM Inputs View summary
Part 1 Matter Implemented Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 9 May 2012 DCP130 Remove the discrepancy between non-half hourly (NHH) and half hourly (HH) Un-metered Supplies (UMS) tariffs View summary
Part 1 Matter Implemented Mike Harding (-) 11 Apr 2012 DCP129 Bringing the CDCM Price Control Disaggregation (Method M) under the DCUSA Open Governance Framework View summary
Part 1 Matter Implemented Mike Harding (-) 11 Apr 2012 DCP128 Bringing the EDCM Price Control Disaggregation (Extended Method M) under the DCUSA Open Governance Framework View summary
Part 1 Matter Implemented Kevin Woollard (-) 4 Apr 2012 DCP127 Gas First Smart Meter Installation View summary
Part 1 Matter Rejected Matthew Paige-Stimson (EASTERN POWER NETWORKS PLC) 21 Mar 2012 DCP124 Third Party Network – National Connection Terms Amendments View summary
Part 1 Matter Implemented Antony Badger (DRAX ENERGY SOLUTIONS LIMITED) 20 Mar 2012 DCP126 Require DNOs to publish and update year-ahead forecasts of DUoS tariffs View summary
Part 1 Matter Withdrawn Antony Badger (DRAX ENERGY SOLUTIONS LIMITED) 20 Mar 2012 DCP125 Limit increases to DUoS tariffs to 20% in one year View summary
Part 2 Matter Implemented Chris Allanson (NORTHERN POWERGRID (NORTHEAST) PLC) 15 Feb 2012 DCP122 EU 3rd Package Housekeeping Amendments View summary
Part 2 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 15 Feb 2012 DCP121 Update To Clause 9.5 So That Any Changes to Schedules 19 And 21 Become a Part 1 Matter View summary
Part 1 Matter Rejected Simon Yeo (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 15 Feb 2012 DCP123 Revenue Matching Methodology Change View summary
Part 2 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 18 Jan 2012 DCP119 Update to Nested Networks Schedule View summary
Part 1 Matter Withdrawn John Mills (-) 18 Jan 2012 DCP120 Boundary Registrant Access Provisions View summary
Part 2 Matter Implemented Chris Allanson (NORTHERN POWERGRID (NORTHEAST) PLC) 14 Dec 2011 DCP116 Clause 25.4 Update View summary
Part 1 Matter Implemented Paul McGimpsey (SP DISTRIBUTION PLC) 7 Dec 2011 DCP115 NTC Amendments – Capacity Management (Under Utilisation) View summary
Part 1 Matter Implemented Paul McGimpsey (SP DISTRIBUTION PLC) 7 Dec 2011 DCP114 NTC Amendments – Capacity Management (Over Utilisation) View summary
Part 2 Matter Rejected Tony Savka (ELECTRICITY NORTH WEST LIMITED) 7 Dec 2011 DCP111 E Billing for Site Specific Bills View summary
Part 1 Matter Withdrawn Tony Savka (ELECTRICITY NORTH WEST LIMITED) 7 Dec 2011 DCP112 Inclusion of the Common Connection Charging Methodology and Common Connection Charging Template into the DCUSA View summary
Part 1 Matter Withdrawn Tony Savka (ELECTRICITY NORTH WEST LIMITED) 7 Dec 2011 DCP113 Distributors to Audit Meter Installations and Invoice were mismatched meter installations are identified View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 18 Nov 2011 DCP110 Electricity and Gas (Internal Markets) Regulations 2011 View summary
Part 1 Matter Implemented Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 13 Nov 2011 DCP118 Allocation of EHV Costs in the CDCM Price Disaggregation Model. View summary
Part 1 Matter Implemented Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 13 Nov 2011 DCP117 Treatment of load related new connections & reinforcement (net of contributions) in the price control disaggregation model View summary
Part 1 Matter Implemented Peter Waymont (-) 12 Oct 2011 DCP109 Implementation of the EDCM View summary
Part 1 Matter Rejected Jonathan Purdy (EASTERN POWER NETWORKS PLC) 10 Oct 2011 DCP108 Availability of the non Intermittent Generator Tariff View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 10 Oct 2011 DCP107 Update of Cross-References in Clause 11 View summary
Part 1 Matter Rejected Helen Inwood (NPOWER LIMITED) 31 Aug 2011 DCP104 Shared Impact of Manifest Errors in DUoS Charging View summary
Part 1 Matter Rejected Helen Inwood (NPOWER LIMITED) 31 Aug 2011 DCP105 Fixed Bi-Annual Amendment of DUoS Tariffs. View summary
Part 1 Matter Rejected Helen Inwood (NPOWER LIMITED) 31 Aug 2011 DCP106 Visibility to DCUSA Parties Regarding Applications to the Authority by DNO's to Change Allowed Revenue View summary
Part 2 Matter Implemented Jennifer Higgins (NPOWER LIMITED) 20 Jul 2011 DCP102 Credit Cover calculation of 15 day value View summary
Part 2 Matter Rejected Jennifer Higgins (NPOWER LIMITED) 20 Jul 2011 DCP101 Notification of RAV changes View summary
Part 1 Matter Withdrawn Kevin Woollard (BRITISH GAS TRADING LIMITED) 20 Jul 2011 DCP103 DUoS Charges for sub 100kw HH settled sites View summary
Part 2 Matter Rejected Sasha Pearce (NPOWER LIMITED) 20 Jul 2011 DCP100 Payment Timescales Alignment and Simplification View summary
Part 2 Matter Implemented Mark James (EASTERN POWER NETWORKS PLC) 20 Jul 2011 DCP099 Change to Schedule 1 – Cover View summary
Part 1 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 13 Jul 2011 DCP098 DCUSA Criteria for Urgent Change Proposals View summary
Part 1 Matter Implemented Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 8 Jun 2011 DCP096 Treatment Of Transmission Exit Charges In CDCM Price Control Disaggregation Model (Method M) View summary
Part 1 Matter Implemented Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 8 Jun 2011 DCP095 Treatment of LV Costs in the Price Control Disaggregation Model in Determining Tariffs to LDNOS Connecting to Upstream LDNOS at LV View summary
Part 1 Matter Rejected Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 8 Jun 2011 DCP097 Changes to the Method of Cost Allocation Employed in the Price Control Disaggregation Model for DNO Indirect Cost Categories Specifically Associated with the Volume of Customers Using The DNO Network View summary
Part 1 Matter Rejected Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 8 Jun 2011 DCP094 Treatment of 'Load Related New Connections & Reinforcement (Net of Contributions)' in the Price Control Disaggregation Model Used to Determine LDNO Discount Factors View summary
Part 2 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 8 Jun 2011 DCP093 Housekeeping Update to Schedule 19 View summary
Part 1 Matter Implemented Chris Allanson (NORTHERN POWERGRID (YORKSHIRE) PLC) 11 May 2011 DCP092 Deletion of Clause 13.10 View summary
Part 1 Matter Rejected Kevin Woollard (BRITISH GAS TRADING LIMITED) 5 May 2011 DCP080 Theft in Conveyance View summary
Part 1 Matter Rejected Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 21 Apr 2011 DCP071 Allocation of Cost to HV Connected IDNOs with LV End Users View summary
Part 1 Matter Rejected Andrew Pace (ELECTRICITY NORTH WEST LIMITED) 13 Apr 2011 DCP091 Publication of Tariffs and Annual Charge Estimates View summary
Part 1 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 13 Apr 2011 DCP090 Nested Networks View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 6 Apr 2011 DCP089 DNO (I)DNO Billing View summary
Part 1 Matter Implemented John Hill (NATIONAL GRID ELECTRICITY DISTRIBUTION (EAST MIDLANDS) PLC) 9 Mar 2011 DCP087 Smoothing Load Characteristics And Peaking View summary
Part 1 Matter Implemented Glenn Sheern (E.ON UK PLC) 9 Mar 2011 DCP085 Process for Determining Urgent Status View summary
Part 2 Matter Implemented Andy Jenkins (NORTHERN POWERGRID (NORTHEAST) PLC) 9 Mar 2011 DCP086 Introduction of the Annual Review Pack View summary
Part 1 Matter Rejected Claire Campbell (SP DISTRIBUTION PLC) 9 Mar 2011 DCP088 Mid Year CDCM Charging Model View summary
Part 1 Matter Withdrawn Peter Waymont (EASTERN POWER NETWORKS PLC) 9 Mar 2011 DCP083 Customer Details View summary
Part 1 Matter Rejected John Lawton (ELECTRICITY NORTH WEST LIMITED) 9 Feb 2011 DCP084 User Requirements Associated With Provision Of Cost Information View summary
Part 1 Matter Withdrawn Sasha Pearce (NPOWER LIMITED) 9 Feb 2011 DCP082 Consideration of Wider Industry Developments and Duration of Proposed Changes When Agreeing Progression Timetables View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 24 Jan 2011 DCP081 Authority Decision Making Process View summary
Part 2 Matter Implemented Colin Prestwich (SMARTESTENERGY LIMITED) 12 Jan 2011 DCP078 Reciprocal DUoS Payment Arrangements View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 12 Jan 2011 DCP079 Statutory Application of NTC View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 10 Nov 2010 DCP076 DCP 072 Legal Drafting Update View summary
Part 1 Matter Implemented Tony Savka (ELECTRICITY NORTH WEST LIMITED) 10 Nov 2010 DCP077 CDCM change – Rate of Return % View summary
Part 1 Matter Rejected Kevin Woollard (BRITISH GAS TRADING LIMITED) 18 Oct 2010 DCP066 Enhanced Provision of Cost Information View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 13 Oct 2010 DCP075 Voting Arrangements for a Party Category with Few Members View summary
Part 2 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 8 Sept 2010 DCP074 Portfolio Billing Schedule Re-numbering View summary
Part 2 Matter Implemented Peter Waymont (-) 8 Sept 2010 DCP073 Insert Footers in Document for Easier Navigation. View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 23 Aug 2010 DCP072 Environmental Assessment of CPs View summary
Part 2 Matter Implemented Chris Allanson (NORTHERN POWERGRID (NORTHEAST) PLC) 18 Aug 2010 DCP070 Housekeeping Amendments to DCP 065 View summary
Part 2 Matter Implemented Sasha Pearce (NPOWER LIMITED) 21 Jul 2010 DCP069 Clarity on the Disclosure of Confidential Information View summary
Part 1 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 21 Jul 2010 DCP068 Clarification of Clause 12.10 View summary
Part 2 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 21 Jul 2010 DCP067 Companies Act 2006 Update View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 5 May 2010 DCP065 Impact of any licence changes as a consequence of DPCR 5 View summary
Part 1 Matter Implemented Chris Allanson (NORTHERN POWERGRID (NORTHEAST) PLC) 5 May 2010 DCP064 DCUSA Amendments in relation to the Electricity (Standards of Performance) Regulations 2005. View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 1 Apr 2010 DCP063 Voting Arrangements for IDNOs under Clause 12 View summary
Part 1 Matter Withdrawn Alex Thomason (-) 8 Mar 2010 DCP062 Grid Code Compliance View summary
Part 2 Matter Implemented Glenn Sheern (E.ON UK PLC) 5 Mar 2010 DCP061 Notices Served on the Panel View summary
Part 1 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 10 Feb 2010 DCP060 Introduction of Portfolio Billing Alternative Solution. View summary
Part 1 Matter Implemented Peter Waymont (LONDON POWER NETWORKS PLC) 21 Dec 2009 DCP059 Implementation of CDCM View summary
Part 1 Matter Implemented Donna Townsend (ESP ELECTRICITY LIMITED) 24 Nov 2009 DCP058 Late Payment Interest on Cost Contribution Invoices View summary
Part 1 Matter Rejected Peter Waymont (EASTERN POWER NETWORKS PLC) 17 Nov 2009 DCP056 DCUSA Procurement View summary
Part 1 Matter Rejected Glenn Sheern (E.ON UK PLC) 17 Nov 2009 DCP057 Flexible Funding Model View summary
Part 1 Matter Implemented Tony Savka (ELECTRICITY NORTH WEST LIMITED) 21 Oct 2009 DCP054 Revenue Protection/Unrecorded Units into Settlements View summary
Part 1 Matter Implemented Kevin Woollard (-) 21 Oct 2009 DCP053 Incident Management View summary
Part 2 Matter Implemented Glenn Sheern (E.ON ENERGY SOLUTIONS LIMITED) 21 Oct 2009 DCP052 Material Breach Notices View summary
Part 1 Matter Implemented Lorna Mallon (SCOTTISHPOWER ENERGY RETAIL LIMITED) 21 Oct 2009 DCP055 Provision of Annual Rota Block Data To Suppliers View summary
Part 2 Matter Rejected Glenn Sheern (E.ON ENERGY SOLUTIONS LIMITED) 21 Oct 2009 DCP051 Confirmation of Delivery of Use of System Invoicing View summary
Part 1 Matter Implemented Kevin Woollard (-) 4 Sept 2009 DCP050 Provision of Cost Information – Regular Meeting View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 3 Sept 2009 DCP048 Housekeeping Amendments to DCUSA Definitions and Schedule 9. View summary
Part 2 Matter Implemented Glenn Sheern (E.ON UK PLC) 3 Sept 2009 DCP049 Housekeeping amendments to Schedule 14 View summary
Part 1 Matter Rejected Chris Allanson (NORTHERN POWERGRID (NORTHEAST) PLC) 24 Aug 2009 DCP046 Common Distribution Charging Methodology Governance View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 24 Aug 2009 DCP047 Schedule 12 View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 8 Jul 2009 DCP045 Connection Terms Change Notification View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 10 Mar 2009 DCP044 MOCOPA View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 6 Mar 2009 DCP042 De-registration following Disconnection View summary
Part 2 Matter Implemented Glenn Sheern (E.ON UK PLC) 5 Mar 2009 DCP043 Creation of DCUSA Standing Issues Group View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 19 Feb 2009 DCP041 Deletion Of Event Log View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 4 Feb 2009 DCP040 Part 2a Change to clarify number and timing of changes to charges toSuppliers. View summary
Part 1 Matter Implemented Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 2 Feb 2009 DCP039 Part 2B – Change to notice period provisions for changes to charges to IDNOs View summary
Part 1 Matter Withdrawn Peter Waymont (EASTERN POWER NETWORKS PLC) 21 Jan 2009 DCP038 De-energisation by Non-Industry Parties View summary
Part 1 Matter Rejected Peter Waymont (EASTERN POWER NETWORKS PLC) 11 Dec 2008 DCP037 Moving Meters View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 19 Nov 2008 DCP036 Housekeeping Amendments to DCUSA v2.6 View summary
Part 2 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 6 Aug 2008 DCP035 Distribution and Supply Licence Reviews consequentialchanges View summary
Part 1 Matter Rejected Glenn Sheern (E.ON UK PLC) 31 Jul 2008 DCP018 Clarification of provision of metering data View summary
Part 1 Matter Implemented Mike Harding (THE ELECTRICITY NETWORK COMPANY LIMITED) 23 Jul 2008 DCP034 Credit Cover Arrangements for small Suppliers View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 17 Jul 2008 DCP033 Connection Terms View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 24 Jun 2008 DCP032 ENA Address Change View summary
Part 1 Matter Withdrawn Stephen Stripling (EDF ENERGY CUSTOMERS LIMITED) 19 Jun 2008 DCP031 Clarification of Use of Estimated Data Prepared by the Company View summary
Part 1 Matter Rejected Paul McGimpsey (SP DISTRIBUTION PLC) 12 Jun 2008 DCP030 Provision of cost information View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 11 Jun 2008 DCP027 Invoicing View summary
Part 1 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 11 Jun 2008 DCP028 Timescales associated with cheque processing View summary
Part 1 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 11 Jun 2008 DCP029 Part 1 Housekeeping View summary
Part 1 Matter Rejected Glenn Sheern (E.ON UK PLC) 2 Jun 2008 DCP026 Provision of Urgent Metering Services View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 22 May 2008 DCP025 Ofgem Notices View summary
Part 2 Matter Rejected Glenn Sheern (E.ON UK PLC) 12 May 2008 DCP023 The Creation of a DCUSA Issues Resolution Working Group (DIRWG) View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 16 Apr 2008 DCP022 Annual Rebates by Cheque View summary
Part 1 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 9 Apr 2008 DCP021 Distribution Standard Licence Condition 4a review (DCP009) affecting Section 2B View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 26 Mar 2008 DCP020 Housekeeping re DCP012/009 View summary
Part 1 Matter Rejected Peter Waymont (EASTERN POWER NETWORKS PLC) 14 Mar 2008 DCP019 Moving Meters With Service Alterations View summary
Part 2 Matter Rejected Glenn Sheern (E.ON UK PLC) 28 Feb 2008 DCP017 Establishment of a regular billing cycle for site specific billing View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 18 Jan 2008 DCP016 More Open Website View summary
Part 1 Matter Rejected Marie Clark (SCOTTISHPOWER ENERGY RETAIL LIMITED) 14 Jan 2008 DCP015 Limitation on claiming DCUSA expenses to one attendee per Group within a Party Category per meeting View summary
Part 1 Matter Implemented Marie Clark (SCOTTISHPOWER ENERGY RETAIL LIMITED) 5 Dec 2007 DCP013 Limitation on time frame for claiming DCUSA expenses View summary
Part 1 Matter Implemented Marie Clark (SCOTTISHPOWER ENERGY RETAIL LIMITED) 5 Dec 2007 DCP014 Amendments to Clause 8 Cost of the DCUSA" View summary
Part 1 Matter Rejected Peter Waymont (EASTERN POWER NETWORKS PLC) 29 Nov 2007 DCP012 Introduction of contractual arrangements for the provision of use of system between one distributor and another distributor. View summary
Part 1 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 2 Nov 2007 DCP011 Distribution Standard Licence Condition 36, 36A & 36C Review View summary
Part 1 Matter Implemented Glenn Sheern (E.ON UK PLC) 15 Oct 2007 DCP010 Notification and publication of rota load block alpha identifier View summary
Part 1 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 8 Oct 2007 DCP009 Distribution Standard Licence Condition 4a review View summary
Part 1 Matter Rejected John Lawton (ELECTRICITY NORTH WEST LIMITED) 4 Sept 2007 DCP008 Provision of Urgent Metering Services View summary
Part 1 Matter Withdrawn Glenn Sheern (E.ON UK PLC) 18 Jul 2007 DCP005 Change to the notification period for Non-Standard Connection Terms View summary
Part 1 Matter Implemented John Lawton (ELECTRICITY NORTH WEST LIMITED) 9 Jul 2007 DCP006 Communication re Damage or Interference – Modification to DCP003 View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 4 Jul 2007 DCP007 Change Determination Notices To Distributors View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 5 Jun 2007 DCP004 Abstention by Entire Category View summary
Part 1 Matter Implemented Peter Waymont (EASTERN POWER NETWORKS PLC) 11 Apr 2007 DCP003 Communication re Damage or Interference View summary
Part 1 Matter Rejected Glenn Sheern (E.ON UK PLC) 28 Feb 2007 DCP002 Removal of the ability of parties to recover travelling costs associated with Panel or Working group meetings View summary
Part 1 Matter Rejected Gaz de France Marketing (-) 11 Jan 2007 DCP001 Proposed move to annual amendment of DUoS Charges View summary
Part 2 Matter assessment Peter Waymont (EASTERN POWER NETWORKS PLC) DCP470 Independent Credit Assessments View summary