Issue Assessment OVO Energy 4 Aug 2026 Issue 119 Understanding and assurance of increasing of LLF and GCF View summary
Modification Assessment Flexitricity 5 Mar 2026 P510 Introducing Direct Compensation for Virtual Trading Party actions in the Wholesale Market View summary Ofgem
Modification Raised Voltalis 5 Mar 2026 P509 Consumer benefits and safety net for DSR participation in the wholesale market View summary Ofgem
Modification Assessment NESO 5 Mar 2026 P508 Consequential change for GC0179 - removal of TERRE View summary Ofgem
Change Proposal Assessment Elexon 3 Feb 2026 CP1631 Update BSCP707 Appendix 2 to align with ISD process View summary
Change Proposal Assessment Elexon 3 Feb 2026 CP1630 Alignment of NHH Deemed Read Timescales in BSCP708 to BSCP504 View summary
Change Proposal Rejected Elexon 7 Jan 2026 CP1629 Deferred implementation of ‘Data Refresh’ message IF/PUB-051 with enhanced solution details View summary
Change Proposal Implementation Elexon 7 Jan 2026 CP1627 HS45 Enabling amendment of Provisional Market Segment by LDSO prior to Supplier Registration View summary
Change Proposal Assessment Elexon 6 Jan 2026 CP1628 [HS27] Enabling Traditional Meters at CT Connections to be operated in the Advanced Market Segment View summary
Change Proposal Implemented EDF 6 Jan 2026 CP1626 Aligning character limits for Manufacture Make and Type and Asset Meter Make and Type View summary
Change Proposal Assessment Elexon 6 Jan 2026 CP1622 [HS26] Amendment of validation within SMRS for number of Meter Digits View summary
Modification Decision Drax 9 Dec 2025 P507 Reverting legacy Half Hourly scaling factors to pre-M10 values View summary Ofgem
Change Proposal Implemented Elexon 2 Dec 2025 CP1625 Pre Qualification Survey in BSCP537 View summary
Change Proposal Implemented Elexon 2 Dec 2025 CP1624 Placing Reliance in BSCP537 View summary
Change Proposal Implemented Elexon 2 Dec 2025 CP1623 Proposed Amendments to BSCP537 Following Finalisation of Enduring Qualification View summary
Change Proposal Implemented Elexon 2 Dec 2025 CP1621 Remove erroneous D300 reference from BSCP709 View summary
Change Proposal Implementation 2 Dec 2025 CP1620 New Supplier report showing Final Consumption Levy and BSUoS charge exemption volumes View summary
Change Proposal Implemented Elexon 27 Nov 2025 CP1619 Creation of Category 3 BSC Configurable Items for Accurate/Limited Status and Settlement Performance Weightings of Consumption Component Classes View summary
Modification Implemented BSC Panel 20 Nov 2025 P506 Unfreezing specific MDD entities to allow legacy Suppliers access to newly-Qualified LDSOs’ networks during MHHS Transition View summary Ofgem
Modification Implemented BSC Panel 20 Nov 2025 P505 Housekeeping Amendments to Section K Following P483’ View summary Panel (Self-Gov)
Issue Assessment Smartest Energy 14 Nov 2025 Issue 120 [HS35] GSP Group Correction Factor (GGCF) Scaling Weights Review View summary
Modification Implemented OVO Energy 5 Nov 2025 P503 Unfreezing MDD Temporarily to enable Load Diversity View summary Ofgem
Modification Assessment NESO 5 Nov 2025 P502 Supplier and Independent Aggregators Compensation for ABSVD Payments View summary Ofgem
Change Proposal Implemented Elexon 5 Nov 2025 CP1600 Amend BSCP301 to remove the Funds Accession paper form from being submitted via e-mail View summary
Change Proposal Assessment Elexon 4 Nov 2025 CP1618 [HS30] Improvements to the processes relating to P0310 and P0311 files View summary
Modification Implemented BSC Panel 21 Oct 2025 P504 Inclusion of Virtual Trading Parties as Performance Assurance Parties View summary Ofgem
Change Proposal Implemented Elexon 9 Oct 2025 CP1617 Correcting the timing of NHHDC deemed reads in BSCP708 View summary
Change Proposal Assessment Centrica 30 Sept 2025 CP1616 Specific Event Scenarios for Backdated MHHS Service Provider Appointments View summary
Modification Assessment NESO 26 Sept 2025 P501 Amending the BSC Change Process for changes affecting the NCER Terms and Conditions (Article 4(4)) View summary Ofgem
Change Proposal Implemented Elexon 25 Sept 2025 CP1615 Amend IDD to align to Helix solution View summary
Modification Implemented ADE: Demand 11 Sept 2025 P500 Enduring Governance and Funding Arrangements for the Market Facilitator View summary Ofgem
Change Proposal Implemented Elexon 2 Sept 2025 CP1614 Reporting Space Weather Events on Insights View summary
Modification Implementation NESO 28 Aug 2025 P499 BSC Changes for GC0166: Publishing Dynamic Parameters for Limited Duration Assets View summary Panel (Self-Gov)
Modification Implemented Energis Electricity Developments Limited 21 Aug 2025 P498 Ensuring correct data flows for licence exempt supplies View summary Ofgem
Modification Implementation NESO 7 Aug 2025 P497 Enabling publishing of REMIT data directly to Elexon and replacing NESO’s MODIS as a submission method View summary Ofgem
Modification Assessment Centrica 7 Aug 2025 P495 Allow Suppliers to retire MPIDs they do not intend to qualify prior to MHHS Milestone M14 View summary Ofgem
Change Proposal Implemented Elexon 5 Aug 2025 CP1613 Transfer of ownership of the ‘Standard Settlement Configuration’ and ‘Time Pattern Regime’ Data Items in the Retail Energy Code’s EMAR Data Specification from BSCCo to RECCo View summary
Change Proposal Implementation EON 5 Aug 2025 CP1612 Extend Customer Direct Contract update requirement from 1130 days to 1827 days in BSCP706’ View summary
Change Proposal Implemented Elexon 5 Aug 2025 CP1611 Updating the BSCP 700 Series to align with the MHHS design and requirements View summary
Modification Implemented DIP Manager 4 Aug 2025 P496 Defining DIP Manager Data and its access and use View summary Ofgem
Change Proposal Implemented Elexon 28 Jul 2025 CP1610 BSCP128 Updates to Align with ISD System Capabilities View summary
Modification Assessment Philip Russell - Russell Energy Consulting Ltd. 10 Jul 2025 P494 Establishing a Smart Data Repository (SDR) View summary Ofgem
Modification Implemented Ofgem 4 Jul 2025 P492 Introduce a time limited expedited change process to support the delivery of the electricity Settlement Reform Significant Code Review (SCR) View summary Ofgem
Modification Assessment Scottish Power 3 Jul 2025 P493 Enhancing the TLF transparency and forecasting View summary Ofgem
Change Proposal Implemented Elexon 1 Jul 2025 CP1609 New BSCP128 Appendix 11 for the Seasonal Time of Day template View summary
Modification Implemented Centrica 20 Jun 2025 P491 Amendment to the RTS Funding Mechanism Following the Announcement of the Phase-Out Process from DESNZ View summary Ofgem
Modification Implemented Panel 12 Jun 2025 P490 SVAA Service Description Change View summary Panel (Self-Gov)
Modification Implemented Ofgem 4 Jun 2025 P489 Update approved P478 for alignment with the latest MHHS Design View summary Ofgem
Issue Closed OVO Energy 4 Jun 2025 Issue 118 ADS Reads and Meter Configuration for Domestic CT metered customers View summary
Change Proposal Implemented Elexon 3 Jun 2025 CP1608 Amend BSCP65 for BSC Party Name to have a maximum of 160 characters View summary
Change Proposal Implementation Elexon 29 May 2025 CP1607 Implementation of Data Refresh Message, IF-051 CR044 / OHCR003 View summary
Change Proposal Implementation Elexon 29 May 2025 CP1606 Enabling mismatches in data between CSS and MPRS to be corrected [HS6] View summary
Modification Implemented Panel 8 May 2025 P488 Aligning the BM Unit Rules for EII Assets in the BSC with policy and current practices View summary Ofgem
Modification Decision Panel 8 May 2025 P487 Incentive of BSC Parties to meet the M15 MHHS Milestone View summary Ofgem
Change Proposal Implemented Elexon 6 May 2025 CP1605 Category 2 and Category B Non-Compliance Process Improvements in BSCP27 View summary
Issue Closed Elexon 28 Apr 2025 Issue 115 Barriers to Distributed Energy Resource Registration in the Balancing Mechanism View summary
Modification Implemented BSC Panel 10 Apr 2025 P486 Aligning BSC Terminology with the Terminology Introduced by P478 View summary Ofgem
Modification Implemented Scottish Power 19 Mar 2025 P485 Freeze 25/26 TLF values at 24/25 values View summary Ofgem
Issue Assessment Elexon - MDA 14 Mar 2025 Issue 117 Incentivising Correction of Settlement Post-Theft View summary
Change Proposal Implemented Elexon 4 Mar 2025 CP1604 Clarification of Obligations for Detection, Investigation and Resolution of CVA Metering Error View summary
Change Proposal Implemented Elexon 4 Mar 2025 CP1603 Update the SVA Data Catalogue to reference new and amended SVA interfaces introduced by MHHS View summary
Issue Assessment Siemens Energy 19 Feb 2025 Issue 116 Consideration of Low Power Instrument Transformers (LPITs) as part of Metering Systems View summary
Modification Implemented LCCC 13 Feb 2025 P484 Amending BSC Metering Obligations for CfD Assets View summary Panel (Self-Gov)
Change Proposal Implemented Flexitricity 30 Jan 2025 CP1602 Enabling AMMOAs to be appointed as MOA for both variants of Asset Metering Type 4 View summary
Standard Change Implementation Elexon 13 Jan 2025 SC0001 Removal of Footnote 3 in BSCP38: 'Authorisations' View summary
Change Proposal Implemented Elexon - Assurance 7 Jan 2025 CP1601 Update BSCP38 to include ZD Authorization level View summary
Modification Implemented Enel X UK Ltd 6 Jan 2025 P415 Facilitating access to wholesale markets for flexibility dispatched by Virtual Lead Parties View summary Ofgem
Modification Implemented Axle Energy 7 Nov 2024 P483 Enabling Asset Metering for Non-Half Hourly Boundary Metering Systems View summary Ofgem
Modification Implemented BSC Panel 10 Oct 2024 P482 Allow Elexon to more flexibly split BSC Agent services and to put in place appropriate contracts for the delivery of MHHS View summary Ofgem
Modification Implemented ADE 12 Sept 2024 P481 Market Facilitator Vires Mod View summary Ofgem
Modification Assessment Statkraft 12 Sept 2024 P479 [BSC Change] Amendments to the Credit Cover calculations View summary Ofgem
Modification Implemented NGESO 5 Sept 2024 P480 Publication of regional demand forecast data to fulfil ESRS Reporting requirements View summary Panel (Self-Gov)
Modification Implemented Ofgem 4 Sept 2024 P478 Implementation of MHHS Arrangements View summary Ofgem
Modification Implemented BSC Panel 8 Aug 2024 P477 Data Protection Provisions for Market-wide Half Hourly Settlement View summary Ofgem
Change Proposal Implemented Elexon 6 Aug 2024 CP1599 Remove requirement to specify HHDA in Non-Final Demand Declarations View summary
Modification Implemented BSC Panel 11 Jul 2024 P476 Exemption from MHHS Requirements for Smart Market Segment Supplier Qualification View summary Ofgem
Change Proposal Implemented Elexon 2 Jul 2024 CP1598 Amending the EMDS to add missing Scenario Variants for P375 View summary
Change Proposal Implemented Elexon 2 Jul 2024 CP1597 BSCP513 Text Change - Bulk Change of Agent View summary
Issue Closed Elexon 27 Jun 2024 Issue 114 Issues relating to Settlement of ABSVD for ancillary services delivered through independent aggregators View summary
Modification Implemented HD143OCK Ltd 6 Jun 2024 P475 Allow all storage sites to fix P/C flags View summary Ofgem
Modification Implemented Ofgem 6 Jun 2024 P474 Ongoing governance, funding and operation of the Data Integration Platform (DIP) View summary Ofgem
Modification Implemented BSC Panel 9 May 2024 P473 Correcting inconsistencies in the P415 Legal Text View summary Ofgem
Change Proposal Implemented Elexon 7 May 2024 CP1596 Define the change process in BSCP40 for changes to the Retail Energy Code's Energy Market Data Specification. View summary
Issue Closed Elexon 26 Apr 2024 Issue 113 Introduction of an RTS user charge View summary
Modification Implemented BSC Panel 11 Apr 2024 P472 Amendment to provisions for Parties to bring claims against BSC Agents in BSC Section E View summary Ofgem
Modification Rejected BSC Panel 11 Apr 2024 P471 Amendment to BSC Section E to allow more flexibility in procurement of BSC Agents View summary Ofgem
Change Proposal Withdrawn ELEXON 2 Apr 2024 CP1595 Correcting the D0148 flow in BSCP520 - CP1590 fix View summary
Change Proposal Implemented ELEXON 2 Apr 2024 CP1594 Creating an Approval Process for Managing New and Legacy Communication Types in Metering Systems View summary
Modification Withdrawn VPI Immingham LLP 7 Mar 2024 P470 Protecting the Imbalance Price from IOLC related distortions View summary Ofgem
Issue Closed Elexon 4 Mar 2024 Issue 112 Clarifying Half Hourly Data Collector obligations within BSCP502 regarding the fault investigation process View summary
Modification Implemented ECC 29 Feb 2024 P469 Credit Default Refusal and Rejection Period View summary Ofgem
Issue Closed Elexon 26 Feb 2024 Issue 111 SMRA Liquidated Damages in MHHS Arrangements
Modification Implemented LCCC 8 Feb 2024 P468 Enabling Elexon to support the (currently in draft) Electricity Support Payments and Levy Regulations 2024 View summary Ofgem
Change Proposal Implemented NGESO 6 Feb 2024 CP1593 Creation of a new Interconnector Fuel Type Category for the Greenlink Interconnector View summary
Change Proposal Implemented Elexon 6 Feb 2024 CP1592 Upgrade of NHHDA and EAC/AA systems from Oracle 12c to version 19.21 View summary
Modification Implemented NGESO 1 Feb 2024 P467 Enduring Solution in an event of a Gas Deficit Emergency (GDE) View summary Ofgem
Modification Implemented BSC Panel 11 Jan 2024 P466 BSC Section N Modernisation View summary Ofgem
Issue Assessment Elexon 11 Jan 2024 Issue 110 Modernising ECVN / MVRN submission and acknowledgement processes View summary
Change Proposal Withdrawn Peter Waymont (UK Power Networks) 5 Dec 2023 CP1591 New Site Visit Check Code Valid Set value View summary
Modification Implemented BSC Panel 9 Nov 2023 P465 Correction to P415 legal text to amend Credit Cover requirements for Virtual Trading Parties View summary Panel (Self-Gov)
Modification Implemented ELEXON 9 Nov 2023 P464 Housekeeping and updating BSC references to “Consumer Scotland”, “Generation Curtailment Validation Committee” and “GCVC” View summary Panel (Self-Gov)
Modification Implemented BSC Panel 9 Nov 2023 P463 Standard BSC Changes View summary Ofgem
Change Proposal Implemented Npower 7 Nov 2023 CP1590 Enabling use of DTN agent appointments process for P434 View summary
Change Proposal Withdrawn ELEXON 7 Nov 2023 CP1589 Change the number of characters used to specify Market Participant Role Codes in the Market Domain Data’ View summary
Change Proposal Implemented ELEXON 7 Nov 2023 CP1588 Mandating Calibration checks for Main and Check Meters View summary
Change Proposal Implemented 7 Nov 2023 CP1587 Obsolete Metering Equipment View summary
Change Proposal Implemented ELEXON 7 Nov 2023 CP1586 Defining the requirements for minimum burden and Current Transformer (CT) ratios View summary
Modification Assessment ESO 27 Oct 2023 P462 The removal of subsidies from Bid Prices in the Balancing Mechanism View summary Ofgem
Modification Rejected EnDCo 5 Oct 2023 P461 Accurate Reporting of Customers Delivered Volumes to Suppliers View summary Ofgem
Issue Closed Consumer 8 Sept 2023 Issue 109 Treatment of domestic solar self-consumption within Settlement
Modification Withdrawn Good Energy 3 Sept 2023 P459 Allowing different Supplier Agents to be appointed to Import and Export MSIDs View summary Ofgem
Modification Implemented BSC Panel 10 Aug 2023 P460 Amend the responsibility to propose and consult on a MHHS Migration Plan View summary Ofgem
Change Proposal Rejected SSE Networks 1 Aug 2023 CP1585 Submission of D0275/D0036 to DNOs View summary
Change Proposal Implemented ELEXON 1 Aug 2023 CP1584 Allow non-BSC Parties to raise Change Proposals, introduce a formal CP withdrawal process and remove the BCA/PACA concept from BSCP40 View summary
Change Proposal Implemented ELEXON 1 Aug 2023 CP1583 Rationalising publication of European Transparency Regulation (ETR) data on Elexon Systems View summary
Issue Closed ELEXON 20 Jul 2023 Issue 108 Further Extension of RTS Cost Recovery Arrangements Under the BSC
Modification Implemented BSC Panel 13 Jul 2023 P458 Introducing Data Controller and Processor Obligations in the BSC for MHHS Testing View summary Ofgem
Modification Implemented BSC Panel 13 Jul 2023 P457 Replace the Electricity Arbitration Association with the London Court of International Arbitration View summary Ofgem
Change Proposal Implemented ELEXON 27 Jun 2023 CP1582 Update BSCP520 on Change of Measurement Class to
ensure UMSO send a D0388 with a zero charge code View summary
Modification Implemented BSC Panel 8 Jun 2023 P456 Enable Elexon to procure ancillary Technology Services for us by BSC Agents View summary Panel (Self-Gov)
Modification Implemented Emergent Energy 8 Jun 2023 P455 On Site Aggregation as a method to facilitate Third Party Access View summary Ofgem
Change Proposal Implemented ELEXON 6 Jun 2023 CP1581 Recommendation to update BSCP18 following Issue 105 View summary
Change Proposal Implemented 10 May 2023 CP1580 Making the Code Subsidiary Documents (CSDs) gender neutral and Housekeeping View summary
Issue Closed ELEXON 5 May 2023 Issue 107 Review of BSC Section N ‘Clearing, Invoicing & Payment’
Change Proposal Implemented ELEXON 2 May 2023 CP1579 Allowing HHDCs to undergo protocol approval before completing Qualification View summary
Change Proposal Implemented ELEXON 2 May 2023 CP1578 Enabling Embedded LDSOs to calculate and submit Site Specific LLFs as required View summary
Change Proposal Implemented EDF Energy 2 May 2023 CP1577 To clarify the sending of a D0151 is required for all change of supplier NHH loss processes View summary
Modification Implemented BSC Panel 13 Apr 2023 P454 Removal of BSC obligations to provide BMRS Data via TIBCO and the High Grade Service View summary Ofgem
Modification Implemented UK Power Networks 6 Apr 2023 P453 Amending the Metering Dispensation process, updating AMP/DMP in the CoPs and clarifying the relevant CoP View summary Panel (Self-Gov)
Change Proposal Implemented National Grid 4 Apr 2023 CP1576 Creation of a new Interconnector Fuel Type Category for the Viking Link Interconnector View summary
Change Proposal Implemented ELEXON 4 Apr 2023 CP1575 Permitting the use of busbar voltage transformers within metering Code of Practice 1 and 2 View summary
Change Proposal Implemented ELEXON 4 Apr 2023 CP1574 Improving the use of the D0215 data flow in the relevant Industry processes View summary
Modification Implemented NGESO 24 Mar 2023 P452 Replacement of the Energy Bill Relief Scheme for non-domestic customers with the Energy Bill Discount Scheme View summary Ofgem
Modification Implemented National Grid ESO 1 Mar 2023 P451 Updating BSC Black Start provisions and compensation arrangements to align with NGESO’s new approach to System Restoration View summary Ofgem
Issue Closed ELEXON 13 Jan 2023 Issue 106 Review of BSC Credit Cover Arrangements
Modification Implemented BSC Panel 12 Jan 2023 P450 Housekeeping and making the BSC gender neutral View summary Ofgem
Issue Closed ELEXON 22 Dec 2022 Issue 105 Further considerations following implementation of BSC Modification P448
Change Proposal Implemented ELEXON 1 Nov 2022 CP1573 Amendments to the IDD Spreadsheet, SVA DC Volume 2 and REC EMAR Data Specification for P376 View summary
Change Proposal Implemented 1 Nov 2022 CP1572 Specifying the requirements to provide SLDs for HV and EHV sites View summary
Change Proposal Implemented ELEXON 1 Nov 2022 CP1571 Clarifying the requirements for the number of measuring elements in the relevant CoPs View summary
Modification Implemented NGESO 31 Oct 2022 P449 Energy Bill Relief Scheme for non-domestic customers View summary Ofgem
Issue Closed ELEXON 26 Oct 2022 Issue 104 Extending RTS Cost Recovery Arrangements Under the BSC
Modification Implemented SSE 28 Sept 2022 P448 Mitigating Gas Supply Emergency Risks View summary Ofgem
Modification Implemented NGESO 28 Sept 2022 P447 Avoiding impact of Winter Contingency actions on cash-out prices View summary Ofgem
Modification Implemented NGESO 13 Sept 2022 P446 Domestic Energy Price Guarantee Scheme View summary Ofgem
Change Proposal Implemented ELEXON 6 Sept 2022 CP1570 Housekeeping amendments to BSCP65 and BSCP70 to include reference to ‘Asset Metering Virtual Lead Party’ View summary
Change Proposal Implemented ELEXON 6 Sept 2022 CP1569 Amendments to the IDD documentation to align with SAA migration View summary
Change Proposal Implemented ELEXON 6 Sept 2022 CP1568 Inclusion of new LDSO-mastered SMRS data items in the SVAData Catalogue, the REC EMAR Data Specification and BSCP604 View summary
Modification Implemented Flexitricity 1 Sept 2022 P444 Compensation for Suppliers and Virtual Lead Parties for Virtual Lead Party actions in the Balancing Mechanism View summary Ofgem
Issue Assessment Western Power Distribution 24 Aug 2022 Issue 103 Meter Registrants and Settlement Risk - A New Way View summary
Modification Rejected Saltend Cogeneration Company Ltd 17 Aug 2022 P443 To Cap NGESO Interconnector Trades at the Value of Lost Load (VoLL) View summary Ofgem
Issue Closed ELEXON 17 Aug 2022 Issue 102 BSC Change Review
Change Proposal Implemented ELEXON 14 Jul 2022 CP1567 Creation of a new BSC Procedure (BSCP) for Assurance Information Requests (AIRs) View summary
Issue Closed ELEXON 13 Jul 2022 Issue 101 DIP Ongoing Governance, Funding and Operation
Modification Implemented UC Energy Ltd 7 Jul 2022 P442 Reporting to EMRS of chargeable volumes for SVA Metering Systems that record both exempt and licensed supply View summary Ofgem
Modification Decision Green Energy 7 Jul 2022 P441 Creation of Complex Site Classes View summary Ofgem
Change Proposal Implemented ELEXON 6 Jul 2022 CP1565 Updating BSCP520 to address operational issues in the Central Management System View summary
Change Proposal Implemented ELEXON 5 Jul 2022 CP1566 Introducing the CVA Commissioning End-to-End Check (CEEC) View summary
Modification Implemented NGESO 10 May 2022 P440 Enabling Elexon to administer the Capacity Market Advisory Group View summary Ofgem
Change Proposal Implemented ELEXON 19 Apr 2022 CP1564 Amendments to the IDD spreadsheets to correct sub-flows 3 & 4 of the SAA-I014 Settlement Reports View summary
Modification Implemented Ofgem 6 Apr 2022 P439 Enabling BSCCo to undertake development of the EDA-based Data Integration Platform View summary Ofgem
Change Proposal Implemented Northern Power Grid 5 Apr 2022 CP1563 Altering the Trigger Point for CT Commissioning View summary
Issue Closed National Grid ESO 5 Apr 2022 Issue 100 Assessing BSC Black Start processes to support NGESO’s Distributed ReStart project
Modification Implemented NGESO 29 Mar 2022 P438 Amending the BSC to BSC to address sanction orders View summary Ofgem
Modification Implemented BSCCo (Elexon) 10 Mar 2022 P437 Allowing non-BSC Parties to request Metering Dispensations View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 3 Mar 2022 CP1560 Demand Control Event (DCE) Settlement Adjustment Process clarifications View summary
Issue Closed UK Power Networks 2 Mar 2022 Issue 099 Review the use of the D0215 flow and associated processes
Change Proposal Implemented ELEXON 1 Mar 2022 CP1562 Amendments to the approved Interface Definition Document (IDD) changes for P375 View summary
Change Proposal Implemented ELEXON 1 Mar 2022 CP1561 Updating SVA DC Volume 1 and 2 for CP1546 View summary
Change Proposal Implemented ELEXON 22 Feb 2022 CP1559 Complex Sites Process Improvements View summary
Change Proposal Implemented ELEXON 16 Feb 2022 CP1558 New Registration data items and processes to support the transition to MHHS View summary
Modification Implemented Low Carbon Contracts Company (LCCC) 10 Feb 2022 P435 Enabling EMRS to undertake preparatory work for potential future settlement services to LCCC View summary Ofgem
Modification Implemented Npower Commercial Gas Limited 3 Feb 2022 P434 Mandate to Half Hourly Settle the Non-Half Hourly Unmetered Supplies Metering Systems View summary Ofgem
Modification Implemented Ofgem 2 Feb 2022 P436 Consequential BSC changes for Switching SCR (REC 3.0) View summary Ofgem
Modification Implemented BSC Panel 9 Dec 2021 P433 Updating the P375 legal text to align with the post-P420 BSC Baseline View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 7 Dec 2021 CP1557 Housekeeping Change to CP1532 Solution View summary
Change Proposal Implemented ELEXON 7 Dec 2021 CP1556 Adding P-flows to the BSCP70 ‘CVA Qualification Testing for Parties and Party Agents’ and Communication Requirements Document. View summary
Modification Implemented Npower Commercial Gas Limited 2 Dec 2021 P432 Half Hourly Settlement for CT Advanced Metering Systems View summary Ofgem
Modification Implemented NGESO 24 Nov 2021 P431 Post Brexit Agreement Updates View summary Panel (Self-Gov)
Modification Withdrawn Ecotricity 19 Nov 2021 P430 Allow Suppliers to use metering behind the site Boundary Point View summary Ofgem
Modification Implemented BSC Panel 11 Nov 2021 P429 Switching off Participant-Reported PARMS Serials View summary Ofgem
Modification Implemented BSC Panel 11 Nov 2021 P428 Correction to P376 Legal Text View summary Panel (Self-Gov)
Change Proposal Rejected Western Power Distribution 4 Nov 2021 CP1555 Provision of consumption data to Distributors for Measurement Classes G and F View summary
Change Proposal Implemented Ryan Parker (WPD) 3 Nov 2021 CP1552 Reflecting BSCP501 timeframes in BSCP520 processes View summary
Change Proposal Implemented ELEXON 2 Nov 2021 CP1554 IEC standards in the CoPs are out of date and cumbersome to change. View summary
Change Proposal Implemented ELEXON 2 Nov 2021 CP1553 Tightening the minimum accuracy classes for Meters (CoP5) and CTs (CoPs 3,5 and 10) View summary
Modification Implemented BSC Panel 14 Oct 2021 P427 Publication of Performance Assurance Parties’ impact on Settlement Risk View summary Ofgem
Issue Closed Energy UK 13 Oct 2021 Issue 098 Review of the current practice of setting Dynamic Parameters within the Balancing Mechanism
Modification Withdrawn Drax Energy Solutions Limited 11 Oct 2021 P426 Combining related BSC Parties’ Energy Indebtedness positions for the Credit Cover Percentage calculation View summary Ofgem
Modification Implemented E.ON 6 Oct 2021 P425 Amendment to the definition of Shared SVA Meter Arrangement View summary Ofgem
Change Proposal Implemented BSCCo 5 Oct 2021 CP1551 Updates to BCP601 to reflect updates to the Measuring Instruments Regulations View summary
Change Proposal Implemented ELEXON 5 Oct 2021 CP1550 Monitoring of Voltage failure alarms View summary
Change Proposal Implemented ELEXON 5 Oct 2021 CP1549 Amendment of BSCP516 to clarify the criteria for Non-Domestic SVA Metering Systems to be allocated to Profile Classes 3 or 4 View summary
Modification Implemented BSC Panel 16 Sept 2021 P424 Re-insert correct definition of Settlement Error View summary Ofgem
Change Proposal Implemented ELEXON 7 Sept 2021 CP1548 Remove the constraint, in NETA IDD Part 1 Document, requiring BMRA to publish data files in the specific CSV format View summary
Issue Closed ELEXON 20 Aug 2021 Issue 097 The Impact of CT Meter stock shortage on the BSC as a result of the global shortage of semiconductors following
COVID-19 pandemic
Modification Implemented Ofgem 16 Aug 2021 P423 Market-wide Half Hourly Settlement (MHHS) Implementation and Governance Arrangements View summary Ofgem
Issue Closed UC Energy Ltd 6 Aug 2021 Issue 096 Assessing the reporting to EMRS of chargeable volumes for SVA Metering Systems that record both exempt
and licensed supply
Modification Implemented BSC Panel 8 Jul 2021 P422 Reflecting NCER Rules in the BSC View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 8 Jul 2021 CP1547 Clarification on Site Specific LLF Calculation Process for Embedded LDSOs View summary
Change Proposal Implemented ELEXON 8 Jul 2021 CP1546 UMS Summary Inventory and Control File Data Flow View summary
Modification Implemented NGESO 1 Jul 2021 P421 Align the BSC with Grid Code Modification GC0144 for TERRE Market Suspension View summary Ofgem
Issue Closed ELEXON 17 Jun 2021 Issue 095 Assessing the continued use of TIBCO service as a source of data for market participants
Change Proposal Implemented ELEXON 2 Jun 2021 CP1545 Introducing Technical Assurance of Metering (TAM) Central Volume Allocation (CVA) Specific Sample audits View summary
Change Proposal Implemented ELEXON 2 Jun 2021 CP1544 BSCCo Approved EFR Representative sign-off required for any EFR plan following escalation View summary
Modification Implemented Ofgem 10 May 2021 P420 Retail Code Consolidation Significant Code Review View summary Ofgem
Modification Implemented NGESO 6 May 2021 P419 Enhanced Reporting of demand data to NETSO to facilitate BSUoS Reform View summary Ofgem
Change Proposal Rejected Centrica 6 Apr 2021 CP1543 Use of DTC data flow D0051 in the Half Hourly Sector to inform Suppliers that the Data Collector affirms the Data Retrieval methodology View summary
Issue Closed National Grid ESO 6 Apr 2021 Issue 094 Assessing barriers to entry to the Balancing Mechanism for sub 1MW providers and decimal bids
Change Proposal Rejected ELEXON 23 Feb 2021 CP1542 Transfer the obligation to visit de-energised sites annually from Data Collector to Supplier View summary
Change Proposal Implemented Centrica 22 Feb 2021 CP1541 Use of DTC data flow D0004 in Half Hourly Sector to inform Suppliers that a manual download to obtain data was not successful View summary
Change Proposal Implemented ELEXON 18 Feb 2021 CP1540 Removal or Strengthening of Footnote 22 in BSCP537 View summary
Issue Closed Association of Meter Operators 15 Jan 2021 Issue 093 Review of the BSC Metering Codes of Practice
Issue Closed National Grid 11 Dec 2020 Issue 092 Review pricing of reserve in scarcity situations
Modification Implemented BSC Panel 10 Dec 2020 P418 Amendments to the P383 legal text for Additional BM Units View summary Panel (Self-Gov)
Modification Rejected ELEXON 10 Dec 2020 P417 Move the Letter of Credit templates and Approved Insurance Product requirements to the BSC Website for more efficient maintenance and simplification View summary Panel (Self-Gov)
Change Proposal Implemented LCCC 24 Nov 2020 CP1539 Inclusion of LCCC as an Affected party for Metering Dispensations View summary
Change Proposal Implemented ELEXON 19 Nov 2020 CP1538 Amend the Interface Definition and Design (IDD) Part 1 document to ensure that TERRE Tibco messages are specified correctly. View summary
Modification Rejected British Gas 5 Nov 2020 P416 To introduce a route of appeal for the BSC Annual Budget View summary Ofgem
Issue Closed EDF 5 Nov 2020 Issue 091 Registration and Settlement of Smart Export Guarantee (SEG) sites
Modification Implemented RWE Supply & Trading GmbH 29 Sept 2020 P414 Allowing a Party to Withdraw from the BSC and transfer outstanding liabilities to another Party View summary Ofgem
Modification Implemented Scottish Power 7 Sept 2020 P413 Enable Elexon to be the Programme Manager for the implementation of Market-wide Half Hourly Settlement (MHHS) View summary Ofgem
Modification Assessment National Grid ESO 3 Sept 2020 P412 Ensuring non-BM Balancing Services providers pay for non-delivery imbalances View summary Ofgem
Change Proposal Implemented ELEXON 21 Aug 2020 CP1537 PAF Review: Amend BSCP535-Technical Assurance timescales and process for agreeing Technical Assurance of Performance Assurance Parties (TAPAP) Findings Reports View summary
Change Proposal Implemented ELEXON 27 Jul 2020 CP1536 Use of DTC data flow D0379 for submission of unmetered Half Hourly data View summary
Change Proposal Implemented NGESO 13 Jul 2020 CP1535 Interconnector Fuel Type Category update to BMRS View summary
Modification Implemented BSC Panel 9 Jul 2020 P411 Including new LDSOs in Qualification to mitigate potential risks to Settlement View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 8 Jul 2020 CP1534 Review Change of Supplier (CoS) - No Meter Process View summary
Change Proposal Implemented ELEXON 8 Jul 2020 CP1533 Update Non Half Hourly Data Collector (NHHDC) Change of Supplier Process View summary
Change Proposal Implemented ELEXON 8 Jul 2020 CP1532 Review Appointment of Agent Timelines View summary
Modification Withdrawn NGESO 3 Jul 2020 P410 Changing imbalance price calculations to comply with the Imbalance Settlement Harmonisation regulations View summary Ofgem
Change Proposal Implemented National Grid ESO 30 Jun 2020 CP1531 Additionally provide the TUoS Report to National Grid ESO at the II Settlement Run View summary
Change Proposal Implemented ELEXON 30 Jun 2020 CP1530 Introduction of a formalised process for the validation of measurement transformer ratios by ELEXON View summary
Modification Implemented NGESO 12 May 2020 P409 Aligning the BMRS Reporting Requirements with the Clean Energy Package View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 6 May 2020 CP1529 Review waiting time to chase missing Change of Supplier (D0086) readings View summary
Modification Implemented NGESO 5 May 2020 P408 Simplifying the Output Usable Data Process as a consequence of GC0130 View summary Panel (Self-Gov)
Issue Closed Infinis Energy 5 May 2020 Issue 090 Could Elexon (under BSCCo) administrate a tendered Market Maker (tMM)?
Modification Withdrawn NGESO 4 May 2020 P407 Project MARI View summary Ofgem
Modification Implemented BSC Panel 9 Apr 2020 P406 Temporary disapplication of Supplier Charge Serials SP08 and SP04 due to COVID-19 View summary Ofgem
Modification Implemented BSC Panel 9 Apr 2020 P405 Allow notices via electronic means where currently prohibited View summary Panel (Self-Gov)
Issue Closed ELEXON 23 Mar 2020 Issue 089 Ensuring Demand Control Event (DCE) procedures remain fit for purpose
Issue Closed ELEXON 18 Mar 2020 Issue 088 Clarification of BSC Arrangements relating to Complex Sites
Modification Implemented BSC Panel 12 Mar 2020 P404 Removing the Self-Assessment Document from the BSCP and instead making it a Category 3 configurable item View summary Panel (Self-Gov)
Modification Implemented National Grid ESO 10 Mar 2020 P403 BSC Arrangements in the event that the TERRE Market is suspended by National Grid ESO View summary Panel (Self-Gov)
Modification Implemented National Grid ESO 5 Mar 2020 P402 TCR SCR - implementing Ofgem's policy decision View summary Ofgem
Issue Closed Siemens Transmission and Distribution Ltd. 3 Mar 2020 Issue 087 Offshore Wind Park Bus Bar VT Metering
Modification Implemented BSC Panel 13 Feb 2020 P401 Panel Gov: Clarification of Panel Alternates Governance Arrangements View summary Panel (Self-Gov)
Modification Implemented BSC Panel 13 Feb 2020 P400 Panel Gov: Tele/Videoconferencing for Modifications business View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 28 Jan 2020 CP1528 Clarifying responsibility for the Commissioning of measurement transformers that will be later adopted View summary
Change Proposal Implemented ELEXON 27 Jan 2020 CP1527 Increase the minimum data storage capacity for Settlement Outstations and Mandate specific selectable DPs for CoPs 3, 5, and 10 View summary
Modification Implemented Sutton Bridge 24 Dec 2019 P399 Making the identity of Balancing Service providers visible in the Balancing Services Adjustment Data View summary Ofgem
Change Proposal Rejected ELEXON 13 Dec 2019 CP1526 Introduction of Service Level Agreements for rectifying Meter faults. View summary
Change Proposal Rejected ELEXON 13 Dec 2019 CP1525 Improving the involvement of the LDSO in the fault resolution process View summary
Change Proposal Rejected ELEXON 13 Dec 2019 CP1524 Improving the communication methods in the fault rectification process View summary
Modification Implemented ELEXON 12 Dec 2019 P398 Increasing Access to BSC data View summary Ofgem
Modification Implemented BSC Panel 12 Dec 2019 P397 Assessing the costs and benefits of adjusting Parties' Imbalances following a demand disconnection View summary Ofgem
Modification Implemented Nord Pool Spot AS 10 Dec 2019 P396 Revised treatment of BSC Charges for Lead Parties of Interconnector BM Units View summary Ofgem
Modification Implemented Centrica 7 Nov 2019 P395 Final Consumption Levies (FCLs) View summary Ofgem
Change Proposal Implemented WPD 6 Nov 2019 CP1523 BSCP 501 Amendments to clarify D0312 process View summary
Change Proposal Implemented ELEXON 31 Oct 2019 CP1522 Updates to BSCP520 to align with working practices and UMSUG recommendations View summary
Modification Implemented ELEXON 10 Oct 2019 P394 Removal of Unused BSC Provisions View summary Panel (Self-Gov)
Modification Implemented ELEXON 10 Oct 2019 P393 Disapplication of SP01 Supplier Charges View summary Ofgem
Issue Closed ELEXON 9 Oct 2019 Issue 086 Review of processes potentially impacted by Ofgem’s Faster Switching Programme
Modification Implemented ELEXON 2 Oct 2019 P392 Aligning the BSC Change process with EBGL requirements View summary Ofgem
Modification Implemented ELEXON 12 Sept 2019 P391 Expansion of the scope of the Technical Assurance of Metering (TAM) technique to include desktop audits View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 27 Aug 2019 CP1521 BSCP70 Amendments for Interconnector Administrators and Interconnector Error Administrators View summary
Issue Closed TMA 27 Aug 2019 Issue 085 Removal of obligation to visit de-energised sites once every 12 months from BSCP504
Modification Implemented E.ON 12 Aug 2019 P390 Allowing extensions to ELEXON’s business and activities, subject to additional conditions View summary Ofgem
Change Proposal Implemented ELEXON 8 Aug 2019 CP1520 Clarification to Change of Ownership process in BSCP537 View summary
Modification Implemented Green Frog Power 1 Aug 2019 P389 Resolution of Capacity Market and Balancing Mechanism registration conflicts View summary Panel (Self-Gov)
Change Proposal Implemented UKPN 16 Jul 2019 CP1519 Treatment of Low Capacity Connections for Site Specific Line Loss Factor Calculations View summary
Issue Closed SSE Electricity Ltd 10 Jul 2019 Issue 084 Cost-recovery options for the ongoing provision of the Radio Teleswitching Arrangements
Modification Implemented NETSO 3 Jul 2019 P388 Aligning the P344 & P354 Solutions View summary Panel (Self-Gov)
Issue Closed Sembcorp 1 Jul 2019 Issue 083 Ensuring that the Buy Price Adjuster reflects all additional balancing costs incurred by NGESO
Issue Closed ELEXON 19 Jun 2019 Issue 082 Expand the BSC Panel’s ability to raise Modification Proposals
Issue Closed NETSO 12 Jun 2019 Issue 081 determine the benefits associated with Run-up/Run-down rates and Last Time to Cancel Synchronisation (LTCS) publication on BMRS
Change Proposal Implemented ELEXON 23 May 2019 CP1518 Housekeeping change to address errors in the Approved (Prop)d changes to BSCP514 for CP1515 View summary
Change Proposal Implemented ELEXON 17 May 2019 CP1517 Changes to BSC Configurable Items for the TERRE Final Implementation Date View summary
Modification Implemented BSC Panel 9 May 2019 P387 Allowing email communications for the BSC Panel Elections process View summary Panel (Self-Gov)
Modification Implemented National Grid 7 May 2019 P386 Corrections and clarifications to the P344 'Project TERRE' legal text' View summary Panel (Self-Gov)
Issue Closed AMO 16 Apr 2019 Issue 080 Increase in minimum data storage memory requirements within the Half Hourly Metering CoPs
Issue Closed Utilita 15 Apr 2019 Issue 079 Erroneous Consumption Volumes following a Change of Supplier Event
Modification Implemented British Gas 3 Apr 2019 P385 Reviewing BSC rules in regard to actions being taken by the BSC Panel in Events of Default relating to Payment Default and Credit Default View summary Panel (Self-Gov)
Issue Closed Opus Energy 29 Mar 2019 Issue 078 Measurement and monitoring of Settlement performance
Issue Closed ELEXON 29 Mar 2019 Issue 077 Reviewing the suitability of Specified Charges.
Change Proposal Implemented NETSO 7 Mar 2019 CP1516 New Interconnector Fuel Type Categories: ElecLink & IFA2 View summary
Modification Implemented NETSO 6 Mar 2019 P384 The publication of European Electricity Balancing Guideline (EB GL) balancing data by BMRS View summary Panel (Self-Gov)
Modification Implemented Engie 6 Mar 2019 P383 Enhanced reporting of demand data to the NETSO to facilitate CUSC Modifications CMP280 and CMP281 View summary Ofgem
Modification Rejected NETSO 4 Mar 2019 P382 Amendments to the BSC to reflect the United Kingdom’s withdrawal from the European Union without a deal View summary Panel (Self-Gov)
Modification Implemented BSC Panel 14 Feb 2019 P381 Panel Gov: Remove Quarterly Reports View summary Panel (Self-Gov)
Modification Implemented National Grid 6 Feb 2019 P380 Revision to Replace Reserve Bid Data submission deadline requirements View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 4 Jan 2019 CP1515 Amendments to BSCP514 for the Faster Switching Programme View summary
Modification Withdrawn GridBeyond 3 Jan 2019 P379 Enabling consumers to buy and sell electricity from/to multiple providers through Meter Splitting View summary Ofgem
Modification Rejected VPI Immingham LLP 20 Dec 2018 P378 Introduction of a CM Supplier Interim Charge View summary Ofgem
Change Proposal Implemented ELEXON 17 Dec 2018 CP1514 Number of register digits for smart Meters View summary
Modification Implemented BSC Panel 13 Dec 2018 P377 Amending Gate Closure references in Market Index Data View summary Ofgem
Modification Implemented Enel Trade S.P.A. 11 Dec 2018 P376 Utilising a baselining methodology as an alternative to Physical Notifications View summary Ofgem
Modification Implemented Flexitricity 10 Dec 2018 P375 Settlement of Secondary BM Units using metering behind the site Boundary Point View summary Ofgem
Issue Closed VPI Immingham S.P.A. 6 Dec 2018 Issue 076 Using the BSC to provide interim contingency planning for the CM
Issue Closed SSE/RWE 28 Nov 2018 Issue 075 Central Data Collection Agent (CDCA) to use Internet Protocol (IP) address based communications for Central Volume Allocation (CVA) Metering Systems.
Change Proposal Implemented ELEXON 12 Nov 2018 CP1513 Updates removing inconsistencies within and between BSCP601, CoP3 and CoP5. View summary
Modification Implemented SSE 5 Nov 2018 P374 Aligning the BSC with the EB GL change process and derogation approach View summary Ofgem
Change Proposal Implemented ELEXON 26 Oct 2018 CP1512 Improving the format of BSCP11 forms View summary
Issue Closed National Grid 25 Oct 2018 Issue 074 Increased utilisation of non-BM STOR
Change Proposal Implemented ELEXON 15 Oct 2018 CP1511 Clarification of BSCP40 definitions and processes View summary
Issue Closed SSE 12 Oct 2018 Issue 073 Review of fault management and resolution timescales
Change Proposal Implemented ELEXON 5 Oct 2018 CP1510 Allow the online management of registrations, Market Entry and Market Exit View summary
Modification Implemented National Grid 4 Oct 2018 P373 Reversing the changes relating to Approved Modification P297 View summary Ofgem
Modification Implemented BSC Panel 13 Sept 2018 P372 Simplifying BMRS changes View summary Panel (Self-Gov)
Modification Implemented UKPR 11 Sept 2018 P371 Inclusion of non-BM Fast Reserve actions into the Imbalance Price calculation View summary Ofgem
Issue Closed SSE 11 Sept 2018 Issue 072 Ensuring Electricity Network Connections assets installed by a Non-BSC Party are successfully Commissioned within BSC timescales
Change Proposal Implemented ELEXON 10 Sept 2018 CP1509 Amend BSCP503 to add new recipients of the D0355 and D0357 data flows View summary
Change Proposal Implemented ELEXON 9 Aug 2018 CP1508 Updating references to the British and International Standards within the relevant Code Subsidiary Documents View summary
Modification Implemented BSC Panel 12 Jul 2018 P370 P370 'Allow the Panel to designate non-BSC Parties to raise Modifications' View summary Ofgem
Modification Implemented National Grid 5 Jul 2018 P369 Legal separation of the Electricity System Operator (ESO) within the National Grid Group View summary Ofgem
Issue Closed ELEXON 15 Jun 2018 Issue 071 Introduction of a baselining methodology as an alternative to Physical Notifications
Issue Closed Flexitricity 15 Jun 2018 Issue 070 Settlement of Secondary BM Units using metering at the asset
Modification Implemented BSC Panel 14 Jun 2018 P368 Amendments to Section Z to facilitate more flexible change to the Risk Evaluation Methodology, Risk Evaluation Register and Risk Operating Plan View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 15 May 2018 CP1507 Updates to BSCP520 to align with working practices and UMSUG recommendations View summary
Modification Implemented BSC Panel 10 May 2018 P367 Removal of obsolete SBR and DSBR arrangements View summary Panel (Self-Gov)
Change Proposal Implemented National Grid 3 May 2018 CP1506 New Interconnector fuel type View summary
Modification Rejected Orsted 26 Apr 2018 P366 Change to Supplier Charge SP08a calculations to account for small scale non-Domestic Non Half Hourly hard-to-read Meters View summary Ofgem
Change Proposal Implemented GTC (ETCL & IPNL) 12 Mar 2018 CP1505 Allowing “off-site” Commissioning of current transformers preinstalled in cut outs or switchgear at manufacture for use in low voltage (LV) installations View summary
Change Proposal Implemented ELEXON 2 Mar 2018 CP1504 Amend BSCP201’s references to dual/single pricing following implementation of P305 View summary
Change Proposal Implemented National Grid 9 Feb 2018 CP1503 Changes to European Transparency Regulation data to align with latest ENTSO-e Manual of Procedures View summary
Modification Implemented Hudson Energy 19 Jan 2018 P365 Enabling ELEXON to tender for the Retail Energy Code (REC) View summary Ofgem
Change Proposal Implemented ELEXON 19 Jan 2018 CP1502 Removal of the requirement to submit sampling data for Profile Classes 5-8 following the implementation of P272 View summary
Change Proposal Implemented ELEXON 19 Jan 2018 CP1501 Correction to P302 footnote in BSCP504 View summary
Modification Implemented Green grog power 7 Dec 2017 P364 Clarifying requirements for registering and maintaining BM Units View summary Panel (Self-Gov)
Modification Amalgamated Green Frog power 7 Dec 2017 P363 Simplifying the registration of new configurations of BM Units’ View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 23 Nov 2017 CP1499 Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Suppliers on Meter Operation Code of Practice Agreement Accreditation for Meter Operator Agents View summary
Change Proposal Implemented ELEXON 23 Nov 2017 CP1498 Updates to BSCP537 Appendix 1 ‘Self-Assessment Document’ to incorporate an additional question for Meter Operator Agents on Meter Operation Code of Practice Agreement Accreditation View summary
Change Proposal Implemented ELEXON 22 Nov 2017 CP1500 Amend the BSCP537 Appendices to add a requirement for Suppliers and MOAs to demonstrate the ability to send and receive Smart Meter Configuration details View summary
Modification Implemented BSC Panel 9 Nov 2017 P362 Introducing BSC arrangements to facilitate an electricity market sandbox View summary Ofgem
Modification Expired Europe 31 Oct 2017 P361 Revised treatment of BSC Charges for Lead Parties of Interconnector BM Units View summary Ofgem
Change Proposal Implemented ELEXON 16 Oct 2017 CP1497 Introduction of data flows for Half Hourly Meter Operator Agents to pass on Commissioning information when there is a Change of Agent View summary
Change Proposal Implemented Elexon 16 Oct 2017 CP1496 Introduction of two data flows for the Commissioning process for Half Hourly (HH) Supplier Volume Allocation (SVA) Current Transformer (CT) operated Metering Systems View summary
Change Proposal Implemented ELEXON 2 Oct 2017 CP1495 Introduction of a Rejectedion response dataflow for a D0170 ‘Request for Meter System Related Details’ request from the Meter Operator Agent to the Licenced Distribution System Operator where a D0215 ‘Provision of Site Technical Details’ response is required. View summary
Change Proposal Implemented ELEXON 13 Sept 2017 CP1494 Introduce an Objection Window for Housekeeping CPs View summary
Change Proposal Implemented ELEXON 8 Sept 2017 CP1493 Add a form and associated process steps to BSCP15 for registering Non-Standard BM Unit configurations View summary
Modification Withdrawn National Grid 7 Sept 2017 P360 Making the BSC’s imbalance price compliant with the European Balancing Guideline View summary Ofgem
Modification Implemented SSE 6 Sept 2017 P359 Mechanised process for GC/DC declarations View summary Ofgem
Modification Implemented SSE 6 Sept 2017 P358 Roll over of BSC Seasonal GCDC View summary Ofgem
Modification Implemented SSE 6 Sept 2017 P357 Removal of GC DC Parameters Section K View summary Ofgem
Modification Implemented National Grid 3 Jul 2017 P356 Aligning the BSC with Grid Code Modification GC0099 'Establishing a common approach to interconnector scheduling consistent with the single intraday market coupling processes set out within Regulation (EU) 2015/1222 (CACM)' View summary Ofgem
Modification Withdrawn PeakGen 22 Jun 2017 P355 Introduction of a BM Lite Balancing Mechanism View summary Ofgem
Change Proposal Implemented ELEXON 21 Jun 2017 CP1492 Causes and treatment of large Line Loss Factors View summary
Change Proposal Implemented ELEXON 14 Jun 2017 CP1490 Changes to BSCP27 and TAA Service Descriptions to remove constraints to service improvement. View summary
Change Proposal Implemented ELEXON 7 Jun 2017 CP1488 Align the NETA IDD spreadsheets with the live implementation of the SAA-I014 flow View summary
Change Proposal Implemented ELEXON 17 May 2017 CP1487 Remove the exclusion of Change of Measurement Classes in BSCP533 Appendix B View summary
Issue Closed ELEXON 30 Mar 2017 Issue 069 Performance Assurance Framework Review
Issue Closed ELEXON 28 Mar 2017 Issue 068 Under-estimation of Demand capacity and credit cover Percentage
Change Proposal Implemented ELEXON 13 Mar 2017 CP1485 Validation of power transformer and cable/line loss adjustments View summary
Change Proposal Implemented ELEXON 10 Mar 2017 CP1486 Removing example Advice Notes, Backing Sheets and Confirmation Notices from BSCP301 View summary
Change Proposal Implemented ELEXON 8 Feb 2017 CP1484 DA686: Validation during Volume Allocation Runs View summary
Issue Closed SSE 19 Jan 2017 Issue 067 Appropriate Meter Timeswitch Code for Smart Meters
Issue Closed Ecotricity 19 Jan 2017 Issue 066 Responsibility for repairs of Dual Function Meters with different Suppliers for Import and Export
Change Proposal Implemented ELEXON 18 Jan 2017 CP1483 Changes to BSCP550 View summary
Issue Closed ELEXON 16 Jan 2017 Issue 065 LLF Value Threshold Limitations
Modification Implemented ENGIE 11 Jan 2017 P354 Use of ABSVD for non-BM Balancing Services at the metered (MPAN) level View summary Ofgem
Change Proposal Implemented ELEXON 14 Dec 2016 CP1481 Housekeeping Change to BSCP536 following approval of P339 View summary
Modification Implemented Panel 8 Dec 2016 P353 Fast Track Self-Governance Mod following P324 View summary Panel (Self-Gov)
Change Proposal Rejected National Grid 28 Nov 2016 CP1480 Creation of a new authorisation category for corrections to BOA related data View summary
Change Proposal Implemented ELEXON 23 Nov 2016 CP1479 Updates to the Defined Metering Points in Codes of Practice 1, 2, 3, 5 and 10 View summary
Change Proposal Implemented ELEXON 22 Nov 2016 CP1478 Automate the loading of the DF Matrix View summary
Change Proposal Implemented ELEXON 7 Nov 2016 CP1477 Updates to BSCP537 Appendix 1 as a result of P283 View summary
Change Proposal Implemented ELEXON 3 Nov 2016 CP1482 Upgrade of NHHDA and EAC/AA systems from Oracle 11g to version 12c View summary
Change Proposal Implemented ELEXON 27 Oct 2016 CP1476 Facilitation of Incremental LLFs View summary
Change Proposal Implemented E.ON 14 Oct 2016 CP1475 Remove obligation to re-date final NHH Meter readings on CoMC View summary
Change Proposal Implemented ELEXON 14 Oct 2016 CP1474 Updating the CoMC processes to facilitate the elective HH Settlement of SMETS Meters View summary
Change Proposal Implemented British Gas 5 Oct 2016 CP1473 Alteration to the LTV Entry Criteria View summary
Change Proposal Implemented NPower 14 Sept 2016 CP1472 Removal of SVA proving tests for Meters with a pulse multiplier of one View summary
Change Proposal Implemented ELEXON 18 Aug 2016 CP1471 Housekeeping - discrepancies in the requirements of the CRA URS View summary
Change Proposal Implemented ELEXON 12 Aug 2016 CP1470 Housekeeping Change to CoPs 1, 2, 3 and 5 following P266 View summary
Modification Implemented BSC Panel 11 Aug 2016 P352 Housekeeping changes to BSC Section M View summary Panel (Self-Gov)
Modification Implemented National Grid 29 Jul 2016 P351 Align the BSC with changes to the SCR requirements View summary Ofgem
Issue Closed ELEXON 21 Jul 2016 Issue 064 Defining default price when NIV equals zero and when there is no priced action left after NIV tagging
Change Proposal Implemented ELEXON 19 Jul 2016 CP1469 Changes to support the implementation of the SRAG’s recommendations View summary
Change Proposal Implemented ELEXON 6 Jul 2016 CP1468 Adoption of a standard template for raising Modifications View summary
Modification Implemented National Grid 4 Jul 2016 P350 Introduction of a seasonal Zonal Transmission Losses scheme View summary Ofgem
Modification Implemented Scottish Power 4 Jul 2016 P349 Facilitating Embedded Generation Triad Avoidance Standstill View summary Ofgem
Modification Implemented EDF 1 Jul 2016 P348 Provision of gross BM Unit data for TNUoS charging View summary Ofgem
Modification Implemented Npower 1 Jul 2016 P347 Reduction in R1 Read Threshold View summary Ofgem
Modification Implemented British Gas 23 Jun 2016 P346 Changes to Specific Charges for Elective HH Settlement View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 14 Jun 2016 CP1467 Inclusion of site ID data within the BSCP11/07 'TDC Trading Dispute Findings' form View summary
Change Proposal Implemented ELEXON 14 Jun 2016 CP1466 Removing SMETS compliant Meters from the scope of BSCP601 ‘Metering Protocol Approval and Compliance Testing’ View summary
Change Proposal Implemented ELEXON 13 Jun 2016 CP1465 Sending revised Meter Technical Details following a change of Meter Operator Agent View summary
Modification Implemented SSE plc 2 Jun 2016 P345 Reducing the CAP change notice period and improving its flexibility’ View summary Panel (Self-Gov)
Modification Implemented National Grid 1 Jun 2016 P344 Project TERRE implementation into GB market arrangements View summary Ofgem
Modification Implemented RWE Npower 26 May 2016 P343 Increase to the number of Supplier IDs that can be held by a Supplier View summary Panel (Self-Gov)
Modification Implemented EDF 25 May 2016 P342 Change to Gate Closure for Energy Contract Volume Notifications View summary Ofgem
Change Proposal Rejected ELEXON 17 May 2016 CP1464 Requiring HH consumption data to be processed to appropriate precision View summary
Modification Implemented BSC Panel 12 May 2016 P340 Removal of References and Requirements Relating to the LCPD’ View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 9 May 2016 CP1463 Process for ELEXON to calculate category 1 non-compliance materiality View summary
Change Proposal Implemented ELEXON 9 May 2016 CP1462 Allow the CDCA to break and remake Metering Equipment seals to access local interrogation port View summary
Change Proposal Implemented ELEXON 5 May 2016 CP1461 Amending BSCP128 to reflect a new simple SVA file format for LDSO LLF submissions’ View summary
Modification Implemented Ovo 4 May 2016 P339 Introduction of new Consumption Component Classes for Measurement Classes E-G View summary Panel (Self-Gov)
Modification Withdrawn EDF 3 May 2016 P341 MEL and other data earlier than Gate Closure View summary Ofgem
Modification Implemented BSC Panel 14 Apr 2016 P338 Consequential changes to P272 legal text View summary Panel (Self-Gov)
Change Proposal Rejected Engie 29 Mar 2016 CP1460 Timely inclusion of SBR Actions
into imbalance cashout View summary
Change Proposal Implemented ELEXON 29 Mar 2016 CP1459 Amendments to the process for performing a Post-Final Settlement Run View summary
Modification Implemented BSC Panel 10 Mar 2016 P337 Extension to the payment timescales for Quarter Date Advice Notes below the Advice Note Threshold Limit View summary Panel (Self-Gov)
Modification Implemented Drax Power Limited 29 Feb 2016 P336 Fuel types on the BMRS View summary Panel (Self-Gov)
Modification Implemented ENGIE 19 Feb 2016 P335 Inclusion of Non-BM STOR costs and volumes in the indicative cashout price View summary Ofgem
Change Proposal Implemented ELEXON 16 Feb 2016 CP1458 Introduction of timescales for the P283 Commissioning process for SVA CT operated Metering Systems View summary
Modification Withdrawn ENGIE 28 Jan 2016 P334 Inclusion of Non-BM STOR costs and volumes into the cashout price in time for publication after the end of the Settlement Period View summary Ofgem
Modification Implemented ENGIE 28 Jan 2016 P333 Inclusion of DSBR volumes into the cashout price in time for publication after the end of the Settlement Period View summary Ofgem
Modification Rejected Smartest Energy 28 Jan 2016 P332 Revisions to the Supplier Hub Principle View summary Ofgem
Change Proposal Implemented ELEXON 22 Jan 2016 CP1457 Changes to BSCP520 to support the introduction of Generic LED Charge Codes View summary
Change Proposal Implemented ELEXON 15 Jan 2016 CP1456 Clarification to BSCP514 regarding the sending of Meter Technical Details on receipt of a D0170 data flow View summary
Modification Implemented BSC Panel 14 Jan 2016 P331 Extended Dispute Deadline at the Post-Final Settlement Run under exceptional circumstances View summary Panel (Self-Gov)
Change Proposal Rejected ELEXON 14 Jan 2016 CP1455 Sending revised Meter Technical Details following a change of MOA View summary
Change Proposal Implemented ELEXON 11 Jan 2016 CP1454 Amendment to the Category 1 Materiality Calculation View summary
Change Proposal Implemented ELEXON 7 Jan 2016 CP1453 Changes to SAA Service Description and SAA URS for P269 systems fix View summary
Issue Closed RWE Supply and Trading 10 Dec 2015 Issue 063 Improved reporting of event history and profile availability during outage events on the BMRS REMIT pages
Modification Implemented ScottishPower Energy Retail 1 Dec 2015 P330 Allowing ELEXON to tender for the Uniform Network Code Gas Performance Assurance Framework Administrator (PAFA) role View summary Ofgem
Modification Implemented National Grid 25 Nov 2015 P329 Changes to REMIT inside information reporting View summary Ofgem
Change Proposal Implemented ELEXON 18 Nov 2015 CP1452 Aligning BSCP502 with amendments to the Electricity Supply Licence View summary
Modification Implemented National Grid 6 Nov 2015 P328 Clarifying BSC SBR definitions to align with the BSAD and SMAF Methodology Statements View summary Ofgem
Issue Closed ScottishPower Energy Retail 2 Nov 2015 Issue 062 Amending the BSC arrangements to allow ELEXON to tender for the Uniform Network Code Gas Performance Assurance Framework Administrator (PAFA) role
Issue Closed EDF Energy 28 Oct 2015 Issue 061 Changes to Gate Closure for Energy Contract Volume Notifications
Change Proposal Implemented ELEXON 2 Oct 2015 CP1451 Allowing HH Default EACs for all HH Measurement Classes View summary
Change Proposal Implemented ELEXON 18 Sept 2015 CP1450 Security Requirements for CoP10 Metering Equipment View summary
Change Proposal Implemented ELEXON 18 Sept 2015 CP1449 Updates to BSCP520 and the SVA Data Catalogue following a review View summary
Modification Implemented BSC Panel 10 Sept 2015 P327 Clarifications to P305 legal text View summary Panel (Self-Gov)
Change Proposal Rejected ELEXON 9 Sept 2015 CP1448 Changes to allowable software for Method 3 Proving Tests View summary
Change Proposal Implemented npower 2 Sept 2015 CP1447 Amendment to the timescales for sending the D0010 from Supplier to NHHDC on a Smart Change of Supply event View summary
Modification Implemented Haven Power 25 Aug 2015 P326 Introduction of a non-Working Day adjustment to the Credit Cover Percentage calculation View summary Panel (Self-Gov)
Change Proposal Implemented EDF Energy 13 Aug 2015 CP1446 Allow smart CoS agreed Disputed Reads to be entered into Settlement View summary
Modification Withdrawn SSE Energy Supply Ltd 30 Jul 2015 P325 Improving the accountability of BSCCo to stakeholders and better aligning BSCCo governance with best practice View summary Ofgem
Modification Implemented National Grid 24 Jul 2015 P324 Review of BSCCo’s governance: introducing improved accountability to BSC Parties View summary Ofgem
Change Proposal Implemented ELEXON 24 Jul 2015 CP1445 BSCP516 alignment with revised P272 Implementation Date View summary
Change Proposal Implemented Haven Power 7 Jul 2015 CP1444 Extend the timescale of CoP10 Proving Tests until the implementation of P272 View summary
Modification Implemented National Grid 26 Jun 2015 P323 Enabling inclusion and treatment of SBR in the Imbalance Price’ View summary Ofgem
Issue Closed National Grid 8 Jun 2015 Issue 060 Interfaces between the European Balancing Project TERRE and the current GB market arrangements
Change Proposal Implemented ELEXON 12 May 2015 CP1443 Standard Settlement Configurations for smart and advanced Meters View summary
Change Proposal Implemented ELEXON 5 May 2015 CP1442 Clarifying the application process for Metering Dispensations View summary
Modification Implemented RWE Npower 28 Apr 2015 P322 Revised Implementation Arrangements for Mandatory Half Hourly Settlement for Profile Classes 5-8 View summary Ofgem
Change Proposal Implemented ELEXON 28 Apr 2015 CP1441 Allowing the Peer Comparison technique to be reported on a Supplier Agent level View summary
Change Proposal Implemented ELEXON 28 Apr 2015 CP1440 Exempting Metering Systems in Measurement Class F from proving tests View summary
Change Proposal Implemented SmartestEnergy 10 Apr 2015 CP1439 Proving Test Permissible Software View summary
Modification Implemented Smartest Energy 1 Apr 2015 P321 Publication of Trading Unit Delivery Mode View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 30 Mar 2015 CP1438 Clarification of information required for raising a Trading Dispute View summary
Change Proposal Implemented ELEXON 16 Mar 2015 CP1437 Recommended amendments to BSCP68 View summary
Modification Implemented British Gas 13 Mar 2015 P320 Reporting on Profile Classes 5 – 8 Metering Systems after the implementation of P272 View summary Ofgem
Modification Implemented BSC Panel 12 Mar 2015 P319 Removal of annual RMP review from PAF View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 5 Mar 2015 CP1436 EAC/AA and NHHDA Applications – Windows Server upgrade View summary
Change Proposal Implemented ELEXON 3 Mar 2015 CP1435 Amendments to the SAA-I042 flow View summary
Modification Implemented Green Energy 26 Feb 2015 P318 Change of Party ID/Company Number Through Enabling Assignment View summary Panel (Self-Gov)
Change Proposal Implemented SSEPD 16 Feb 2015 CP1434 Amend the three digit numeric Line Loss Factor Class (LLFC) Id to an Alphanumeric LLFC Id View summary
Change Proposal Implemented ELEXON 16 Feb 2015 CP1433 Clarification of which Metering Systems are captured by the P272 requirements View summary
Change Proposal Implemented ELEXON 16 Feb 2015 CP1432 HH Default EAC by Measurement Class View summary
Change Proposal Implemented ELEXON 16 Feb 2015 CP1431 Extend Site Check Exemption to Measurement Classes F and G View summary
Change Proposal Implemented ELEXON 9 Feb 2015 CP1430 Clarification to the ECVN/MVRN processes View summary
Change Proposal Implemented ELEXON 16 Jan 2015 CP1429 Proving Test timescales View summary
Change Proposal Implemented RWE npower 15 Jan 2015 CP1428 Inclusion of Party Agents in the event of Post Final Settlement Runs View summary
Change Proposal Implemented ELEXON 14 Jan 2015 CP1427 Housekeeping change to BSCP503 for EMR View summary
Change Proposal Implemented Scottish Power 12 Jan 2015 CP1426 Receipt of the D0296 flow at II View summary
Modification Implemented ENWL 8 Jan 2015 P317 Changes to the Unmetered Supplies obligations in the BSC View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 22 Dec 2014 CP1425 Consequential changes to BSCP201 following EMR View summary
Change Proposal Implemented ELEXON 14 Nov 2014 CP1424 Amending the requirement for Data Aggregators to perform annual Full SMRS refreshes View summary
Change Proposal Rejected ELEXON 14 Nov 2014 CP1423 Amendments to BSCP68 following a review View summary
Modification Rejected RWE Supply and Trading GmbH 4 Nov 2014 P316 Introduction of a single marginal cash-out price View summary Ofgem
Issue Closed ELEXON 31 Oct 2014 Issue 059 Consideration of the PARMS and Supplier Charge changes introduced by P272 and P300.
Change Proposal Implemented ELEXON 25 Sept 2014 CP1422 Add a DMP for an Offshore Transmission Connection Point to the HH Codes of Practice View summary
Modification Implemented Smartest Energy 22 Sept 2014 P315 Publication of Gross Supplier Market Share Data View summary Ofgem
Change Proposal Implemented ELEXON 12 Sept 2014 CP1421 Linking BSCP520 obligations to the Operational Information Document View summary
Change Proposal Rejected ELEXON 12 Sept 2014 CP1420 Allowance of mid-year LLF resubmissions due to material consumption or generation changes View summary
Modification Rejected First Utility 5 Sept 2014 P314 Reduction in PAR from 500MWh to 350MWh View summary Ofgem
Issue Closed UK Power Networks 2 Sept 2014 Issue 058 Obligation to estimate missing or correct defective Reactive Energy measurements from CVA metering systems
Change Proposal Implemented ELEXON 20 Aug 2014 CP1419 Improving data accuracy by enabling the D0312 flow to be sent on a Change of Supplier View summary
Modification Implemented BSC Panel 14 Aug 2014 P313 Required Housekeeping Changes to Implement P295 and EMR View summary Panel (Self-Gov)
Modification Implemented BSC Panel 14 Aug 2014 P312 Required Housekeeping Changes to Implement P298 and EMR View summary Panel (Self-Gov)
Modification Implemented BSC Panel 14 Aug 2014 P311 Required Housekeeping Changes to Implement P291 and P295 View summary Panel (Self-Gov)
Modification Implemented NEAS Energy A/S 31 Jul 2014 P310 Revised Credit Cover for Exporting Supplier BM Units View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 1 Jul 2014 CP1418 Validation of D0041 flows View summary
Modification Implemented RWE Supply and Trading GmbH 26 Jun 2014 P309 Facility to enable BSC Parties to select either replacement contract notifications or additional contract notifications View summary Ofgem
Change Proposal Implemented ELEXON 10 Jun 2014 CP1417 Reading validation for smart Meters View summary
Change Proposal Implemented ELEXON 10 Jun 2014 CP1416 Remotely disabled smart Meters View summary
Change Proposal Implemented ELEXON 10 Jun 2014 CP1415 Reading submission frequency for smart Meters View summary
Modification Withdrawn Eggborough Power 4 Jun 2014 P308 Alternative security product for securing credit under the BSC View summary Ofgem
Modification Implemented E.ON 4 Jun 2014 P307 Amendments to Credit Default arrangements View summary Ofgem
Modification Implemented E.ON 4 Jun 2014 P306 Expanding the definition of a ‘Letter of Credit’ to include regulated insurance companies View summary Panel (Self-Gov)
Modification Implemented National Grid 30 May 2014 P305 Electricity Balancing Significant Code Review Developments View summary Ofgem
Modification Rejected National Grid 30 May 2014 P304 Reduction in PAR from 500MWh to 250MWh View summary Ofgem
Issue Closed ELEXON 22 May 2014 Issue 057 Should Half-Hourly Settlement be mandatory for certain Unmetered Supplies customers?
Modification Implemented Utilita 21 May 2014 P303 Amendments to the Provisions for BSCCo Directors View summary Ofgem
Change Proposal Implemented ELEXON 20 May 2014 CP1413 Amendments to BSCP535 ‘Technical Assurance’ following a review View summary
Modification Implemented EDF Energy 16 May 2014 P302 Improve the Change of Supplier Meter read and Settlement process for smart Meters View summary Ofgem
Change Proposal Rejected ESP Electricity Limited 14 May 2014 CP1414 Combining LDSO and Embedded LDSOs UMS Inventories on to single LDSO MSID. View summary
Issue Closed National Grid 7 May 2014 Issue 056 Treatment of the new SBR and DSBR services in the imbalance price
Change Proposal Implemented ELEXON 2 May 2014 CP1412 Reporting of deleted BOAs within the SAA-I014 report View summary
Modification Implemented National Grid 24 Apr 2014 P301 Replacement of National Consumer Council by Citizens Advice and Citizens Advice Scotland View summary Panel (Self-Gov)
Change Proposal Implemented SSE Energy Supply Ltd 20 Mar 2014 CP1411 Remove Exemption from Proving Tests for Code of Practice 10 Metering Systems View summary
Change Proposal Rejected ELEXON 13 Mar 2014 CP1410 Transfer of Outstation Level 3 Passwords for Advanced Meters View summary
Change Proposal Implemented ELEXON 13 Mar 2014 CP1409 CoMC process for advanced Meters View summary
Modification Implemented ENWL 6 Mar 2014 P300 Introduction of new Measurement Classes to support Half Hourly DCUSA Tariff Changes (DCP179) View summary Ofgem
Change Proposal Implemented ELEXON 14 Feb 2014 CP1408 Excessively Large EAC/AA Control Points View summary
Issue Closed ELEXON 14 Feb 2014 Issue 055 Review of the approach to the calculation and application of GSP Group Correction Scaling Weights
Issue Closed ELEXON 5 Feb 2014 Issue 054 Discrepancies between the points of measurement required in the BSC and the CoPs and the physical points of connection
Change Proposal Implemented ELEXON 3 Feb 2014 CP1407 Updates to current LLF audit templates View summary
Modification Implemented National Grid 31 Jan 2014 P299 Allow National Grid access to Metering System Metered Consumption data to support the DSBR service View summary Ofgem
Change Proposal Implemented ELEXON 31 Jan 2014 CP1406 Electronic version of the Self Assessment Document View summary
Change Proposal Implemented EDF Energy 19 Dec 2013 CP1405 Facilitating Faster Switching in the NHH Market View summary
Change Proposal Implemented National Grid 11 Dec 2013 CP1404 Allowing Registration of Multiple Transmission System Boundary Point on one BSCP25 form and removal of requirement for OS coordinates for Grid Supply Points and onshore Transmission System Boundary Points. View summary
Issue Closed EDF Energy 9 Dec 2013 Issue 053 Reforming the Change of Supplier meter read process for smart electricity meters
Change Proposal Implemented ELEXON 26 Nov 2013 CP1403 Additional requirements to BSCP15 and BSCP25 for System Operators to provide more information on new connections’ View summary
Modification Implemented National Grid 25 Nov 2013 P298 Consequential amendments to the BSC Modification process following the implementation of Third package and other miscellaneous changes View summary Ofgem
Change Proposal Implemented ELEXON 9 Oct 2013 CP1402 Aligning the Deliverables in the Profile Administration Service Description with the Data Analyst Contract. View summary
Change Proposal Implemented Npower 27 Sept 2013 CP1401 Replace residual negative EACs for pre-RF Settlement Days without affecting post-RF data View summary
Change Proposal Implemented National Grid 6 Sept 2013 CP1400 Amendment of the System Operator flag via BSCP18. View summary
Change Proposal Implemented ELEXON 6 Sept 2013 CP1399 Business Process Operations (BPO) Service Rebranding View summary
Change Proposal Implemented ELEXON 22 Aug 2013 CP1398 Clarifications to BSCP520 ‘Unmetered Supplies registered in SMRS' View summary
Change Proposal Implemented Npower 22 Aug 2013 CP1397 Improvements to the Balancing Mechanism Reporting System (BMRS) Electricity Summary Page – Indicative Triad Demand Information tables View summary
Change Proposal Implemented Smartest Energy 22 Aug 2013 CP1396 Clarifications and Formalising scenarios for the BSCP509 Market Domain Data Changes Request Process View summary
Issue Closed BSC Panel 8 Aug 2013 Issue 052 Billing for Data Transfer costs and the 'Total Cost of Ownership' for using a replacement solution to send DTS Flows
Modification Implemented National Grid 24 Jul 2013 P297 Receipt and Publication of New and Revised Dynamic Data Items View summary Ofgem
Change Proposal Implemented British Gas 19 Jul 2013 CP1395 Distribution of Configuration Details for Smart Meters View summary
Modification Implemented BSC Panel 11 Jul 2013 P296 Introduction of a ‘Fast Track’ Modification Process following the outcomes of the Code Governance Review (Phase 2) View summary Ofgem
Change Proposal Implemented ELEXON 4 Jul 2013 CP1394 Use of SMETS compliant Meters for Profiling View summary
Change Proposal Implemented ELEXON 4 Jul 2013 CP1393 Changes to BSCP27 to align with the current process carried out by the TAA for the Consumption Data Comparison Check. View summary
Change Proposal Implemented National Grid 4 Jul 2013 CP1392 BSCP18 Bid-Offer Acceptance Related Data Corrections to the SAA system via Electronic File Transfer method, instead of manual Email method View summary
Issue Closed ELEXON 2 Jul 2013 Issue 051 Multiple MOAs and Third Party Access
Modification Implemented National Grid 1 Jul 2013 P295 Submission and publication of Transparency regulation data via the BMRS View summary Ofgem
Issue Closed Npower 26 Jun 2013 Issue 050 Customer Appointed Agents
Issue Closed ELEXON 24 Jun 2013 Issue 049 Change of Measurement Class (CoMC) process for Advanced Meters
Issue Closed ELEXON 5 Jun 2013 Issue 048 SMETS & Codes of Practice (COPs)
Modification Implemented E.ON 3 Jun 2013 P294 Addition of Offshore Transmission System and OTSUA to the definition of the Total System View summary Ofgem
Modification Implemented BSC Panel 9 May 2013 P293 Changes to BSC Section H 'Audit' and BSC Service Description for BSC Audit to reflect current Practice View summary Panel (Self-Gov)
Issue Closed National Grid 26 Apr 2013 Issue 047 GB Implementation of the European Transparency Regulation
Issue Closed ELEXON 4 Apr 2013 Issue 046 Non Half Hourly Interoperability
Change Proposal Implemented ELEXON 22 Mar 2013 CP1391 Clarify the existing MDD registration criteria for new Suppliers within the MDD (BSCP509) and Qualification (BSCP537) procedures View summary
Change Proposal Implemented ELEXON 22 Mar 2013 CP1390 New MDD Entity for SMETS Version View summary
Modification Implemented E.ON 4 Mar 2013 P292 Amending Supplier & Meter Operator Agent responsibilities for smart Meter Technical Details View summary Ofgem
Change Proposal Implemented ELEXON 22 Feb 2013 CP1389 Removal of Lux Meter Requirement for PECU Arrays View summary
Modification Implemented SSE 30 Jan 2013 P291 REMIT Inside Information Reporting Platform for GB Electricity View summary Ofgem
Modification Withdrawn Smartest Energy 3 Jan 2013 P290 Enabling ELEXON to participate in roles in support of the Smart Energy Code (SEC) Panel View summary Ofgem
Change Proposal Rejected ELEXON 28 Dec 2012 CP1388 Meter Technical Details for Smart Meters View summary
Change Proposal Implemented ELEXON 28 Dec 2012 CP1387 Clarifications to BSCP533 and Appendices View summary
Modification Rejected BSC Panel 13 Dec 2012 P289 Enabling ELEXON to participate in tendering for the DCC Licensee role via a subsidiary View summary Ofgem
Change Proposal Rejected Npower 30 Nov 2012 CP1386 Improving Settlement Accuracy for Unmetered Supply on a Change of Supplier or Change of Agent View summary
Change Proposal Implemented Npower 30 Nov 2012 CP1385 Notification of NHH Energisation Status Change by LDSO View summary
Change Proposal Implemented ELEXON 30 Nov 2012 CP1384 Clarification on disconnection and associated processes View summary
Modification Implemented BSC Panel 8 Nov 2012 P288 Aligning Supplier Charge SP08a calculation with current practice View summary Panel (Self-Gov)
Change Proposal Implemented ELEXON 26 Oct 2012 CP1383 Upgrade of NHHDA and EAC/AA systems to Oracle 11g’ View summary
Change Proposal Implemented ELEXON 26 Oct 2012 CP1382 Clarification of IDD Rules for leading zeroes View summary
Change Proposal Rejected ELEXON 26 Oct 2012 CP1381 Negative Wind Generation Forecast on BMRS View summary
Change Proposal Implemented ELEXON 31 Aug 2012 CP1380 Pre-site audit visits - Technical Assurance of Metering View summary
Change Proposal Implemented ELEXON 3 Aug 2012 CP1379 Service Review of the Technical Assurance of Metering Systems View summary
Change Proposal Rejected Smartest Energy 3 Aug 2012 CP1378 Alternative to CP1377 - Clarifying rules on Third Party Access on Licence Exempt Distribution Network View summary
Change Proposal Implemented ELEXON 3 Aug 2012 CP1377 Clarifying rules on Third Party Access on Licence Exempt Distribution Network View summary
Issue Closed British Gas 16 Jul 2012 Issue 045 Introduction of Change of Supply Agreed Read Principle to correct all errors in Settlements
Change Proposal Implemented ELEXON 29 Jun 2012 CP1376 Reporting Failed Instructions View summary
Change Proposal Implemented ELEXON 29 Jun 2012 CP1375 Increasing material impact threshold View summary
Modification Rejected BSC Panel 14 Jun 2012 P287 Allow the BSC Panel to conduct Modification Business via teleconference View summary Panel (Self-Gov)
Modification Rejected National Grid 25 May 2012 P286 Revised treatment of RCRC for generation BM Units View summary Ofgem
Modification Implemented National Grid 25 May 2012 P285 Revised treatment of RCRC for Interconnector BM Units View summary Ofgem
Modification Implemented National Grid 17 May 2012 P284 Expansion of ELEXON's role via a 'contract model' View summary Ofgem
Change Proposal Rejected ELEXON 27 Apr 2012 CP1374 TAA Audits View summary
Change Proposal Implemented F&S 27 Apr 2012 CP1373 Submission to EWS via spreadsheet View summary
Change Proposal Implemented ELEXON 20 Apr 2012 CP1372 Clarification to CP1356 View summary
Issue Closed National Grid 20 Apr 2012 Issue 044 Balancing Mechanism Pricing
Modification Implemented BSC Panel 12 Apr 2012 P283 Reinforcing the Commissioning of Metering Equipment Processes View summary Ofgem
Change Proposal Implemented ELEXON 30 Mar 2012 CP1371 LLF Audits offsite View summary
Change Proposal Implemented ELEXON 30 Mar 2012 CP1370 Revised rules for default LLFs View summary
Modification Rejected Statkraft 26 Mar 2012 P282 Allow MVRNs from Production to Consumption or Vice Versa View summary Ofgem
Change Proposal Implemented ELEXON 2 Mar 2012 CP1369 Increased Flexibility in BSCP550 Data Splitting Algorithms View summary
Change Proposal Implemented ELEXON 2 Mar 2012 CP1368 UMSUG BSCP520 changes View summary
Change Proposal Implemented ELEXON 10 Feb 2012 CP1367 Interconnector Fuel types View summary
Modification Implemented E.ON 30 Dec 2011 P281 BSCCo Board Structure View summary Ofgem
Change Proposal Implemented ELEXON 23 Dec 2011 CP1366 Data Quality Obligations for Outgoing Supplier Agents View summary
Change Proposal Implemented ELEXON 23 Dec 2011 CP1365 Shortening Profile Production Timescales View summary
Modification Rejected ENWL 28 Nov 2011 P280 New Measurement Classes View summary Ofgem
Change Proposal Implemented ELEXON 25 Nov 2011 CP1364 CALF Data Item View summary
Change Proposal Rejected ELEXON 25 Nov 2011 CP1363 GVC - Direction when addressing errors View summary
Change Proposal Rejected ELEXON 25 Nov 2011 CP1362 GVC - Removal of extreme EACs View summary
Change Proposal Rejected ENWL 25 Nov 2011 CP1361 GVC - Removing Negative EACs View summary
Change Proposal Implemented ENWL 25 Nov 2011 CP1360 GVC - DMX Audit Records View summary
Change Proposal Implemented ELEXON 28 Oct 2011 CP1359 Introducing new products into the MIDS View summary
Change Proposal Implemented ELEXON 28 Oct 2011 CP1358 Change to timeband weightings in the MIDS View summary
Change Proposal Implemented ELEXON 28 Oct 2011 CP1357 MSID Allocation Process View summary
Modification Implemented BSC Panel 13 Oct 2011 P279 Export form GSP group View summary Panel (Self-Gov)
Modification Implemented National Grid 30 Sept 2011 P278 Treatment of Transmission Losses for Interconnector Users View summary Ofgem
Modification Rejected Vattenfall 30 Sept 2011 P277 Allow Interconnector BM Units to choose their P/C Status View summary Ofgem
Modification Implemented National Grid 30 Sept 2011 P276 Introduce an additional trigger/threshold for suspending the market in the event of a Partial Shutdown View summary Ofgem
Modification Implemented ENWL 30 Sept 2011 P275 GVC - Extending Performance Assurance View summary Panel (Self-Gov)
Modification Rejected ENWL 30 Sept 2011 P274 Cessation of Compensatory Adjustments View summary Ofgem
Change Proposal Implemented ELEXON 30 Sept 2011 CP1356 Demand BMU Aggregation rules View summary
Change Proposal Implemented ELEXON 30 Sept 2011 CP1355 Updates to BSCP537 (Testing requirements) View summary
Issue Closed E.ON 9 Sept 2011 Issue 043 On-site generation during planned outages
Change Proposal Implemented ELEXON 2 Sept 2011 CP1354 Updates to BSCP537 (SAD) View summary
Change Proposal Implemented E.ON 2 Sept 2011 CP1353 ECOES and BSCP514 View summary
Change Proposal Implemented ELEXON 2 Sept 2011 CP1352 Changes to the FAA Billing Process View summary
Modification Implemented BSC Panel 11 Aug 2011 P273 Make the SVA Funding Share Calculation robust to changes in Scaling Weights View summary Panel (Self-Gov)
Change Proposal Rejected CE Electric 5 Aug 2011 CP1351 CoP4 - Meter Equipment Commissioning View summary
Change Proposal Implemented EDF 5 Aug 2011 CP1350 MTD update BSCP514 View summary
Change Proposal Implemented ELEXON 1 Jun 2011 CP1349 Changes to accommodate EU metering standards View summary
Modification Implemented Smartest Energy 20 May 2011 P272 Mandatory Half Hourly Settlement for Profile Classes 5-8 View summary Ofgem
Change Proposal Implemented ELEXON 6 May 2011 CP1348 Supplier Charges following implementation of CP1334 'New PARMS Serials' View summary
Issue Closed National Grid 4 May 2011 Issue 042 Black Start Generator – Defining a ‘Local Shutdown’
Issue Closed E.ON 28 Apr 2011 Issue 041 Improving the Speed and Accuracy of Data Flows
Change Proposal Implemented ELEXON 27 Apr 2011 CP1347 SVAA process embedded networks View summary
Change Proposal Implemented ELEXON 1 Apr 2011 CP1346 Proving tests shall not be based on verbal MTDs View summary
Issue Closed E.ON 29 Mar 2011 Issue 040 Review of ELEXON Governance and Funding Arrangements for New Business Opportunities
Change Proposal Implemented ELEXON 4 Mar 2011 CP1345 NG interface XML View summary
Modification Rejected SSE 28 Feb 2011 P271 NETSO consultations View summary Ofgem
Modification Rejected ENWL 25 Feb 2011 P270 LLFs for Offshore GSPs View summary Ofgem
Modification Implemented Smartest Energy 3 Feb 2011 P269 BMU Account flipping View summary Panel (Self-Gov)
Modification Implemented Statkraft 31 Jan 2011 P268 P/C Status export BMU View summary Ofgem
Modification Withdrawn RWE Npower 28 Jan 2011 P267 Consideration of wider industry developments and duration of proposed changes when agreeing progression timetables View summary Ofgem
Change Proposal Implemented ELEXON 28 Jan 2011 CP1344 Correcting errors in BSCP533 View summary
Change Proposal Implemented CE Electric UK 28 Jan 2011 CP1343 Appropriate Line Loss Factors for High Voltage Customers metered at primary substations View summary
Modification Implemented SSE 1 Oct 2010 P266 Reactive Power View summary Ofgem
Issue Closed E.ON 24 Sept 2010 Issue 039 Unrecorded Units identified by Revenue Protection Services
Change Proposal Implemented CE Electric UK 21 Sept 2010 CP1342 Housekeeping change to CoP9 View summary
Change Proposal Implemented ELEXON 3 Sept 2010 CP1341 Multi-Level Static Dimming Devices View summary
Change Proposal Implemented ELEXON 3 Sept 2010 CP1340 Changes to BSCP537 Appendix 1 - Self Assessment Document (SAD) to better reflect the BSC Obligations View summary
Modification Rejected RWE Npower 31 Aug 2010 P265 Improving the Accuracy of the Credit Calculation View summary Ofgem
Change Proposal Implemented ELEXON 6 Aug 2010 CP1339 Efficiency Changes to BSCP533 & BSCP536 View summary
Modification Rejected Drax Power 2 Aug 2010 P264 Two-thirds majority requirement for Panel recommendations on licence originated Modifications' View summary Ofgem
Modification Implemented National Grid 2 Aug 2010 P263 ‘Code Governance Review: Send Back Process and Environmental Assessment’ View summary Ofgem
Modification Implemented National Grid 2 Aug 2010 P262 Code Governance Review: Significant Code Reviews, Self Governance and Code Administration Code of Practice' View summary Ofgem
Change Proposal Implemented ESP 2 Jul 2010 CP1338 Guidance for Complex Sites View summary
Change Proposal Implemented ELEXON 2 Jul 2010 CP1337 Improvements to the TDC Process View summary
Change Proposal Rejected EDF 2 Jul 2010 CP1336 UMSO Adjustment to EACs and Pseudo HH Units based on Physical Audit Findings View summary
Modification Implemented BSC Panel 10 Jun 2010 P261 Correcting an omission in the BSC arising from the P216 Alternative Modification legal text View summary Ofgem
Modification Rejected National Grid 1 Jun 2010 P260 Extension To Data Provided To the Transmission Company In The TUoS Report View summary Ofgem
Change Proposal Implemented ELEXON 28 May 2010 CP1335 Creation of New Auxiliary MTD flow View summary
Change Proposal Implemented EON 27 May 2010 CP1334 PARMS Review 2 - New Serials View summary
Modification Rejected National Grid 4 May 2010 P259 Provision of Applicable Balancing Service Volumes for Interconnectors View summary Ofgem
Change Proposal Implemented ELEXON 29 Apr 2010 CP1333 Reporting of So-So Trades View summary
Change Proposal Implemented ELEXON 29 Apr 2010 CP1332 Offshore T-mission - BSCP75 examples View summary
Modification Rejected BSC Panel 8 Apr 2010 P258 Including Party Agents in the Trading Disputes process View summary Ofgem
Modification Implemented BSC Panel 8 Apr 2010 P257 Removal of the concept of Trading Queries View summary Ofgem
Modification Implemented BSC Panel 8 Apr 2010 P256 Improving efficiency and Clarity of the Trading Disputes process View summary Ofgem
Modification Implemented BSC Panel 8 Apr 2010 P255 Profile Administrator: creating flexibility in discharging the services View summary Ofgem
Change Proposal Implemented ELEXON 8 Apr 2010 CP1331 Streamline Party/Party Agent Registration process View summary
Change Proposal Implemented ELEXON 8 Apr 2010 CP1330 Streamlining Registration Process View summary
Change Proposal Implemented ELEXON 8 Apr 2010 CP1329 Streamline CVA Qualification Process View summary
Change Proposal Implemented ELEXON 8 Apr 2010 CP1328 ECVAA Web Service request process View summary
Change Proposal Implemented ENWL 8 Apr 2010 CP1327 Inclusion of a new BSCP Entity 27 View summary
Modification Implemented BSC Panel 11 Mar 2010 P254 Removal of SVA main and specified Charge amounts from the BSC View summary Ofgem
Modification Implemented BSC Panel 11 Mar 2010 P253 Improving the Accuracy of Credit Calculations View summary Ofgem
Modification Rejected Utilita 24 Feb 2010 P252 Removal of Trading Parties’ ability to submit two votes at elections of BSC Panel industry members' View summary Ofgem
Change Proposal Implemented ELEXON 23 Feb 2010 CP1326 LLF updates to BSCP128 View summary
Change Proposal Implemented ELEXON 23 Feb 2010 CP1325 Removal old PARMS Serials View summary
Modification Rejected E.ON 1 Feb 2010 P251 Revision of the election process for BSC Panel Industry Members View summary Ofgem
Change Proposal Implemented ELEXON 8 Jan 2010 CP1324 Access to >=132kV Offshore Metering View summary
Change Proposal Implemented ELEXON 8 Jan 2010 CP1323 Alignment of SVA Qualification and SAD View summary
Change Proposal Implemented ELEXON 8 Jan 2010 CP1322 CSD Architectural Principles Document View summary
Modification Implemented National Grid 4 Jan 2010 P250 Prevention of "Timing Out" of Authority decisions on Modification Proposals View summary Ofgem
Modification Implemented BSC Panel 10 Dec 2009 P249 Revision of banking arrangements under the BSC View summary Ofgem
Modification Implemented BSC Panel 10 Dec 2009 P248 Aligning BSC interest calculation requirements with the FAA calculation method and P235 principles’ View summary Ofgem
Change Proposal Implemented ELEXON 9 Dec 2009 CP1321 Housekeeping Change to correct a manifest error in BSCP301 and NETA IDD Part 2 View summary
Modification Implemented E.ON 1 Dec 2009 P247 Proposer ownership of Modification Proposals View summary Ofgem
Modification Implemented The Electricity Network Company Limited 30 Nov 2009 P246 Reporting to LDSOs of Aggregated Metering Data for Embedded Networks’ View summary Ofgem
Change Proposal Rejected ELEXON 27 Nov 2009 CP1320 Replacing erroneous CoS Reads View summary
Change Proposal Implemented ELEXON 13 Nov 2009 CP1319 Correction to table B4 of Appendix B in Code of Practice 4 View summary
Modification Implemented BSC Panel 23 Oct 2009 P245 Changes to Long Term vacant Sites Timescales' View summary Ofgem
Change Proposal Implemented ELEXON 21 Oct 2009 CP1318 Minor changes to BSCP601 View summary
Change Proposal Implemented ELEXON 21 Oct 2009 CP1317 Removal of requirement for NHHMOAs to notify NHHDCs of metering work before the event View summary
Issue Closed BSC Panel 8 Oct 2009 Issue 038 Potential Improvements to Credit Checking Rules to Support High Levels of Embedded Generation in North Scotland
Change Proposal Implemented ELEXON 25 Sept 2009 CP1316 Removal from BSCP536 of obligation to attach a copy of Form 536/01 to BSCCo Bill View summary
Change Proposal Implemented ELEXON 25 Sept 2009 CP1315 Maintenance of Outstation Types as part of Compliance and protocol approval View summary
Change Proposal Implemented ELEXON 22 Sept 2009 CP1314 Housekeeping change to SAA Service Description View summary
Modification Implemented National Grid 28 Aug 2009 P244 Provision of BritNed flow data to the BMRS View summary Ofgem
Change Proposal Implemented ELEXON 28 Aug 2009 CP1313 Removal of ELEXON’s role in processing Minimum Eligible Amount (MEA) requests View summary
Change Proposal Implemented ELEXON 28 Aug 2009 CP1312 Use of Gross Volume Correction in Post Final Settlement Runs (PFSR) View summary
Change Proposal Implemented ELEXON 28 Aug 2009 CP1311 Replacing Erroneous Forward Looking EACs View summary
Change Proposal Implemented British Gas 28 Aug 2009 CP1310 Clarifications to Gross Volume Correction (GVC) Process View summary
Change Proposal Implemented British Gas 28 Aug 2009 CP1309 Include reference to D0303 in BSCP514 and circumstances in which its use is mandatory View summary
Change Proposal Implemented ELEXON 31 Jul 2009 CP1308 Changes to Long Term Vacant Site process where a reading is obtained via a warrant View summary
Change Proposal Implemented ELEXON 31 Jul 2009 CP1307 Minor Changes to the Long Term Vacant Site Process View summary
Change Proposal Implemented ELEXON 31 Jul 2009 CP1306 Removal of second criterion for identifying a site as a Long Term Vacant (LTV) View summary
Change Proposal Rejected ELEXON 31 Jul 2009 CP1305 Use of Site Visit Check Code (SVCC) 20 with additional information in the Long Term Vacant (LTV) process View summary
Change Proposal Implemented ELEXON 31 Jul 2009 CP1304 Exclusion of certain Site Visit Check Codes (SVCC) within the Long Term Vacant (LTV) site process View summary
Modification Implemented Louis Dreyfus Energy Services L.P 28 Jul 2009 P243 Publication of Generator Forward Availability by Fuel Type View summary Ofgem
Modification Rejected E.ON 24 Jul 2009 P242 Treatment of Exemptable Generation Connected to Embedded Offshore L8Transmission Networks View summary Ofgem
Modification Implemented RWE Npower 21 Jul 2009 P241 Relaxation of Requirement to Separately Meter Licensable Generating Units View summary Ofgem
Modification Implemented RWE Npower 21 Jul 2009 P240 Switching Plant and Apparatus between BM units View summary Ofgem
Modification Implemented BSC Panel 9 Jul 2009 P239 Correcting manifest errors and modifying an interface in the P217 legal text View summary Ofgem
Change Proposal Implemented ELEXON 3 Jul 2009 CP1303 Requirement on Half Hourly Data Collectors to Estimate Missing Reactive Power Demand Values View summary
Change Proposal Implemented ELEXON 3 Jul 2009 CP1302 Requirement on Half Hourly Data Collectors to Validate Reactive Power Demand Values View summary
Change Proposal Implemented ELEXON 3 Jul 2009 CP1301 Registration Requirements for System Connection Points Between Onshore Distribution Systems and Offshore Transmission Systems View summary
Modification Implemented Centrica 26 Jun 2009 P238 Removal of the requirement to Meter each Boundary Point for Offshore Power Park Modules View summary Ofgem
Modification Implemented Centrica 26 Jun 2009 P237 Standard BM Unit configuration for offshore power park modules View summary Ofgem
Change Proposal Implemented ELEXON 5 Jun 2009 CP1299 Requirement on Half Hourly Data Collectors to Collect and Report Reactive Power Data (where the Meter is configured to record it) View summary
Change Proposal Implemented ELEXON 5 Jun 2009 CP1298 Requirement on MOAs to Configure Meters to Record Half Hourly Reactive Power Data (for Half Hourly Settled CT-Metered Customers) View summary
Change Proposal Implemented ELEXON 5 Jun 2009 CP1297 Mandatory Capability to Record Reactive Power Demand (kvar) Values in Code of Practice 10 (CoP10) Meters View summary
Change Proposal Implemented ELEXON 5 Jun 2009 CP1296 Mandatory Capability to Record Reactive Power Demand (kvar) Values in Code of Practice 5 (CoP5) Meters View summary
Change Proposal Implemented ELEXON 5 Jun 2009 CP1295 Process for distribution of MDD Updates not included in D0269/D0270 flows View summary
Change Proposal Rejected ELEXON 2 Jun 2009 CP1300 System changes to support Change of Market Participant ID for the SVA Agent and MDD Agent Roles from ‘CAPG’ to ‘SVAA’ View summary
Change Proposal Implemented ELEXON 2 Jun 2009 CP1294 Housekeeping Change to SVA Data Catalogue Volume 2 View summary
Issue Closed BSC Panel 14 May 2009 Issue 037 Boundary Point Metering and BM Unit Issues in Section K.
Change Proposal Implemented ELEXON 5 May 2009 CP1293 Housekeeping changes to BSCP537 Appendix 1 – Self Assessment Document (SAD) View summary
Change Proposal Implemented ELEXON 1 May 2009 CP1292 Clarify Meter Administrator requirements relating to PECU arrays. View summary
Change Proposal Implemented ELEXON 1 May 2009 CP1291 Clarify requirements on Meter Administrators relating to Equivalent Meters View summary
Change Proposal Implemented ELEXON 1 May 2009 CP1290 Rationalise and Simplify Unmetered Supplies requirements following a review by an Expert Group View summary
Change Proposal Implemented ELEXON 1 May 2009 CP1289 Correction to the Level 4 password requirement in Code of Practice 2 View summary
Modification Implemented First Hydro Company 28 Apr 2009 P236 Compensation Claims for MVRN Parties arising from an Outage View summary Ofgem
Change Proposal Implemented RWE npower 21 Apr 2009 CP1288 Revisions to Meter test points within Code of Practice 4 View summary
Modification Implemented BSC Panel 9 Apr 2009 P235 Aligning BSC requirements with the calculation of reconciliation interest performed by the Funds Administration Agent View summary Ofgem
Change Proposal Implemented ELEXON 3 Apr 2009 CP1287 Correction of inconsistencies in BSCP536 ‘Supplier Charges’ View summary
Change Proposal Implemented ELEXON 3 Apr 2009 CP1286 BSCP18 Operational Review: Additional flag in Transmission Company’s BOAL file to indicate an amended Bid-Offer Acceptance View summary
Change Proposal Implemented ELEXON 3 Apr 2009 CP1285 Unmetered Supplies: Clarification of Central Management System Requirements View summary
Change Proposal Implemented ELEXON 3 Apr 2009 CP1284 Ability for Third Parties to raise Change Proposals and replacement of energywatch with National Consumer Council. View summary
Change Proposal Implemented ELEXON 3 Apr 2009 CP1283 Revisions to data correction processes in BSCP18 View summary
Modification Implemented BSC Panel 12 Mar 2009 P234 Housekeeping Modification - Correction of manifest errors in P217 Legal Text View summary Ofgem
Modification Implemented BSC Panel 12 Mar 2009 P233 Housekeeping Modification - Correction of SSL references, Letters of Credit, Definitions in Section X and manifest errors in P215 Legal Text View summary Ofgem
Change Proposal Rejected ELEXON 27 Feb 2009 CP1282 Maintenance of Outstation Types as part of Compliance and Protocol Approval View summary
Change Proposal Implemented Npower 27 Feb 2009 CP1281 Revenue Protection: requiring the NHHDC to send EAC/AA data to the Supplier via the DTC View summary
Change Proposal Rejected Independent Power Networks Limited 5 Feb 2009 CP1280 SVAA to provide LDSOs with aggregated consumption data for embedded Distribution Systems View summary
Change Proposal Implemented ELEXON 4 Feb 2009 CP1279 Housekeeping Change to BSCP515 – Licensed Distribution View summary
Change Proposal Implemented ELEXON 9 Jan 2009 CP1278 Streamlining the SVA Standing Data Change Process View summary
Change Proposal Implemented ELEXON 9 Jan 2009 CP1275 Supplier Agents - Access to Meter Protocols View summary
Change Proposal Implemented ELEXON 9 Jan 2009 CP1272 Use of Appointment and Termination Flows in Unmetered Supplies (UMS) View summary
Change Proposal Implemented ELEXON 9 Jan 2009 CP1271 Align Market Domain Data Approval Timetable to SVG meetings View summary
Change Proposal Implemented ELEXON 9 Jan 2009 CP1270 Improvements to the Market Domain Data Process View summary
Change Proposal Implemented ELEXON 9 Jan 2009 CP1269 Publication of Additional NHH Combination Data in Market Domain Data View summary
Change Proposal Implemented ELEXON 9 Jan 2009 CP1268 Publication of new Funds Administration Agent (FAA) Service Description View summary
Change Proposal Implemented E.ON 6 Jan 2009 CP1273 Changes to the scope of CoP10 to cover current transformer operated Meters View summary
Change Proposal Rejected Npower 2 Jan 2009 CP1276 Process following the Installation of Small Scale Third Party Generating Plant (Alternative to CP1260 ‘Meter Investigation Process where a Site is Capable of Exporting (micro generation View summary
Change Proposal Implemented Scottish and Southern Energy 31 Dec 2008 CP1277 Change to UMS Charge code Approval Process View summary
Modification Implemented National Grid 23 Dec 2008 P232 Black Start and Fuel Security Compensation and Single Imbalance Price Derivation View summary Ofgem
Modification Implemented National Grid 23 Dec 2008 P231 Black Start and Fuel Security Code Procedures under the Balancing and Settlement Code (BSC) View summary Ofgem
Modification Implemented SSE 22 Dec 2008 P230 Enabling Interoperability through the use of CoP10 and CoP5 Metering View summary Ofgem
Change Proposal Implemented Scottish and Southern Energy 19 Dec 2008 CP1274 Transfer of Meter Technical Details View summary
Modification Rejected RWE Npower 28 Nov 2008 P229 Introduction of a seasonal Zonal Transmission Losses scheme View summary Ofgem
Change Proposal Implemented ELEXON 27 Nov 2008 CP1267 Registration of UMSOs and MAs in SMRS View summary
Change Proposal Implemented ELEXON 27 Nov 2008 CP1266 Updates and Refinements to BSCP504 View summary
Change Proposal Implemented ELEXON 27 Nov 2008 CP1265 TAA Documentation Changes Following Review View summary
Issue Closed BSC Panel 18 Nov 2008 Issue 036 Party Failure and Default
Modification Implemented BSC Panel 13 Nov 2008 P228 Replace BMRS High Grade Service charge amounts/rates with references to a BSC Website schedule View summary Ofgem
Modification Rejected APX 28 Sept 2008 P227 Extension Of The Definition Of ECVAA Systems to include the centrally provided communications network View summary Ofgem
Change Proposal Implemented ELEXON 18 Sept 2008 CP1263 Changes to Communication Requirements Document arising from Project Isis View summary
Change Proposal Implemented ELEXON 18 Sept 2008 CP1262 Service Improvements - Enhancements to the SVA Applications View summary
Change Proposal Implemented Npower 17 Sept 2008 CP1264 Clarification of Password Requirements in the Codes of Practice View summary
Issue Closed Utilita 8 Sept 2008 Issue 035 Timing of Gate Closure and Related Matters
Modification Implemented E.ON 1 Sept 2008 P226 Improving Large Combustion Plant Directive Information Disclosure View summary Ofgem
Change Proposal Implemented ELEXON 27 Aug 2008 CP1261 Introducing Metering Code of Practice 10 to facilitate smart metering in the Half Hourly (HH) market View summary
Change Proposal Rejected ELEXON 27 Aug 2008 CP1260 Meter Investigation Process where a Site is capable of Exporting (micro generation) View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1259 Distributor-Supplier Notification where a Site is capable of Exporting (micro generation) View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1258 Changes to BSCP520 Following Walkthrough View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1257 Calculation of EAC for Temporary Supplies View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1256 Action on Backdated D0052 Flows View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1255 Service Descriptions and other CSD Inconsistencies View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1254 Prevention of Unauthorised Access to AMR / Smart Meters View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1253 Remote Reading Assurance View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1252 Reading Submission Frequency for AMR Meters View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1251 Ensuring Inferior / Inappropriate Peripheral Devices not used to Collect AMR Reads View summary
Change Proposal Implemented ELEXON 27 Aug 2008 CP1250 Increase opportunity to update the NMTES View summary
Change Proposal Implemented ELEXON 8 Aug 2008 CP1249 MDDM and SVAA Terminology View summary
Change Proposal Implemented ELEXON 4 Jul 2008 CP1248 Early release of Meter Technical Details by Non Half Hourly Meter Operator Agent View summary
Modification Implemented BSC Panel 12 Jun 2008 P225 Housekeeping Modification: Updating References to the Party Service Lines View summary Ofgem
Change Proposal Implemented ELEXON 12 May 2008 CP1247 BMRS Amendments to Report Interconnector View summary
Change Proposal Implemented ELEXON 12 May 2008 CP1246 A New Interface from BMRS to the ETSOVista Reporting System View summary
Issue Closed Scottish Power 29 Apr 2008 Issue 034 Distribution Losses
Modification Rejected E.ON 28 Apr 2008 P224 Reactive Power Flows Associated with Exemptable Generating Plant View summary Ofgem
Change Proposal Implemented British Energy 24 Apr 2008 CP1245 Communication of Data Estimations and Substitutions for Central Volume Allocation Metering Systems View summary
Modification Implemented BSC Panel 10 Apr 2008 P223 Improvements to the Profile Administrator Service View summary Ofgem
Change Proposal Implemented ELEXON 2 Apr 2008 CP1244 Remove Authorisation Categories ZB & ZC from BSCP38 and amend BSCP537 to remove relevant references to BSCP38 and to include an amended statement on who can submit BSCP537 forms to ELEXON View summary
Change Proposal Rejected ELEXON 11 Mar 2008 CP1243 Mandating HHDC checks on quality of Meter Technical Details View summary
Change Proposal Implemented ELEXON 29 Feb 2008 CP1242 Movement of the functional requirements within PSL 180 ‘CVA Meter Operation’ into BSCP02 and BSCP06 View summary
Change Proposal Implemented ELEXON 29 Feb 2008 CP1241 Clarification of Interest payments by Non-Paying BSC Debtors View summary
Change Proposal Implemented ELEXON 29 Feb 2008 CP1240 Amendment to the Qualification Letter in BSCP537 to re-enforce the existing formulation for the legal status of the newly appointed Qualification Service Provider. View summary
Change Proposal Implemented ELEXON 29 Feb 2008 CP1239 Registration of Non-Standard BM Units View summary
Change Proposal Implemented ELEXON 29 Feb 2008 CP1238 Requirement to mandate compliance testing for Meters and Outstations View summary
Change Proposal Implemented ELEXON 29 Feb 2008 CP1237 Movement of functional requirements in PSL160 to BSCP501 following the creation of generic non-functional PSL100 View summary
Change Proposal Rejected Scottish Power 29 Feb 2008 CP1236 Clarification of De-Energised and Disconnection Processes - Obligations under BSCP 515 View summary
Change Proposal Implemented ELEXON 29 Feb 2008 CP1235 Movement of Functional Requirements in PSL150 (‘Half Hourly Data Aggregation’) to BSCP503 following the creation of PSL100 for generic non functional requirements. View summary
Change Proposal Implemented ELEXON 29 Feb 2008 CP1234 Movement of the functional requirements within PSL110 to BSCP514 and BSCP550, following the creation of a generic non functional PSL (PSL100) via CP1182. View summary
Change Proposal Implemented ELEXON 29 Feb 2008 CP1233 Transfer of the NHHDA functional requirements from PSL140 to BSCP505 View summary
Change Proposal Implemented Npower 29 Feb 2008 CP1232 Clarification of Technical Requirements for CoP2 View summary
Issue Closed BSC Panel 14 Feb 2008 Issue 033 Fuel Security Code guidance
Modification Implemented The Electricity Network Company Limited 1 Feb 2008 P222 Provision of EAC and AA data to Distributors View summary Ofgem
Change Proposal Implemented ELEXON 28 Jan 2008 CP1231 Housekeeping Change to BSCP15 View summary
Change Proposal Implemented ELEXON 11 Jan 2008 CP1230 Movement of the functional requirements within PSL120 ‘Non Half Hourly Data Collection’ to BSCP504 ‘Non Half Hourly Data Collection for SVA Metering Systems registered in the SMRS’, following the creation of a generic non functional PSL (PSL100) via CP118 View summary
Change Proposal Implemented ELEXON 11 Jan 2008 CP1229 Effective Date Validation in the D0052 View summary
Change Proposal Implemented ELEXON 11 Jan 2008 CP1228 CRA Service Description Re-write View summary
Change Proposal Implemented ELEXON 11 Jan 2008 CP1227 AFYC Recalculation View summary
Change Proposal Implemented Npower 11 Jan 2008 CP1226 Amendment to the ‘Investigate inconsistencies’ section of BSCP504 to comply with DTC configuration View summary
Change Proposal Implemented ELEXON 11 Jan 2008 CP1225 Review of D0215 ‘Provision of Site Technical Details’ and surrounding processes View summary
Modification Implemented BSC Panel 13 Dec 2007 P221 Amendments to the Balancing and Settlement Code to reflect changes to the Fuel Security Code View summary Ofgem
Issue Closed National Grid 27 Nov 2007 Issue 032 Black Start
Issue Closed Electricity Network Company 27 Nov 2007 Issue 031 Provision of Annualised Advance and Estimated Annual Consumption Data to LDSO
Change Proposal Implemented ELEXON 9 Nov 2007 CP1224 The Review of Code of Practice 4 View summary
Change Proposal Implemented ELEXON 9 Nov 2007 CP1223 Inconsistencies within the Code Subsidiary Documents regarding Business Requirements View summary
Change Proposal Implemented ELEXON 9 Nov 2007 CP1222 Inconsistencies within the SAA Service Description and URS View summary
Change Proposal Implemented ELEXON 9 Nov 2007 CP1221 Inconsistencies within the ECVAA Service Description View summary
Change Proposal Implemented ELEXON 9 Nov 2007 CP1220 Inconsistencies within the BMRA Service Description View summary
Change Proposal Implemented ELEXON 9 Nov 2007 CP1219 Inconsistencies within the CDCA Service Description and URS View summary
Change Proposal Implemented ELEXON 9 Nov 2007 CP1218 Movement of the functional requirements within PSL 170 ‘Meter Administrator’ to BSCP520 ‘Unmetered Supplies Registered in SMRS’, following the creation of a generic non functional PSL via CP1182. View summary
Change Proposal Rejected ELEXON 9 Nov 2007 CP1217 Discontinuing the BMRS High Grade Website View summary
Issue Closed Utilita 2 Nov 2007 Issue 030 Cash Out Review
Modification Implemented National Grid 26 Oct 2007 P220 Provision of New Data Items for Improving Market Information View summary Ofgem
Modification Implemented National Grid 26 Oct 2007 P219 Consistency between Forecast and Outturn Demand View summary Ofgem
Modification Rejected Good Energy Ltd 23 Oct 2007 P218 Facilitating Micro generation within the BSC View summary Ofgem
Modification Implemented RWE Npower 19 Oct 2007 P217 Revised Tagging Process and Calculation of Cash Out Prices View summary Ofgem
Change Proposal Implemented ELEXON 5 Oct 2007 CP1216 Changes to Section 3.1 of BSCP509 to reflect a new process for the acceptance of the Profile Administrator (PrA) 'Technical Product Deliverables' (TPDs) for inclusion in the Market Domain Data (MDD). View summary
Change Proposal Implemented ELEXON 21 Sept 2007 CP1215 Housekeeping Changes to BSCP38 ‘Authorisations’ View summary
Change Proposal Implemented ELEXON 7 Sept 2007 CP1214 Removal of PSL130 (‘Half Hourly Data Collection’) following the creation of a generic non functional PSL via CP1182 View summary
Change Proposal Implemented ELEXON 7 Sept 2007 CP1213 Improvement to Proving Test process: Audit trail View summary
Change Proposal Implemented ELEXON 7 Sept 2007 CP1212 Improvements to BSCP27 identified during operational use View summary
Change Proposal Rejected ELEXON 7 Sept 2007 CP1211 Changes to Codes of Practice 3, 5, 8 and 9 fusing requirements View summary
Issue Closed BSC Panel 23 Aug 2007 Issue 029 Profile Administrator (PrA) Model
Change Proposal Implemented ELEXON 9 Aug 2007 CP1210 Housekeeping changes to re-baseline November 2007 Release documents to reflect the P197 and P207 Releases View summary
Change Proposal Implemented Scottish Power 7 Aug 2007 CP1209 Inclusion of MSID Counts on the GSP Group Consumption Totals Report View summary
Change Proposal Implemented ELEXON 3 Aug 2007 CP1208 Changes to the Change of Profile Class Process set out in BSCP516 View summary
Change Proposal Implemented ELEXON 3 Aug 2007 CP1207 D0095 reporting in respect of past NHHDCs View summary
Change Proposal Implemented ELEXON 3 Aug 2007 CP1206 D0095 reporting of immaterial Supplier inconsistencies View summary
Change Proposal Implemented ELEXON 3 Aug 2007 CP1205 D0095 reporting of immaterial superfluous consumption View summary
Modification Implemented Smartest Energy 30 Jul 2007 P216 Audit of LLF Production View summary Ofgem
Modification Implemented Uskmouth Power Company Ltd 27 Jul 2007 P215 Revised Credit Cover Methodology for Generating BM Units View summary Ofgem
Change Proposal Implemented ELEXON 6 Jul 2007 CP1204 New charging code structure for Unmetered Supplies View summary
Change Proposal Implemented ELEXON 6 Jul 2007 CP1202 Changes to Meter Protocol Test Specification View summary
Modification Implemented Scottish Power 3 Jul 2007 P214 Issues Relating to Funds Administration View summary Ofgem
Change Proposal Implemented ELEXON 6 Jun 2007 CP1203 Replacement of the ‘Accuracy Requirements’ Tables in the Compliance Testing Appendix to BSCP601 View summary
Change Proposal Implemented ELEXON 17 May 2007 CP1201 Changes proposed following Operational Review of BSCP15 ‘BM Unit Registration’ and BSCP20 ‘Registration of Metering Systems For Central Volume Allocation’ View summary
Issue Closed BSC Panel 14 May 2007 Issue 028 Further Consideration on Section P
Change Proposal Implemented Scottish and Southern Energy 4 May 2007 CP1200 Removal of requirement for Proving Test Out of Timescale Escalation Report View summary
Change Proposal Implemented ELEXON 4 May 2007 CP1199 Changes to BSCP515 ‘Licensed Distribution’ to remove non functional information and add clarity View summary
Change Proposal Implemented ELEXON 4 May 2007 CP1198 Changes to BSCP14 ‘Processing of Manifest Error Claims’ to comply with the BSC. View summary
Change Proposal Implemented ELEXON 4 May 2007 CP1197 Clarification of Grid Supply Point (GSP) and GSP Group Aggregation Rules View summary
Change Proposal Implemented ELEXON 4 May 2007 CP1196 Changes to incorporate Central Management Systems in Unmetered Supplies arrangements View summary
Change Proposal Implemented ELEXON 4 May 2007 CP1195 Amendments to BSCP27 ‘Technical Assurance of Half Hourly Metering Systems for Settlement Purposes’ and BSCP38 ‘Authorisations’ with regard to Category I Authorised Signatories View summary
Change Proposal Implemented ELEXON 4 May 2007 CP1194 Publication of Authorised Person’s data on the BSC website. View summary
Change Proposal Implemented ELEXON 4 May 2007 CP1193 Recommended changes following an operational review of BSCP38 – ‘Authorisations’ View summary
Change Proposal Implemented Npower 4 May 2007 CP1192 Changes to the Investigate Inconsistencies processes in BSCP502 and BSCP514 (Half Hourly only) View summary
Change Proposal Implemented Central Change Coordination 4 May 2007 CP1191 Amendment of SVAA Service Line SSL330 to bring it in line with current contract arrangements. View summary
Change Proposal Implemented Central Change Coordination 4 May 2007 CP1190 Recommended Changes following an Operational Review of MDD Processes View summary
Change Proposal Implemented United Utilities 4 May 2007 CP1189 Change to allow SVA Line Loss Factors less than one View summary
Modification Rejected E.ON 27 Apr 2007 P213 Facilitating micro generation (Optional Single MPAN) View summary Ofgem
Modification Rejected BizzEnergy 27 Apr 2007 P212 Main Imbalance Price based on Market Reference Price View summary Ofgem
Issue Closed Scottish Power 23 Apr 2007 Issue 027 Funds Administration
Modification Rejected EDF Energy 16 Apr 2007 P211 Main Imbalance Price Based on Ex-post Unconstrained Schedule View summary Ofgem
Change Proposal Implemented Npower 2 Mar 2007 CP1188 Improvements to the use of the Half Hourly Aggregation Exception Report (D0235) View summary
Modification Implemented BSC Panel 5 Feb 2007 P210 Revisions to the Text in Section P related to Single Notifications of Energy Contract Volumes and Metered Volume Reallocations View summary Ofgem
Change Proposal Implemented ELEXON 2 Feb 2007 CP1187 UNIX Upgrades for NHHDA and EAC/AA View summary
Modification Implemented BSC Panel 11 Jan 2007 P209 Change of Code References from BSCP531 to BSCP537’ View summary Ofgem
Change Proposal Implemented Central Change Coordination 8 Dec 2006 CP1186 Changes to the Profile Administrator (PrA) Service Description View summary
Change Proposal Rejected ELEXON 8 Dec 2006 CP1185 Allowing a Reading to be Deemed where an Actual Reading is Unavailable on a Change of Standard Settlement Configuration View summary
Change Proposal Implemented Western Power Distribution 8 Dec 2006 CP1184 Disconnection of Energised Metering Systems View summary
Change Proposal Implemented ELEXON 8 Dec 2006 CP1183 Allowing a date to be deemed for a change in Energisation Status of a Half Hourly Meter View summary
Change Proposal Implemented ELEXON 8 Dec 2006 CP1182 Creation of a generic Party Service Line View summary
Issue Closed Npower 17 Nov 2006 Issue 026 Issues arising from ELEXON/ PAB interpretation
Issue Closed Npower 17 Nov 2006 Issue 025 Governance issues related to PAB determination
Change Proposal Implemented ELEXON 14 Nov 2006 CP1181 Removal of duplication between the SVA Data Catalogue and the DTC View summary
Modification Implemented BSC Panel 9 Nov 2006 P208 Housekeeping Modification View summary Ofgem
Change Proposal Implemented ELEXON 16 Oct 2006 CP1180 Confirmation of Metering status in the Non Half Hourly Market View summary
Modification Implemented energywatch 29 Sept 2006 P207 Introduction of a new governance regime to allow a risk based Performance Assurance Framework (PAF) to be utilised and reinforce the effectiveness of the current PAF View summary Ofgem
Change Proposal Implemented ELEXON 15 Sept 2006 CP1179 Instigation of a 'nil' P0028 100kW Demand Report View summary
Change Proposal Implemented ELEXON 15 Sept 2006 CP1178 Change to SP08 validation rules in PARMS View summary
Change Proposal Rejected ELEXON 15 Sept 2006 CP1177 Changes to the change of Profile Class process as set out in BSCP516 'Allocation of Profile Classes and SSCs for Non-Half Hourly SVA Metering Registered in SMRS' View summary
Change Proposal Implemented ELEXON 25 Aug 2006 CP1176 Additions to the February 2007 Release Housekeeping changes - removal of workflow diagrams from BSCPs View summary
Change Proposal Implemented ELEXON 24 Aug 2006 CP1175 Revision of BSCP 601 - Appendix 'Specification Compliance Testing Codes of Practice One, Two, Three and Five' View summary
Change Proposal Implemented ELEXON 4 Aug 2006 CP1174 Changes to BSCP601 and Compliance Test Specification View summary
Modification Implemented E.ON 3 Aug 2006 P206 Publication of BSC Panel Election Results View summary Ofgem
Modification Implemented Good Energy Ltd 4 Jul 2006 P205 Increase in PAR level from 100MWh to 500MWh View summary Ofgem
Change Proposal Implemented ELEXON 4 Jul 2006 CP1173 Proving Test Out of Timescale Escalation Report View summary
Modification Rejected British Energy 3 Jul 2006 P204 Scaled Zonal Transmission Losses View summary Ofgem
Modification Rejected RWE Npower 26 Jun 2006 P203 Introduction of a seasonal Zonal Transmission Losses scheme View summary Ofgem
Change Proposal Implemented ELEXON 26 Jun 2006 CP1172 Housekeeping CP for the February 2007 BSC Systems Release View summary
Change Proposal Rejected ELEXON 20 Jun 2006 CP1171 Improvements to the Proving Process View summary
Change Proposal Implemented Npower 20 Jun 2006 CP1170 Improving the BSC Change Process View summary
Issue Closed Gaz de France 20 Jun 2006 Issue 024 Impact of BSC Reactive Power Charging
Modification Rejected BizzEnergy 7 Jun 2006 P202 Energy Imbalance Incentive Band View summary Ofgem
Issue Closed Central Networks 7 Jun 2006 Issue 023 Apparent Tendency for EAC values to under-estimate consumption
Modification Rejected Utilita 26 May 2006 P201 Energy Imbalance Tolerance Band View summary Ofgem
Change Proposal Implemented ELEXON 26 May 2006 CP1169 Within Day Dis-application of Energy Contract Volume Notifications View summary
Change Proposal Implemented ELEXON 25 May 2006 CP1168 Deemed Readings following Change of Measurement Class View summary
Change Proposal Implemented ELEXON 25 May 2006 CP1167 Clarification of Section 1.2 of SVA SSL310 ‘Daily Profile Production’ View summary
Change Proposal Implemented ELEXON 17 May 2006 CP1166 Changes to allow use of inbound communications for CoP5 Metering View summary
Change Proposal Implemented ELEXON 16 May 2006 CP1165 Removal of the Requirement to Report Valid Excessive AA’s to Suppliers on a Daily Basis View summary
Modification Rejected Teesside Power Ltd 21 Apr 2006 P200 Introduction of a Zonal Transmission Losses scheme with Transitional Scheme View summary Ofgem
Change Proposal Implemented ELEXON 10 Apr 2006 CP1164 Improvements to BSCP27 identified during operational use with respect to Meter Technical Details and other supplementary information. View summary
Change Proposal Rejected ELEXON 10 Apr 2006 CP1163 Requesting Meter Technical Details during a change of Meter Operator Agent View summary
Change Proposal Implemented ELEXON 10 Apr 2006 CP1162 Sending revised Meter Technical Details during a change of Meter Operator Agent View summary
Change Proposal Implemented ELEXON 27 Mar 2006 CP1161 Housekeeping changes to the Communication Requirements Document View summary
Change Proposal Implemented ELEXON 27 Mar 2006 CP1160 Recommended changes following an operational review of the CVA Qualification requirements View summary
Change Proposal Implemented ELEXON 3 Feb 2006 CP1159 Confirmation of Metering status in the Half Hourly Market View summary
Modification Rejected National Grid 30 Jan 2006 P199 Quantification of Demand Control in the BSC as instructed under OC.6 (c),(d) & (e) of the Grid Code View summary Ofgem
Issue Closed SmartestEnergy 18 Jan 2006 Issue 022 Indebtedness
Change Proposal Implemented ELEXON 23 Dec 2005 CP1158 Inclusion of UMS Operational Data in MDD View summary
Change Proposal Implemented ELEXON 23 Dec 2005 CP1157 Initial Confirmation of D0265 Receipt View summary
Modification Rejected RWE Npower 16 Dec 2005 P198 Introduction of a Zonal Transmission Losses scheme View summary Ofgem
Modification Implemented Laing Energy Ltd 12 Dec 2005 P197 SVA Qualification Processes Review View summary Ofgem
Issue Closed BSC Panel 8 Dec 2005 Issue 021 Scope of Profile Administration
Modification Implemented E.ON 25 Nov 2005 P196 Treatment of Long Term Vacant Sites in Settlements View summary Ofgem
Change Proposal Implemented ELEXON 17 Nov 2005 CP1156 Remove PAA as a recipient of BSCP507/1 View summary
Change Proposal Implemented ELEXON 17 Nov 2005 CP1155 UMS-related Data Flows in the SVA Data Catalogue View summary
Change Proposal Implemented ELEXON 4 Nov 2005 CP1154 Amendment to form BSCP15/4.1 to facilitate registration of standard BM Units View summary
Change Proposal Implemented ELEXON 4 Nov 2005 CP1153 Changes to the Meter Advance Reconciliation Processes as detailed in BSCP05 View summary
Change Proposal Implemented ELEXON 2 Nov 2005 CP1152 Removal of requirement for the CDCA to Approved (Prop) work on CVA metering systems View summary
Issue Closed Gaz de France 26 Oct 2005 Issue 020 Fuel Security Code
Change Proposal Implemented ELEXON 25 Oct 2005 CP1151 Late Comment on Clarity of the P183 changes to BSCP504 Step 3.2.6.8 View summary
Change Proposal Implemented ELEXON 6 Oct 2005 CP1150 MDD Registration Principles View summary
Change Proposal Implemented ELEXON 6 Oct 2005 CP1149 NHHDA software does not support reporting to Suppliers of the changes resulting from an SMRS refresh View summary
Change Proposal Implemented ELEXON 6 Oct 2005 CP1148 Removing Section 4.6 ‘Standard File Format for Unmetered Supplies Detailed Inventories’ from BSCP520 View summary
Modification Rejected SSE 3 Oct 2005 P195 Neutrality for CCGT BMUs Switching Between Gas and Distillate View summary Ofgem
Issue Closed Centrica 21 Sept 2005 Issue 019 PARMS the way forward
Change Proposal Implemented ELEXON 12 Sept 2005 CP1147 Clarification of requirements for de-energised HH Metering Systems View summary
Change Proposal Implemented ELEXON 2 Sept 2005 CP1146 Clarification of timescales for SMRS Refreshes View summary
Modification Implemented National Grid 26 Aug 2005 P194 Revised Derivation of the 'Main' Energy Imbalance Price View summary Ofgem
Modification Implemented John Greasley 26 Aug 2005 P193 Improved Arrangements for Modification Proposals raised by the BSC Panel View summary Ofgem
Issue Closed Opus Energy 11 Aug 2005 Issue 018 Sleeper bids
Modification Implemented National Grid 27 Jul 2005 P192 Change of Name of the Transmission Company View summary Ofgem
Modification Implemented RWE Npower 25 Jul 2005 P191 Revised definition of Balancing Settlement Unit to include Power Park Module View summary Ofgem
Change Proposal Implemented ELEXON 20 Jul 2005 CP1145 Removal of particular requirements pertaining to register readings in the Half Hourly Market to improve Settlement efficiency (Part 3 of 3). View summary
Change Proposal Implemented ELEXON 20 Jul 2005 CP1144 Removal of particular requirements pertaining to register readings in the Half Hourly Market to improve Settlement efficiency (Part 2 of 3). View summary
Change Proposal Implemented ELEXON 20 Jul 2005 CP1143 Removal of particular requirements pertaining to register readings in the Half Hourly Market to improve Settlement efficiency (Part 1 of 3). View summary
Change Proposal Rejected ELEXON 12 Jul 2005 CP1142 Changes to the Proving Test Process View summary
Change Proposal Implemented ELEXON 30 Jun 2005 CP1141 Revision to Apportionment form F536/02 in BSCP536 View summary
Change Proposal Implemented ELEXON 27 Jun 2005 CP1140 Removal of ECVNs/MVRNs from ECVAA for a Party in Section H Default View summary
Change Proposal Implemented ELEXON 22 Jun 2005 CP1139 Housekeeping CP for SVA November 05 View summary
Change Proposal Implemented ELEXON 10 Jun 2005 CP1138 The Identification and Labelling of Meter Registers View summary
Change Proposal Rejected ELEXON 3 Jun 2005 CP1137 NHHDA Browse Activity Statuses access View summary
Modification Implemented RWE Npower 2 Jun 2005 P190 Removal of the obligation on the CDCA to provide a witnessing and sealing service in respect of all Metering Equipment associated with CVA Metering systems View summary Ofgem
Modification Implemented EDF Energy 23 May 2005 P189 Clarification to fulfil the intent of P174 View summary Ofgem
Change Proposal Rejected ELEXON 20 May 2005 CP1136 Extension of related common MTCs View summary
Change Proposal Implemented ELEXON 18 May 2005 CP1135 Inclusion of Erroneously Large EAC and AA Reporting Tool into the NHHDA software View summary
Change Proposal Implemented ELEXON 13 May 2005 CP1134 Clarification of Meter Reading History (D0010/D0152) Interface on Change of Supplier View summary
Change Proposal Implemented ELEXON 13 May 2005 CP1133 Additional Mechanism for New NHHDC to Obtain Meter Reading History on Change of Supplier View summary
Change Proposal Implemented ELEXON 12 May 2005 CP1132 Minor enhancements to the P176 detailed solution View summary
Change Proposal Implemented ELEXON 10 May 2005 CP1131 Changes to FAA Documentation arising from an internal audit by the Service Provider View summary
Change Proposal Implemented ELEXON 10 May 2005 CP1130 Inconsistency between BSCP507 and BSCP38 with regards to Authorised Signatures View summary
Change Proposal Implemented ELEXON 10 May 2005 CP1129 Clarification of process for Parties to re-initiate BSCP38 process. View summary
Change Proposal Implemented ELEXON 10 May 2005 CP1128 Changes to BSCP301, ‘Clearing, Invoicing and Payment’ View summary
Issue Closed National Grid 4 May 2005 Issue 017 Review of Electricity Market information
Modification Implemented British Gas 3 May 2005 P188 Revisions to Credit Default Positions View summary Ofgem
Change Proposal Implemented ELEXON 26 Apr 2005 CP1127 Inconsistencies within the SVA Data Catalogue View summary
Change Proposal Implemented ELEXON 26 Apr 2005 CP1126 Clarification of the term “Significant Date” in the Non Half Hourly Instruction Processing Specification View summary
Issue Closed British Gas Trading 20 Apr 2005 Issue 016 Credit Default and the Default provisions in Section H of the BSC
Issue Closed EDF Energy 19 Apr 2005 Issue 015 Review of Trading Query Deadlines
Change Proposal Implemented ELEXON 8 Apr 2005 CP1125 Submission of the D0028 ‘Standing Profile Data Report’ over the Data Transfer Network View summary
Change Proposal Implemented ELEXON 8 Apr 2005 CP1124 Use of alternate methods of validation during the Non-Half Hourly Change of Supplier Process View summary
Change Proposal Implemented ELEXON 8 Apr 2005 CP1123 Use of Early Readings during the Non-Half Hourly Change of Supplier Process View summary
Change Proposal Implemented ELEXON 8 Apr 2005 CP1122 Inclusion of the Backstop Process as part of the Change of Supplier Process into Code Subsidiary Documents View summary
Change Proposal Implemented ELEXON 6 Apr 2005 CP1121 Defect in NHH Aggregation Rules in NHHDA Logical Design View summary
Modification Implemented British Gas 4 Apr 2005 P187 Introducing the ability for a BSC Party to request urgent status and for it to be considered by the Authority View summary Ofgem
Issue Closed Powergen 4 Apr 2005 Issue 014 Vacant sites and ‘Shut Down’ meters
Change Proposal Implemented ELEXON 23 Mar 2005 CP1120 Amendment of the Trading Query Deadline for SVA Half Hourly Trading Queries View summary
Change Proposal Implemented ELEXON 23 Mar 2005 CP1119 Amendment of BSCP11, ‘Trading Queries and Trading Disputes’, to address the treatment of “precautionary” Trading Queries which could potentially be resolved outside the Trading Query process prior to Final Reconciliation. View summary
Change Proposal Implemented ELEXON 23 Mar 2005 CP1118 Clarification of the Trading Query end-date View summary
Change Proposal Rejected ELEXON 18 Mar 2005 CP1115 Authorisation View when using the P98 Web Reporting Service View summary
Change Proposal Rejected ELEXON 18 Mar 2005 CP1114 Ability to Cut and Paste using the P98 Web Reporting Service View summary
Change Proposal Rejected ELEXON 18 Mar 2005 CP1113 Acknowledgement when using the P98 Web Reporting Service View summary
Change Proposal Implemented ELEXON 14 Mar 2005 CP1117 Upgrade of NHHDA and EAC/AA systems to Oracle 10g. View summary
Change Proposal Implemented ELEXON 14 Mar 2005 CP1116 Upgrade of SVA System and SVA Agent Applications to Oracle 10g View summary
Change Proposal Implemented ELEXON 8 Mar 2005 CP1112 Changes to BSCP32 following operational review. View summary
Change Proposal Withdrawn ELEXON 8 Mar 2005 CP1111 GSPGCF Relocation View summary
Change Proposal Rejected ELEXON 2 Mar 2005 CP1110 Amendments to PARMS Response Files View summary
Change Proposal Implemented ELEXON 22 Feb 2005 CP1109 Changes to Forms in BSCP38 ‘Authorisations’ to allow multiple Authorisation Applications View summary
Change Proposal Implemented ELEXON 10 Feb 2005 CP1108 Simplification of Change of BM Unit Ownership (CoBO) Process for CVA BM Units View summary
Modification Implemented Npower 28 Jan 2005 P186 Rationalising the criteria for the submission and declaration of Demand & Generation Capacities View summary Ofgem
Change Proposal Implemented ELEXON 28 Jan 2005 CP1107 Timescale change to the 100kW notification from Non-Half Hourly Data Collectors. View summary
Change Proposal Implemented ELEXON 28 Jan 2005 CP1106 Change to BSCP514 bring it in line with a requirement in BSCP504 View summary
Change Proposal Implemented ELEXON 24 Jan 2005 CP1105 Prepayment Flows relating to Settlement – Changes to Code Subsidiary Documents View summary
Change Proposal Implemented ELEXON 17 Jan 2005 CP1104 BSCP520 is Inconsistent with Current Practice for Registration of Unmetered Supplies in the North Scotland GSP Group View summary
Change Proposal Implemented ELEXON 17 Jan 2005 CP1103 Changes and clarifications to BSCP 533, 534 and 536 arising from the implementation of Phases 3 and 4 of PARMS. View summary
Change Proposal Implemented ELEXON 17 Jan 2005 CP1102 Sending of the D0052 by Unmetered Supplies Operators View summary
Modification Implemented BSC Panel 14 Jan 2005 P185 Redrafting of BSC Sections U and W in relation to clauses pertaining to the processing and rectification of Trading Queries/Disputes View summary Ofgem
Modification Implemented BSC Panel 14 Jan 2005 P184 Clarification of BSC Section W in relation to the application of the Query Deadline to Trading Queries/Disputes. View summary Ofgem
Modification Implemented Npower 21 Dec 2004 P183 Additional Mechanisms for Obtaining a valid Change of Supplier Read View summary Ofgem
Change Proposal Rejected ELEXON 7 Dec 2004 CP1101 Allowing the use of IF Statements - CVA Metering Systems View summary
Change Proposal Implemented ELEXON 2 Dec 2004 CP1100 Removal of generic Metering Dispensations from Codes of Practice 3 and 5. View summary
Change Proposal Implemented ELEXON 30 Nov 2004 CP1099 Change to the Requirements for Meter Type Compliance and Protocol Approval View summary
Change Proposal Implemented ELEXON 30 Nov 2004 CP1098 Removal of ‘Pool Requirements of the DTS Network’ from Baseline Statement View summary
Issue Closed Gaz de France 22 Nov 2004 Issue 013 Codes of Practice applicable to Metering Systems
Modification Implemented Economy Power Ltd 16 Nov 2004 P181 NGC Emergency Instruction re Damhead Creek 19.5.04: Deferral of Settlement Process View summary Ofgem
Change Proposal Implemented ELEXON 4 Nov 2004 CP1097 Changes to validate format of SSC Id and TPR Id View summary
Change Proposal Rejected ELEXON 3 Nov 2004 CP1096 Confirmation of Energisation and Metering status View summary
Modification Rejected Centrica 2 Nov 2004 P182 Review and redefinition of the Non Half Hourly Settlement performance measures View summary Ofgem
Modification Implemented National Grid Transco 1 Nov 2004 P180 Revision to BSC Modification implementation dates, where an Authority decision is referred to Appeal or Judicial Review View summary Ofgem
Change Proposal Implemented ELEXON 1 Nov 2004 CP1095 Provision of the Complex Site Supplementary Information Form for Complex SVA Metering View summary
Change Proposal Rejected ELEXON 26 Oct 2004 CP1094 Change to BSCP503 to include HH flow to Supplier View summary
Change Proposal Implemented ELEXON 26 Oct 2004 CP1093 Failure of Suppliers to Submit Valid Standing Data Relationships View summary
Modification Implemented BSC Panel 15 Oct 2004 P179 Housekeeping Modification View summary Ofgem
Change Proposal Withdrawn 11 Oct 2004 CP1092 Untraded Report Obligations View summary
Change Proposal Implemented ELEXON 8 Oct 2004 CP1091 Housekeeping Changes to Settlement Documentation View summary
Change Proposal Implemented ELEXON 5 Oct 2004 CP1090 Provision of Actual Energy values on a Settlement Day basis for PARMS View summary
Change Proposal Implemented ELEXON 5 Oct 2004 CP1089 Inappropriate “dual reporting” of E03/E04 exceptions on the NHHDA Exception Report (D0095) View summary
Modification Rejected Uskmouth Power Company Ltd 4 Oct 2004 P178 Reduction in the BSC withdrawal timescale for parties who have settled the vast majority of their trading debts View summary Ofgem
Modification Implemented National Grid 4 Oct 2004 P177 Removal of Intertrip provisions from the BSC View summary Ofgem
Modification Implemented Npower 4 Oct 2004 P176 Clarification of the Requirements for Estimation/Deeming of Meter Readings/Advances in Certain Circumstances to Facilitate Correction of Anomalies in Settlement Consumption View summary Ofgem
Modification Rejected RWE Npower 1 Oct 2004 P175 Development of provisions related to certain bid offer acceptances issued pursuant to the Grid Code (e.g. BC2.9 and BC2.10). View summary Ofgem
Change Proposal Implemented ELEXON 28 Sept 2004 CP1088 Inclusion of PARMS Response files in BSCP533 Appendix View summary
Issue Closed Uskmouth Power Company Limited 21 Sept 2004 Issue 012 Timescales for Withdrawal from the BSC
Change Proposal Implemented ELEXON 13 Sept 2004 CP1087 Consolidation of PARMS Report Details View summary
Change Proposal Withdrawn ELEXON 6 Sept 2004 CP1086 Change HHDC requirements following Failed Proving Test View summary
Change Proposal Implemented ELEXON 6 Sept 2004 CP1085 Inclusion of ‘underpin’ process in PSL120 ‘Non Half Hourly Data Collection’ View summary
Issue Closed Centrica 2 Sept 2004 Issue 011 Performance targets and Monitoring
Change Proposal Implemented ELEXON 1 Sept 2004 CP1084 Amendments to delivery of Peer Comparison Reports View summary
Modification Implemented EDF Energy 27 Aug 2004 P174 Provision for Users of an Interconnector with a Single Boundary Point connection to form a Trading Unit amongst themselves and with other BM Units at the same site’ View summary Ofgem
Modification Rejected National Grid 25 Aug 2004 P173 Revised Settlement Arrangements for Emergency Instructions View summary Ofgem
Modification Implemented British Gas 25 Aug 2004 P172 Removal of Emergency Instructions taken for System reasons from Imbalance Price View summary Ofgem
Modification Rejected British Gas 25 Aug 2004 P171 Retrospective removal of Emergency Instructions taken for System reasons from Imbalance Price View summary Ofgem
Change Proposal Implemented ELEXON 24 Aug 2004 CP1083 Removal of Unmetered Supplies operational details from BSCP520 ‘Unmetered Supplies’ View summary
Change Proposal Implemented ELEXON 24 Aug 2004 CP1082 Replace reference to ‘EASL’ with ‘Teleswitch Agent’ in the SVA Data Catalogue View summary
Change Proposal Implemented ELEXON 24 Aug 2004 CP1081 EAC/AA Changes to Allow Manual Initiation of a Deemed Meter Advance Calculation View summary
Issue Closed NGT 24 Aug 2004 Issue 010 Implementation Dates
Change Proposal Implemented ELEXON 23 Aug 2004 CP1080 Enhancing Supplier and LDSO controls on Unmetered Supplies View summary
Change Proposal Implemented ELEXON 23 Aug 2004 CP1079 Clarification of NHHDC obligations regarding UMSO-provided EACs View summary
Change Proposal Implemented ELEXON 19 Aug 2004 CP1078 Application of VAT to Trading Charges. View summary
Modification Implemented BSC Panel 12 Aug 2004 P170 Amendments to the Balancing and Settlement Code (Code), and to the systems and processes that support it, to allow compliance with the changed application of VAT to Trading Charges View summary Ofgem
Change Proposal Implemented ELEXON 10 Aug 2004 CP1077 Review of BSCP 40 Emergency Fix Procedure View summary
Change Proposal Implemented ELEXON 10 Aug 2004 CP1076 Incorporation of the content of BSCP76 into BSCP40 View summary
Change Proposal Implemented ELEXON 10 Aug 2004 CP1075 clarification of the different types of Stakeholder Input into the change management process View summary
Change Proposal Implemented ELEXON 10 Aug 2004 CP1074 Providing Greater structure and Certainty to the progression of Change Proposals View summary
Change Proposal Implemented ELEXON 10 Aug 2004 CP1073 Introduction of a Housekeeping Process into BSCP40 View summary
Change Proposal Implemented ELEXON 10 Aug 2004 CP1072 Optimum Process for Inclusion and Distribution of Data Estimation Method in D0022 Flow View summary
Change Proposal Rejected ELEXON 10 Aug 2004 CP1071 Amendment of SVAA and PARMS decimal place issue View summary
Change Proposal Rejected ELEXON 10 Aug 2004 CP1070 Changes to CSDs for correct usage of D0002 Flow View summary
Modification Implemented Smartest Energy 27 Jul 2004 P169 Publication of BMU names on ELEXON website View summary Ofgem
Modification Rejected Smartest Energy 27 Jul 2004 P168 Publication of BMU GC and DC values on ELEXON website View summary Ofgem
Issue Closed Bizz Energy 21 Jul 2004 Issue 009 Review of aspects of the Modification Process
Change Proposal Implemented E.ON 19 Jul 2004 CP1069 Qualifying the Right of BSC Agents to Raise Change Proposals View summary
Change Proposal Implemented ELEXON 13 Jul 2004 CP1068 Change to the process where the HHDC reports that no Proving Test has been initiated View summary
Change Proposal Implemented ELEXON 13 Jul 2004 CP1067 Amendments to BSCP601 following operational review. View summary
Change Proposal Implemented ELEXON 13 Jul 2004 CP1066 Changes to SVAA Service Lines as part of the SVAO Re-procurement View summary
Change Proposal Implemented ELEXON 9 Jul 2004 CP1065 Amendments to Code of Practice 8 View summary
Modification Rejected British Gas 28 Jun 2004 P167 Erroneous Calculation of Bid Offer Acceptance (BOA) Volume View summary Ofgem
Change Proposal Implemented ELEXON 28 Jun 2004 CP1064 Flows to be sent on a Non-Half Hourly change of Energisation Status View summary
Issue Closed Npower 22 Jun 2004 Issue 008 Apparent Inconsistency between requirements for rectifying NHH Meter reading history anomalies and the BSC
Change Proposal Rejected ELEXON 21 Jun 2004 CP1063 Changes to the Investigate Inconsistencies processes in BSCP502, BSCP504 and BSCP514 View summary
Change Proposal Implemented ELEXON 21 Jun 2004 CP1062 Clarification of the use of Defined Terms within BSCP 27 View summary
Change Proposal Implemented ELEXON 17 Jun 2004 CP1061 Rationalisation of Interface Documents View summary
Change Proposal Implemented ELEXON 8 Jun 2004 CP1060 Providing the Registrant with visibility of their Line Loss Factors (LLF) prior to approval View summary
Change Proposal Withdrawn ELEXON 8 Jun 2004 CP1059 Upgrade of NHHDA and EAC/AA under Oracle Forms 9i View summary
Change Proposal Implemented ELEXON 7 Jun 2004 CP1058 Update to Profile Administrator Service Description to describe correctly the process for splitting Base and Switched Load View summary
Change Proposal Implemented ELEXON 24 May 2004 CP1057 Request for Additional Market Indicator Data View summary
Change Proposal Implemented ELEXON 24 May 2004 CP1056 Inclusion of an additional Authorisation Category for Entry Processes View summary
Change Proposal Implemented ELEXON 13 May 2004 CP1055 Withdrawal of BSCP506 ‘Calculation and Population of Initial EACs for Non-Half Hourly Metering Systems Registered in SMRS’ View summary
Change Proposal Implemented ELEXON 21 Apr 2004 CP1054 Inaccurate Interface Timetables in BSCP06 3.1 and 3.2 View summary
Change Proposal Withdrawn 20 Apr 2004 CP1053 Upgrade of the SVAA software application for forms 9i View summary
Change Proposal Implemented ELEXON 20 Apr 2004 CP1052 Upgrade of NHHDA and EAC/AA software applications to operate under UNIX 5.1B View summary
Change Proposal Implemented ELEXON 14 Apr 2004 CP1051 Review of Metering Code of Practice 2 View summary
Issue Closed British Gas Trading 14 Apr 2004 Issue 007 Potential anomaly in respect of Bid Offer Acceptance (BOA) volume
Change Proposal Withdrawn 8 Apr 2004 CP1050 CDCA MAR Discrepancy Values View summary
Change Proposal Implemented ELEXON 8 Apr 2004 CP1049 BSCP to enable the obligations on a LDSO and TSO View summary
Change Proposal Implemented ELEXON 5 Apr 2004 CP1048 Requirement to request Metering System history via the D0170 upon a Change of HHDC View summary
Modification Implemented BizzEnergy 26 Mar 2004 P166 Removal of unintentional effects of P123 to allow Supplier BM unit DC values to be revised downwards during a BSC Season View summary Ofgem
Change Proposal Implemented ELEXON 16 Mar 2004 CP1047 Warning message to highlight when no GSP Groups are selected for a Non Half-Hourly Data Aggregation run. View summary
Change Proposal Implemented ELEXON 10 Mar 2004 CP1046 Inconsistency between the BSC and BSCP535 View summary
Change Proposal Implemented ELEXON 8 Mar 2004 CP1045 Data requirement for sending Meter System history on request via the D0170 ‘Request for Metering System Related Details’ upon a Change of Half Hour Data Collector (HHDC) View summary
Change Proposal Implemented ELEXON 8 Mar 2004 CP1044 Clarification of data requirements in the transfer of Metering System Related Details during a Change of Half Hourly Data Collector (HHDC) process View summary
Change Proposal Implemented ELEXON 8 Mar 2004 CP1043 Reporting Meter Advance Reconciliation (MAR) overdue status by Half Hour Data Collectors (HHDCs) in their monthly reporting View summary
Change Proposal Implemented ELEXON 8 Mar 2004 CP1042 Clarification on the Meter Advance Reconciliation tolerance calculation View summary
Change Proposal Implemented ELEXON 1 Mar 2004 CP1041 Additional Changes to BSCP509 ‘Changes to Market Domain Data’ following implementation of the Operational Review View summary
Modification Implemented BSC Panel 23 Feb 2004 P165 Housekeeping Modification - Removal of Approved Modification P125 View summary Ofgem
Change Proposal Implemented ELEXON 16 Feb 2004 CP1040 Improvements to BSCP31 View summary
Modification Implemented BSC Panel 12 Feb 2004 P164 Housekeeping Modification View summary Ofgem
Modification Rejected RWE Innogy 2 Feb 2004 P163 Clarification of the circumstances in which paragraph 6.5 of Section P (calculation of Error Correction Payment) should apply View summary Ofgem
Change Proposal Implemented ELEXON 2 Feb 2004 CP1039 Use of D0052 flow on change of Supplier and change of NHHDC View summary
Change Proposal Rejected ELEXON 2 Feb 2004 CP1038 Optional Data Items in D0052 Flow View summary
Change Proposal Implemented ELEXON 2 Feb 2004 CP1037 Timing and Validation of D0052 flow View summary
Change Proposal Implemented ELEXON 2 Feb 2004 CP1036 Rejectedion Flow for D0052 View summary
Change Proposal Withdrawn ELEXON 2 Feb 2004 CP1035 Consumption not 'E' flagged following proving test failure View summary
Change Proposal Implemented ELEXON 2 Feb 2004 CP1034 Timing of D0170 data request flows View summary
Change Proposal Implemented ELEXON 2 Feb 2004 CP1033 Discrepancy between D0269 and D0270 flows View summary
Modification Implemented SSE 30 Jan 2004 P162 Changes to the definition of Imports and Exports View summary Ofgem
Modification Implemented EDF Energy 29 Jan 2004 P160 Removal of the Anomalous Effect of the Error Correction Payment (ECP) for Multiple Claims Affecting the same Settlement Period and Energy Account View summary Ofgem
Modification Implemented BSC Panel 28 Jan 2004 P159 Extending the scope of e-mail communications under the Code View summary Ofgem
Modification Rejected British Gas 27 Jan 2004 P158 Introducing the ability to lodge a consolidated Letter of Credit (LoC) View summary Ofgem
Modification Rejected National Grid 20 Jan 2004 P161 Enhancement of BSCCo Board Structure View summary Ofgem
Change Proposal Implemented ELEXON 20 Jan 2004 CP1032 Review, revision and clarification of BSCP11 “Volume Allocation and Settlement Run Queries” View summary
Modification Rejected EDF Energy 5 Jan 2004 P157 Replacement of current Supplier Charges rules View summary Ofgem
Change Proposal Rejected ELEXON 5 Jan 2004 CP1031 Entry Process Testing - Clarification for Party Agents View summary
Change Proposal Implemented ELEXON 5 Jan 2004 CP1030 Publishing of the details of Suppliers who meet criteria View summary
Change Proposal Implemented ELEXON 22 Dec 2003 CP1029 Enhancement to BPM to allow references View summary
Change Proposal Withdrawn ELEXON 22 Dec 2003 CP1028 Withdrawal of Supplier Hubs View summary
Modification Rejected Scottish Power 19 Dec 2003 P156 Suspending the implementation of the zonal allocation of transmission losses View summary Ofgem
Change Proposal Implemented ELEXON 3 Dec 2003 CP1027 Revision to registration period for Metering Systems View summary
Modification Withdrawn RWE Innogy 1 Dec 2003 P155 Appeal Mechanism for Panel and Panel Committee Decisions View summary Ofgem
Modification Implemented Npower 1 Dec 2003 P154 Rectification of Inconsistencies in the Application of BSC Change Management Processes View summary Ofgem
Modification Rejected Npower 1 Dec 2003 P153 Additional Requirements to Support Competition in New and ‘Out-of-Area’ Distribution Networks View summary Ofgem
Modification Implemented PricewaterhouseCoopers (acting as administrative receivers of Shotton Combined Heat and Power Limited) 1 Dec 2003 P152 Reduction of Credit Cover for a Trading Party in Default which has ceased trading and which has paid all accrued Trading Charges View summary Ofgem
Modification Implemented BSC Panel 28 Nov 2003 P151 Housekeeping Modification View summary Ofgem
Modification Withdrawn Powergen 27 Nov 2003 P149 Delay to the invoicing of the Past Notification Error (PNE) claims fee View summary Ofgem
Modification Withdrawn Powergen 27 Nov 2003 P148 Revision of the claims fee to avoid undue discrimination between classes of Party in their funding of the PNE claims process View summary Ofgem
Change Proposal Withdrawn ELEXON 26 Nov 2003 CP1026 Procedures to support transfer of Metering System ownership between Distribution Businesses View summary
Modification Rejected Powergen 25 Nov 2003 P150 Targeting excess costs of PNE appeals process at unsuccessful appellants View summary Ofgem
Change Proposal Implemented ELEXON 24 Nov 2003 CP1025 Clarification and correction of existing process within BSCP514 View summary
Modification Rejected Npower 19 Nov 2003 P147 Introduction of a Notified Contract Capacity to limit Party liability in event of erroneous contract notifications View summary Ofgem
Change Proposal Implemented ELEXON 12 Nov 2003 CP1024 Amendment to BSCP11 Volume Allocation And Settlement Run Queries View summary
Change Proposal Withdrawn ELEXON 10 Nov 2003 CP1023 Inconsistent use of terminology in the TAA SD View summary
Modification Rejected OM London Exchange Ltd 3 Nov 2003 P146 New Participation Category to the BSC – Clearing House View summary Ofgem
Change Proposal Implemented ELEXON 27 Oct 2003 CP1021 Allocation of Metering Systems to the "Economy 7 Profile Classes" View summary
Change Proposal Implemented ELEXON 27 Oct 2003 CP1020 Clarification of Pre Payment Meter reading obligations View summary
Change Proposal Implemented ELEXON 27 Oct 2003 CP1019 Clarification of Pre-Payment Meter reading Obligations – De-energised View summary
Change Proposal Withdrawn ELEXON 24 Oct 2003 CP1018 Correction of formatting in BSCP76 View summary
Change Proposal Withdrawn ELEXON 21 Oct 2003 CP1017 SAA and SVAA Settlement Calendars View summary
Change Proposal Implemented ELEXON 21 Oct 2003 CP1016 Monthly D0095 reports from NHHDA software for P99 PARMS Reporting View summary
Change Proposal Implemented ELEXON 21 Oct 2003 CP1015 BSCP15 Review View summary
Change Proposal Withdrawn ELEXON 21 Oct 2003 CP1014 NHHDA E03/E04 Exceptions View summary
Change Proposal Withdrawn ELEXON 21 Oct 2003 CP1013 Should a NHHDA E14, or E08, CDCD exception be raised View summary
Change Proposal Withdrawn ELEXON 21 Oct 2003 CP1012 Multiple NHHDA CDCD exceptions being reported to DC's View summary
Modification Rejected Powergen 17 Oct 2003 P145 Cost reflective mechanism to allocate any deficit arising from the application of the PNE claims fee View summary Ofgem
Modification Rejected First Hydro Company 10 Oct 2003 P144 Removal of CADL from the BSC View summary Ofgem
Change Proposal Withdrawn ELEXON 5 Oct 2003 CP1022 SSC changed without recalculation of EAC by NHHDC View summary
Change Proposal Implemented ELEXON 2 Oct 2003 CP1011 Correction of Price Derivation Codes View summary
Change Proposal Implemented ELEXON 2 Oct 2003 CP1010 Incorrect footnote reference in section 3.3.10.2 of BSCP504 ‘Non Half Hourly Data Collection for SVA Metering Systems Registered in SMRS’ View summary
Change Proposal Implemented ELEXON 30 Sept 2003 CP1009 ECVAA Processing of Authorisation Requests View summary
Change Proposal Implemented ELEXON 19 Sept 2003 CP1008 Removal of obligation to raise ARs in BSCP40 View summary
Change Proposal Implemented ELEXON 18 Sept 2003 CP1007 Revisions to Entry Process Requirements post P62 View summary
Change Proposal Implemented ELEXON 9 Sept 2003 CP1006 Revised NHHDA archiving system parameters default val View summary
Change Proposal Implemented ELEXON 9 Sept 2003 CP1005 SVA Data Catalogue Volume 2: ‘MTC Common Code Indicator’ Data Item Valid Set Description Correction View summary
Change Proposal Implemented ELEXON 9 Sept 2003 CP1004 SVA Data Catalogues: Minor Corrections to the ‘Related Documents’ sections View summary
Change Proposal Implemented ELEXON 9 Sept 2003 CP1003 SVA Data Catalogue: Correction of the “Host LDSO Name” Data Item Description View summary
Change Proposal Implemented ELEXON 8 Sept 2003 CP1002 Change to BSCP40 to allow Energywatch to raise CPs View summary
Change Proposal Implemented ELEXON 3 Sept 2003 CP1001 Improvements to Non Half Hourly Data Aggregation (NHHDA) Software application in order to facilitate reporting and improve usability View summary
Modification Rejected Centrica 1 Sept 2003 P143 Revision of P99 to halt the progression of the PARMS Serials, Standards and Supplier Charge elements View summary Ofgem
Modification Implemented TotalFinaElf Gas and Power Ltd 29 Aug 2003 P142 Minor refinement to allow a Level 2 Default Cure period in defined circumstances View summary Ofgem
Modification Implemented EDF Energy 28 Aug 2003 P141 Removal of Unintentional Effects of Approved Modification P106 on Supplier Charges View summary Ofgem
Modification Implemented EDF Energy 21 Aug 2003 P140 Revised Credit Cover Methodology for Interconnector BM Units View summary Ofgem
Modification Rejected EDF Energy 21 Aug 2003 P139 Removal of Trading Unit Restriction on Interconnector Users View summary Ofgem
Change Proposal Implemented ELEXON 21 Aug 2003 CP0999 Upgrade of the SVA software application to operate under UNIX 5.1B View summary
Change Proposal Withdrawn ELEXON 19 Aug 2003 CP1000 Removal of BSCP20/4.5 and amendment of BSCP02/4.4. View summary
Modification Rejected Innogy plc 8 Aug 2003 P138 Contingency arrangements in relation to implementation of Demand Control measures pursuant to Grid Code OC6 View summary Ofgem
Issue Closed Powergen 8 Aug 2003 Issue 005 Treatment of Parties going directly into level 2 Credit Default
Issue Closed Energywatch 6 Aug 2003 Issue 006 Appropriateness of the current Supplier Charging Mechanism
Change Proposal Implemented ELEXON 5 Aug 2003 CP0998 Merge BSCP026 and BSCP526 to create new TA BSCP View summary
Change Proposal Rejected ELEXON 4 Aug 2003 CP0997 Inconsistencies between the CRA, URS and BSCPs View summary
Modification Rejected Barclays Bank Plc 1 Aug 2003 P137 Revised Calculation of System Buy Price and System Sell Price View summary Ofgem
Modification Rejected National Grid 1 Aug 2003 P136 Marginal Definition of the 'main' Energy Imbalance Price View summary Ofgem
Modification Rejected National Grid 1 Aug 2003 P135 Marginal System Buy Price During Periods of Demand Reduction View summary Ofgem
Change Proposal Withdrawn ELEXON 1 Aug 2003 CP0996 Amendment to BSCP06 View summary
Change Proposal Rejected ELEXON 29 Jul 2003 CP0994 Improvements to the BMRS Help Screens View summary
Change Proposal Implemented ELEXON 28 Jul 2003 CP0995 Replacement for Workaround W018 View summary
Change Proposal Implemented ELEXON 25 Jul 2003 CP0993 Removal of business and working day definitions View summary
Change Proposal Implemented ELEXON 24 Jul 2003 CP0992 Provision of Site Technical Details by the Distribution Business to the Meter Operator Agent on a Change of Measurement Class View summary
Change Proposal Implemented Cap Gemini 24 Jul 2003 CP0991 MDD Error - MTC LLFC SSC Combinations Screen View summary
Change Proposal Implemented ELEXON 23 Jul 2003 CP0990 Rectification of EAC/AA Calculator Issues View summary
Change Proposal Implemented National Grid 23 Jul 2003 CP0989 Revision to BSCP14 to bring it in line with the BSC. View summary
Change Proposal Implemented ELEXON 22 Jul 2003 CP0988 Performing Data Estimations Post SF Run View summary
Change Proposal Withdrawn ELEXON 22 Jul 2003 CP0987 ECVAA URS - Amend Timescales View summary
Issue Closed BSC Panel 22 Jul 2003 Issue 004 Periodic reviews of the BSC
Change Proposal Implemented ELEXON 21 Jul 2003 CP0986 Amendments to BSCP38 View summary
Change Proposal Withdrawn ELEXON 18 Jul 2003 CP0985 Obligation on LDSO View summary
Change Proposal Implemented ELEXON 15 Jul 2003 CP0984 Addition of Processes in BSCP515 to update the National Measurement Transformer Error Statement View summary
Change Proposal Implemented Scottish and Southern Energy 14 Jul 2003 CP0983 Inclusion of new Approved (Prop)d meter types BSCP601 View summary
Change Proposal Implemented ELEXON 11 Jul 2003 CP0982 Inconsistency within BSCP502 ‘Half Hourly Data Collection for SVA Metering Systems Registered in SMRS View summary
Change Proposal Implemented ELEXON 11 Jul 2003 CP0981 Consistency change with MRA relating to timescale for Supplier registration in Supplier Meter Registration Service View summary
Change Proposal Withdrawn ELEXON 7 Jul 2003 CP0980 Use of Sub-kWh Values in Meter Register Readings View summary
Change Proposal Implemented ELEXON 7 Jul 2003 CP0979 Addition of the Pilot Metercom View summary
Change Proposal Rejected ELEXON 4 Jul 2003 CP0978 Security access meter passwords View summary
Change Proposal Implemented N/A 2 Jul 2003 CP0977 Upgrade of NHHDA and EAC/AA software applications to Oracle 9i View summary
Change Proposal Implemented British Gas Trading 2 Jul 2003 CP0976 BMRS System Updates View summary
Change Proposal Implemented ELEXON 2 Jul 2003 CP0975 Removal of 'Permit Notification Rejectedion Flag' references View summary
Modification Rejected British Energy 30 Jun 2003 P134 The Halting Of Unnecessary And Inefficient Work And Expenditure Associated With Approved BSC Modification P82. View summary Ofgem
Modification Implemented BSC Panel 30 Jun 2003 P133 Facility to permit BSCCo to undertake the role of the Profile Administrator View summary Ofgem
Modification Implemented BSC Panel 23 Jun 2003 P131 Introduction of further provisions relating to the determination of Trading Disputes View summary Ofgem
Change Proposal Implemented ELEXON 23 Jun 2003 CP0974 Full review of BSCP65 View summary
Change Proposal Rejected ELEXON 23 Jun 2003 CP0973 Extension of Parameters of Party Name field View summary
Change Proposal Superseded ELEXON 23 Jun 2003 CP0972 Review of BSCP71 View summary
Modification Rejected TXU Direct Sales Ltd 19 Jun 2003 P132 Redefinition of Credit Cover Requirements to account for Reconciliation Charges View summary Ofgem
Change Proposal Implemented ELEXON 18 Jun 2003 CP0971 Removal of BSCP07 View summary
Change Proposal Implemented Mandi Francis, Trading Arrangements Design 18 Jun 2003 CP0970 Amendment to BSCP31 to remove reference to the P&SA View summary
Change Proposal Implemented ELEXON 11 Jun 2003 CP0969 Change to the SVA Data Catalogue to state that all relevant fields within data flows should be completed. View summary
Change Proposal Rejected ELEXON 10 Jun 2003 CP0968 Addition of an 'Event Indicator' to the D0155 View summary
Change Proposal Rejected ELEXON 10 Jun 2003 CP0967 Addition of an 'Event Indicator' to the D0149 and D0150 View summary
Change Proposal Withdrawn ELEXON 6 Jun 2003 CP0966 D0235 Exception reporting - BSCP503, section 4.3 View summary
Change Proposal Implemented Centrica Business Services 5 Jun 2003 CP0965 Superfluous reporting of D0095 exceptions combined with an E01 exception following a CoS View summary
Change Proposal Implemented ELEXON 4 Jun 2003 CP0964 Inclusion of BSCP06 form for CDCA-I038 flows View summary
Change Proposal Rejected ELEXON 4 Jun 2003 CP0963 Provision of Facility in ECVAA for Defaulting BSC Party View summary
Change Proposal Implemented ELEXON 3 Jun 2003 CP0962 Amend Registration Reports to include BM Unit Info View summary
Modification Implemented TXU Direct Sales Ltd 2 Jun 2003 P130 Clarification of the treatment of Non Half Hourly Export Consumption within PARMS performance Serial 1 View summary Ofgem
Change Proposal Implemented ELEXON 28 May 2003 CP0961 New validation rules for the MDD application View summary
Change Proposal Withdrawn SAIC Ltd on behalf of ScottishPower and Manweb 22 May 2003 CP0960 NHHDC Validation on Reading Dates View summary
Change Proposal Implemented UKPX 21 May 2003 CP0959 UKPX MIDP 2 Hour Blocks View summary
Change Proposal Implemented ELEXON 14 May 2003 CP0958 Enhancements to BSCP28 View summary
Modification Rejected Powergen 7 May 2003 P129 Changes to Panel Determination Process and Panel Election Procedures View summary Ofgem
Change Proposal Withdrawn ELEXON 7 May 2003 CP0957 Information Relating to the Changing Energisation Status View summary
Modification Rejected Gaz de France Energy Marketing Limited 6 May 2003 P128 Correction of Erroneous Energy Contract Volume Notification Errors in specifically defined limited circumstances View summary Ofgem
Change Proposal Implemented ELEXON 2 May 2003 CP0955 Further definition of Timescales in BSCP514 ‘SVA Meter Operation for Metering Systems Registered in SMRS View summary
Change Proposal Rejected N/A 29 Apr 2003 CP0954 Inconsistency Over Presentation of NGC weekly forecasts View summary
Modification Implemented Enron Capital & Trade Resources Limited 28 Apr 2003 P127 Optional de-registration by insolvent Party View summary Ofgem
Change Proposal Implemented ELEXON 25 Apr 2003 CP0956 Resolution of Inconsistency Over Presentation of NGC weekly forecasts View summary
Change Proposal Rejected Powergen 24 Apr 2003 CP0953 Control over affirmation of metering system details (D0052) View summary
Change Proposal Rejected ELEXON 23 Apr 2003 CP0952 Clarification of Pre-Payment Meter reading Obligations View summary
Change Proposal Implemented ELEXON 17 Apr 2003 CP0951 Changes and Clarification to HHDA defaulting rules View summary
Modification Implemented BSC Panel 15 Apr 2003 P126 Housekeeping Modification View summary Ofgem
Change Proposal Implemented ELEXON 9 Apr 2003 CP0950 Removal of Redundant Flows From MDD View summary
Change Proposal Implemented ELEXON 1 Apr 2003 CP0949 PAF Review - Updates to BSCP535 (Tech Assurance) View summary
Change Proposal Implemented N/A 1 Apr 2003 CP0948 Upgrade to Oracle 8.1.7.4 for EAC/AA software View summary
Modification Implemented SSE 31 Mar 2003 P125 Apportionment of the Scottish Interconnector flows to the Northern and North Western GSP Groups for the purposes of calculating losses View summary Ofgem
Change Proposal Implemented ELEXON 31 Mar 2003 CP0947 Removal of References to Sending D0281 to NGC (BSCP508 & SVA Data Catalogue) View summary
Modification Implemented TXU Direct Sales Ltd 27 Mar 2003 P124 Revision of mandatory half-hour metering criteria View summary Ofgem
Modification Implemented BizzEnergy 26 Mar 2003 P123 Assessment of Credit Cover following a change in a Party’s Portfolio View summary Ofgem
Modification Implemented BizzEnergy 26 Mar 2003 P122 Assessment of Credit Cover during Holiday Periods View summary Ofgem
Change Proposal Implemented ELEXON 26 Mar 2003 CP0946 Inconsistency in the reporting of Metering Technical Detail View summary
Change Proposal Implemented Seeboard Energy Ltd 26 Mar 2003 CP0945 Addition of "Final Initial Settlement Run" into BSCP01 View summary
Change Proposal Implemented National Grid 20 Mar 2003 CP0944 Interconnector Administrator Data Flows View summary
Change Proposal Rejected National Grid 20 Mar 2003 CP0943 Amendment to BSCP20 View summary
Change Proposal Implemented N/A 19 Mar 2003 CP0942 Minor Corrections to BSCP507 and BSCP508 View summary
Change Proposal Implemented ELEXON 18 Mar 2003 CP0941 Add GSP Group information to the Supplier Agent appointment data flows and define new appointment Rejectedion code value View summary
Change Proposal Implemented ELEXON 18 Mar 2003 CP0940 Clarifications in BSCP02 and BSCP20 View summary
Change Proposal Implemented ELEXON 18 Mar 2003 CP0939 Clarification of NHHDC obligation to pass on EAC/AA data View summary
Change Proposal Withdrawn ELEXON 17 Mar 2003 CP0938 Incorrect footnote reference in BSCP504 3.3.10.2 View summary
Modification Withdrawn BizzEnergy 12 Mar 2003 P121 Credit Cover following a change in a Party’s Portfolio View summary Ofgem
Modification Withdrawn BizzEnergy 12 Mar 2003 P120 Credit Cover during holiday Periods View summary Ofgem
Change Proposal Implemented ELEXON 3 Mar 2003 CP0937 Operational Change to the Pool Application. View summary
Change Proposal Withdrawn ELEXON 27 Feb 2003 CP0936 Resolution of inconsistencies between MO & DC data View summary
Issue Closed EDF Trading 26 Feb 2003 Issue 003 Credit cover for Interconnector users
Modification Implemented BSC Panel 19 Feb 2003 P119 Increased flexibility in the reporting of upheld Trading Disputes relating to Credit Default View summary Ofgem
Modification Implemented BSC Panel 19 Feb 2003 P118 Increased efficiency in the reporting of Credit Default statements View summary Ofgem
Change Proposal Implemented ELEXON 18 Feb 2003 CP0935 Operational Review of BSCP42 (Business Continuity) View summary
Change Proposal Withdrawn N/A 14 Feb 2003 CP0934 Change to listing of failed instructions in the NHHDA system View summary
Change Proposal Implemented ELEXON 14 Feb 2003 CP0933 NHHDA and EAC/AA Systems – Management of System Security View summary
Change Proposal Withdrawn N/A 14 Feb 2003 CP0932 Invalid Supplier Hubs View summary
Change Proposal Withdrawn N/A 14 Feb 2003 CP0931 Distinction between Data Retrieval and Data Processing within Data Collector Role View summary
Change Proposal Withdrawn ELEXON 14 Feb 2003 CP0930 DC TO DA Market Indicator (P0056001) View summary
Change Proposal Implemented ELEXON 13 Feb 2003 CP0929 Remove Performance Reports from ISRA software and products View summary
Change Proposal Withdrawn N/A 13 Feb 2003 CP0928 Remote NHH Data Collection. View summary
Change Proposal Withdrawn N/A 13 Feb 2003 CP0927 Governance of Change of Supplier disputes View summary
Change Proposal Withdrawn N/A 13 Feb 2003 CP0926 Provision of Current & Voltage Transformer Certificates View summary
Change Proposal Withdrawn N/A 13 Feb 2003 CP0925 The Timing and Frequency of Meter Readings from Prepayment M View summary
Change Proposal Withdrawn ELEXON 13 Feb 2003 CP0924 Missing requirement on data collectors to notify Suppliers View summary
Change Proposal Rejected ELEXON 11 Feb 2003 CP0923 Operational Review of BSCP509 - Change to Market Domain Data View summary
Change Proposal Implemented ELEXON 6 Feb 2003 CP0922 Clarification of use of data by NHHDC View summary
Change Proposal Implemented ELEXON 5 Feb 2003 CP0921 NGC Notification Processing of MIL/MEL Messages View summary
Change Proposal Withdrawn ELEXON 30 Jan 2003 CP0920 Distribution Line Loss Factors for new LLFC View summary
Change Proposal Withdrawn ELEXON 30 Jan 2003 CP0919 Generation Line Loss Factors View summary
Modification Implemented BSC Panel 29 Jan 2003 P117 Rectification of Past Notification Errors (PNEs) View summary Ofgem
Change Proposal Implemented ELEXON 28 Jan 2003 CP0918 Verification of authorised signatures by the FAA View summary
Change Proposal Rejected ELEXON 22 Jan 2003 CP0917 Reporting of upheld Trading Disputes on the BMRS View summary
Change Proposal Implemented ELEXON 21 Jan 2003 CP0916 Timing of the SAAI006 flow from the IA View summary
Change Proposal Implemented ELEXON 21 Jan 2003 CP0915 Processing of late and revised SAA I006 files from IA View summary
Change Proposal Implemented ELEXON 21 Jan 2003 CP0914 BSCP504 and SVA DC inconsistency View summary
Change Proposal Implemented ELEXON 21 Jan 2003 CP0913 Clarification of AA / EAC data to be sent by the NHHDC View summary
Change Proposal Implemented ELEXON 15 Jan 2003 CP0912 Changes to Half Hourly Meter Technical Details - D0268. View summary
Change Proposal Implemented ELEXON 13 Jan 2003 CP0911 Minor correction to ECVAA URS F005 and F006 View summary
Change Proposal Rejected ELEXON 10 Jan 2003 CP0910 Withdrawal of Meter Readings Post-Final Reconciliation View summary
Change Proposal Rejected ELEXON 9 Jan 2003 CP0909 Deemed Reads where Initial Reads invalid or unattainable View summary
Change Proposal Withdrawn N/A 9 Jan 2003 CP0908 NHH New Connections Sequences. View summary
Change Proposal Withdrawn ELEXON 9 Jan 2003 CP0907 Security concerns surrounding use of Oracle SYS user View summary
Change Proposal Withdrawn ELEXON 9 Jan 2003 CP0906 Revision to the Minimum Registration Period View summary
Change Proposal Withdrawn N/A 9 Jan 2003 CP0905 Derivation and validation of EACs. View summary
Change Proposal Implemented ELEXON 9 Jan 2003 CP0904 Change to SVA Data Catalogue flow D0030 View summary
Change Proposal Withdrawn ELEXON 8 Jan 2003 CP0903 Incorrect reference in BSCP531 View summary
Modification Implemented East Midland Electricity Distribution Plc 6 Jan 2003 P116 Changes to Allow Line Loss Factor Data from BSC Website to be Used in Settlement View summary Ofgem
Issue Closed Bizz Energy 6 Jan 2003 Issue 002 Credit Indebtedness Calculation during Holiday periods
Change Proposal Superseded ELEXON 2 Jan 2003 CP0902 Revision to the Minimum Registration Period (CRA, CMRS) View summary
Issue Closed Gaz de France 2 Jan 2003 Issue 001 Credit cover provisions for the BSC signatories withdrawing from the Market
Modification Rejected Innogy plc 24 Dec 2002 P115 Disapplication Of Supplier Charges Under Certain Circumstances View summary Ofgem
Change Proposal Implemented ELEXON 19 Dec 2002 CP0901 Unix 5.1 upgrade View summary
Change Proposal Withdrawn ELEXON 19 Dec 2002 CP0900 Change of address in BSCP601 View summary
Change Proposal Implemented ELEXON 17 Dec 2002 CP0899 Changes to the SVA MAR Requirements View summary
Change Proposal Rejected Npower Ltd 16 Dec 2002 CP0898 Provision of Instruction Failure Information to Supplier View summary
Change Proposal Implemented ELEXON 16 Dec 2002 CP0897 Clarifications to BMRA URS and SAA URS View summary
Change Proposal Withdrawn ELEXON 10 Dec 2002 CP0896 Amendment to BSCP75 View summary
Change Proposal Withdrawn ELEXON 10 Dec 2002 CP0895 Clarifications to BSCP502 View summary
Change Proposal Implemented ELEXON 10 Dec 2002 CP0894 Erroneous Registration and Change of Agent View summary
Change Proposal Implemented ELEXON 10 Dec 2002 CP0893 Changes to the PAB Escalation Cycle in BSCP534 View summary
Change Proposal Implemented ELEXON 10 Dec 2002 CP0892 Changes to the flagging of Actual and Estimated Data by the Half Hour Data Aggregator View summary
Change Proposal Implemented ELEXON 3 Dec 2002 CP0891 Upgrade to Oracle 8.1.7.4 for NHHDA software View summary
Modification Implemented Slough Energy Supplies Limited 2 Dec 2002 P114 Entitlement of Licence Exemptable Generators (“LEGs”) and other Non-trading Parties to BSC Membership Without Evidence of Trading View summary Ofgem
Change Proposal Withdrawn ELEXON 2 Dec 2002 CP0890 Data Clarification from previous appointment by NHHDC View summary
Modification Implemented BSC Panel 27 Nov 2002 P113 E-mail communications under the Code View summary Ofgem
Modification Implemented BSC Panel 27 Nov 2002 P112 Removing the obligation on new BSC Parties acceding to the BSC Framework Agreement to comply with Section A 2.2.5 View summary Ofgem
Modification Rejected Powergen 27 Nov 2002 P111 Procedure to allow the BSC Panel to refuse to accept Contingent Modification Proposals View summary Ofgem
Change Proposal Implemented ELEXON 19 Nov 2002 CP0889 Revision to the ‘TA2000’ and ‘NHH Agent Competition’ text within BSCP511 ‘Entry Process - Supplier Meter Registration Service and BSCP512 ‘Entry Processes - Supplier’ View summary
Change Proposal Implemented ELEXON 15 Nov 2002 CP0888 ECVNA Authorisation Terminations Effective on Receipt View summary
Change Proposal Implemented ELEXON 13 Nov 2002 CP0887 Update to BSCP 508 File - Re-send Requests View summary
Change Proposal Superseded ELEXON 12 Nov 2002 CP0886 ECVNA and MVRNA Authorisation and Key Change View summary
Change Proposal Superseded ELEXON 12 Nov 2002 CP0885 ECVNA Authorisation Terminations Effective on Receipt View summary
Change Proposal Superseded ELEXON 12 Nov 2002 CP0884 ECVNA Authorisation Terminations Effective on Receipt View summary
Change Proposal Withdrawn ELEXON 8 Nov 2002 CP0883 Revise staff availability hours for SMRS operational enquiry View summary
Change Proposal Withdrawn ELEXON 8 Nov 2002 CP0882 Populating the Energisation Status in the D0055 where the in View summary
Change Proposal Rejected Innogy Plc 7 Nov 2002 CP0881 Provision of SAA-I014 Variant 2 (S0142) to BSC Parties View summary
Modification Implemented AES Drax Power Ltd 4 Nov 2002 P110 Nullification Of Volume Notifications Where No Notification Authorisations Are In Place View summary Ofgem
Change Proposal Withdrawn ELEXON 4 Nov 2002 CP0880 Transfer of Reading History after Change of Profile Class View summary
Modification Rejected British Energy 1 Nov 2002 P109 A Hedging Scheme for changes to TLF in Section T of the code View summary Ofgem
Modification Implemented British Gas 1 Nov 2002 P108 Modification to enable BSCCo to prepare for the implementation of British Electricity Trading and Transmission Arrangements (BETTA) View summary Ofgem
Modification Implemented SSE 30 Oct 2002 P107 Data Retention Requirements for Post-Final Trading Disputes View summary Ofgem
Change Proposal Withdrawn ELEXON 30 Oct 2002 CP0879 Increase size of the Meter Id in the SVA Data Catalogue View summary
Change Proposal Implemented ELEXON 28 Oct 2002 CP0878 Notification of Superseded ECVNA/MVRNA Authorisations View summary
Modification Implemented British Gas 25 Oct 2002 P106 Amendment to the BSC to allow Multiple Supplier Ids View summary Ofgem
Modification Rejected Powergen 24 Oct 2002 P105 Introduction of Zonal Transmission Losses on a Marginal Basis without Phased Implementation View summary Ofgem
Change Proposal Implemented ELEXON 21 Oct 2002 CP0877 Notification Agent Forward Contract Report Sub flow View summary
Change Proposal Implemented ELEXON 18 Oct 2002 CP0876 Resolution of internal BMRA discrepancies View summary
Modification Implemented BSC Panel 17 Oct 2002 P104 Amendments to the Solution to P78 ‘Revised Definitions of System Buy Price and System Sell Price’ View summary Ofgem
Change Proposal Implemented ELEXON 15 Oct 2002 CP0875 SVA Data Catalogue P0206 Data Item Omission View summary
Change Proposal Withdrawn ELEXON 10 Oct 2002 CP0874 Include the 'Meter Type' data item within the BSC SVA DC View summary
Change Proposal Implemented ELEXON 10 Oct 2002 CP0873 Changes to the Half Hourly Data Estimation Requirements View summary
Change Proposal Superseded ELEXON 10 Oct 2002 CP0872 Comprehensive changes to D0268 View summary
Change Proposal Implemented ELEXON 10 Oct 2002 CP0871 Operational Review of BSCP40 (Change Management) View summary
Change Proposal Withdrawn TXU Europe Energy Trading Ltd 8 Oct 2002 CP0870 Reporting of GC & DC Values for BMUs in CRA Reports View summary
Modification Rejected Slough Energy Supplies Limited 7 Oct 2002 P103 Respecification of Trading Data View summary Ofgem
Modification Rejected Slough Energy Supplies Limited 7 Oct 2002 P102 Entitlement of Licence Exemptable Generators (“LEGs”) to BSC Membership Without Evidence of Trading View summary Ofgem
Change Proposal Implemented N/A 7 Oct 2002 CP0869 Inclusion of Credit Assessment QCE in ECVAA I-014 View summary
Change Proposal Implemented ELEXON 7 Oct 2002 CP0868 Requirement for NHH Data Collector to provide latest EAC to new NHH Data Aggregator on change of NHHDA View summary
Change Proposal Implemented ELEXON 2 Oct 2002 CP0867 Logging and Performance Monitoring version 2.30 View summary
Change Proposal Implemented ELEXON 2 Oct 2002 CP0866 Pool Application version 1.80 View summary
Change Proposal Implemented ELEXON 1 Oct 2002 CP0865 BSCP68 Clarification View summary
Change Proposal Rejected N/A 27 Sept 2002 CP0864 Indication of Status of BM Units within S0142 Report View summary
Change Proposal Implemented ELEXON 26 Sept 2002 CP0863 Inconsistency between the ECVAA SD, URS and Code View summary
Change Proposal Withdrawn ELEXON 25 Sept 2002 CP0862 Error in BSCP501 View summary
Change Proposal Implemented N/A 25 Sept 2002 CP0861 SVA Data Catalogue Volume 2 View summary
Change Proposal Withdrawn ELEXON 23 Sept 2002 CP0860 Clarification of the use of D0150 View summary
Change Proposal Implemented ELEXON 20 Sept 2002 CP0859 Incorrect reference in BSCP531 View summary
Change Proposal Implemented First Hydro Company 18 Sept 2002 CP0858 Inclusion of Energy Indebtedness data within ECVAA-I014 View summary
Modification Implemented BSC Panel 16 Sept 2002 P101 Housekeeping Modification View summary Ofgem
Change Proposal Implemented ELEXON 13 Sept 2002 CP0857 Changes required to BSCP28 View summary
Change Proposal Superseded ELEXON 13 Sept 2002 CP0856 Resolution of internal BMRA discrepancies View summary
Change Proposal Superseded ELEXON 13 Sept 2002 CP0855 Processing of MIL/MEL Messages in Sequence View summary
Change Proposal Implemented ELEXON 13 Sept 2002 CP0854 Provision of a new BSCP (SVA MOA Processes) View summary
Change Proposal Superseded N/A 12 Sept 2002 CP0853 Inclusion of Credit Assessment QCE in ECVAA I-014 View summary
Change Proposal Implemented N/A 10 Sept 2002 CP0852 Amendments to BSCPs to use terminology used in Annex S-1 View summary
Change Proposal Implemented N/A 10 Sept 2002 CP0851 Update to forms in BSCP536 View summary
Modification Implemented Slough Energy Supplies Limited 2 Sept 2002 P100 Extension of Demand-side Trading Units in order to increase the competitiveness of the market for embedded benefits View summary Ofgem
Modification Implemented British Gas 2 Sept 2002 P099 Changes to Accreditation and the PARMS Serials and Standards, resulting from the Performance Assurance Framework (PAF) Review (Phase 1) View summary Ofgem
Modification Implemented Dynegy 2 Sept 2002 P098 Dual Notification Of Contract Positions. View summary Ofgem
Modification Withdrawn Powergen 30 Aug 2002 P097 Modification to enable ELEXON to prepare for the implementation of British Electricity Trading and Transmission Arrangements (BETTA) View summary Ofgem
Change Proposal Implemented ELEXON 30 Aug 2002 CP0850 Creation of exception log in SVAA software for timestamp errors in D0277 Flow View summary
Change Proposal Implemented ELEXON 29 Aug 2002 CP0849 SVAA National Service Desk Severity Levels View summary
Change Proposal Implemented ELEXON 27 Aug 2002 CP0848 Logging and Performance Monitoring release 2.2.1 View summary
Change Proposal Implemented ELEXON 27 Aug 2002 CP0847 MDD Release 5.2 View summary
Change Proposal Implemented ELEXON 20 Aug 2002 CP0846 Clarifications to Flexible Reporting in BSCP41 View summary
Change Proposal Implemented ELEXON 14 Aug 2002 CP0845 PARMS - Correction To LD Reports View summary
Modification Rejected Dynegy 13 Aug 2002 P096 Merger Of Assessment & Definition Phases In The Modification Process View summary Ofgem
Change Proposal Implemented N/A 13 Aug 2002 CP0844 Correcting Swapped Registers on SVA Multi-Rate Meters View summary
Change Proposal Rejected N/A 13 Aug 2002 CP0843 Modification to BMRA Web Site to Support Windows XP View summary
Change Proposal Withdrawn ELEXON 8 Aug 2002 CP0842 Revision to Non-Half Historical Data Transfer Requirements View summary
Change Proposal Implemented ELEXON 7 Aug 2002 CP0841 Substituted metered data in the CDCA I012. View summary
Change Proposal Implemented N/A 1 Aug 2002 CP0840 Amendments to the IDD- Part 1. (Version 4.7) View summary
Change Proposal Withdrawn Innogy 31 Jul 2002 CP0839 Amendment to ECVNA Authorisation Termination Request Form View summary
Change Proposal Implemented ELEXON 26 Jul 2002 CP0838 Inconsistencies between the use of D0139 in BSCP 502 View summary
Change Proposal Withdrawn ELEXON 19 Jul 2002 CP0837 Introduction of the use of electronic signatures in BSCP509 View summary
Change Proposal Implemented ELEXON 15 Jul 2002 CP0836 Update of Supplier Meter Registration System (SMRS) database View summary
Modification Rejected Slough Energy Supplies Limited 12 Jul 2002 P095 Transitional Amelioration of Barriers to Licenced Exempt Generators’ Market Participation View summary Ofgem
Change Proposal Implemented ELEXON 11 Jul 2002 CP0835 Upgrade to UNIX 5 for ISRA/ SVAA software View summary
Change Proposal Implemented ELEXON 9 Jul 2002 CP0834 Dependency of Inter-Agent Transfers on D0151 (Termination Of Appointment View summary
Modification Rejected BSC Panel 8 Jul 2002 P094 Introduction Of A Process To Allow The Panel To Recall Modification Reports From The Authority To Allow The Legal Drafting To Be Corrected If Working Assumptions Prove To Be Incorrect. View summary Ofgem
Modification Rejected BSC Panel 8 Jul 2002 P093 Introduction Of Process For Amendment Of Proposed Modification Implementation Dates View summary Ofgem
Modification Implemented BSC Panel 8 Jul 2002 P092 Replacement Energy Contract Volume Notifications (ECVNs) And Metered Volume Reallocation Notifications (MVRNs) View summary Ofgem
Modification Implemented National Grid 8 Jul 2002 P091 Extension To Data Provided To the Transmission Company In The TUoS Report View summary Ofgem
Modification Rejected First Hydro Company 8 Jul 2002 P090 Improving The Representation Of Energy Balancing Actions In Cashout Prices. View summary Ofgem
Change Proposal Withdrawn ELEXON 5 Jul 2002 CP0833 Revise three of the Serials in PSL110 'SVA Meter Operation'. View summary
Change Proposal Implemented ELEXON 5 Jul 2002 CP0832 Resolution of Defects in the IDD View summary
Change Proposal Rejected N/A 4 Jul 2002 CP0831 Amend 'Meter Type' definition for pre-payment meter View summary
Change Proposal Implemented ELEXON 4 Jul 2002 CP0830 Services Description Updates to reflect Code changes View summary
Change Proposal Implemented ELEXON 3 Jul 2002 CP0829 Match Effective Date of CVA LLF to ISG Approval Date. View summary
Modification Implemented National Grid 2 Jul 2002 P089 Clarification Of The Timescales For Submitting MEL/MIL Data To The BMRA View summary Ofgem
Change Proposal Implemented ELEXON 2 Jul 2002 CP0828 New Metering Code of Practice View summary
Change Proposal Withdrawn ELEXON 26 Jun 2002 CP0827 Clarifications to the CoS and CoMC from NHH to HH. View summary
Change Proposal Withdrawn ELEXON 20 Jun 2002 CP0826 Reconciliation of Supplier MOA Mismatches. View summary
Change Proposal Withdrawn ELEXON 20 Jun 2002 CP0825 Provision of Metering System Energisation Status to HHDC View summary
Change Proposal Withdrawn ELEXON 18 Jun 2002 CP0824 Housekeeping Change to BSCP536 View summary
Change Proposal Withdrawn ELEXON 18 Jun 2002 CP0823 Housekeeping change to BSCP534 View summary
Change Proposal Withdrawn ELEXON 13 Jun 2002 CP0822 Housekeeping change to BSCP533 View summary
Change Proposal Implemented Powergen UK plc. 12 Jun 2002 CP0821 Improvements to CVA Allocation Proving Test Requirements View summary
Change Proposal Implemented ELEXON 12 Jun 2002 CP0820 Enhancements to a number of Unmetered Supplies Processes View summary
Change Proposal Implemented N/A 12 Jun 2002 CP0819 Amend the SVAA software to improve performance View summary
Change Proposal Superseded N/A 12 Jun 2002 CP0818 Provision of Metering System Energisation Status (ES) View summary
Change Proposal Superseded N/A 12 Jun 2002 CP0817 Reconciliation of Supplier Meter Operator Agent Appointment View summary
Change Proposal Withdrawn National Grid 7 Jun 2002 CP0816 Provide HH / NHH SVA data split by BM Unit to NGC View summary
Change Proposal Implemented ELEXON 5 Jun 2002 CP0815 Restructuring of ISRA Flat Files View summary
Change Proposal Implemented ELEXON 5 Jun 2002 CP0814 Allow Amendments to ISRA Calendar View summary
Change Proposal Implemented ELEXON 5 Jun 2002 CP0813 Amend the SVAA Load Data Files screen View summary
Change Proposal Implemented ELEXON 5 Jun 2002 CP0812 Improvements to SVAA LLFC Closure Performance View summary
Modification Implemented SSE 31 May 2002 P088 Introduction of obligations in relation to SVA Metering, Meter Operator Agents and Equipment Owners View summary Ofgem
Modification Rejected National Grid 31 May 2002 P087 Removal of market risk associated with operation of a Generator Inter-Trip Scheme View summary Ofgem
Modification Implemented National Grid 31 May 2002 P086 Clarification of frequency and timing of data submission of Generating Plant Demand Margin and Surplus View summary Ofgem
Modification Withdrawn British Energy 31 May 2002 P085 A Phased Implementation Scheme for changes to TLF in Section T of the code View summary Ofgem
Change Proposal Implemented ELEXON 31 May 2002 CP0811 Clarify the timescales associated with steps 3.2.5.6 and 3.2.5.7 within BSCP550 View summary
Change Proposal Implemented ELEXON 30 May 2002 CP0810 Clarification to BSCP502 - Energy Recorded Exceeds Limit View summary
Modification Implemented Innogy plc 22 May 2002 P084 Amendment To Process For Past Notification Errors (2) View summary Ofgem
Modification Implemented Innogy plc 22 May 2002 P083 Amendment To Process For Past Notification Errors (1) View summary Ofgem
Change Proposal Withdrawn ELEXON 20 May 2002 CP0809 PDSO's obligation to issue D0265 flows to Suppliers View summary
Change Proposal Implemented N/A 20 May 2002 CP0808 Changes to the Software Maintenance Service (SSL370) View summary
Change Proposal Withdrawn N/A 19 May 2002 CP0807 Additional Multiplier Field in the D0268 flow View summary
Change Proposal Implemented N/A 15 May 2002 CP0806 Changes to the SVA Data Catalogue View summary
Change Proposal Implemented N/A 15 May 2002 CP0805 Amendment to BSCP502 - inclusion of the D0275 dataflow View summary
Change Proposal Superseded N/A 14 May 2002 CP0804 Enhance D0268 'HH Meter Technical Details' within the SVA DC View summary
Modification Rejected First Hydro Company 3 May 2002 P082 Introduction Of Zonal Transmission Losses On An Average Basis View summary Ofgem
Modification Implemented TXU UK Ltd 3 May 2002 P081 Removal Of The Requirement For Half Hourly Metering On Third Party Generators At Domestic Premises View summary Ofgem
Change Proposal Rejected N/A 3 May 2002 CP0803 Missing Requirement to Address Failing Instructions View summary
Change Proposal Superseded N/A 3 May 2002 CP0802 Amendment to BSCP502 - inclusion of the D0275 dataflow View summary
Change Proposal Implemented N/A 3 May 2002 CP0801 Inappropriate date conversion during data estimation View summary
Change Proposal Implemented N/A 3 May 2002 CP0800 Mandatory Full Refreshes View summary
Change Proposal Implemented N/A 3 May 2002 CP0799 Amendments to BSCP504 View summary
Change Proposal Superseded N/A 3 May 2002 CP0798 Changes to the SVA Data Catalogue View summary
Modification Rejected British Energy 1 May 2002 P080 Deemed Bid/Offer Acceptance For Transmission System Faults View summary Ofgem
Change Proposal Implemented N/A 29 Apr 2002 CP0797 Provide a full flow for the RF (Final Reconciliation) run View summary
Change Proposal Withdrawn N/A 25 Apr 2002 CP0796 BSCP 68 and CRA and CDCA Service Descriptions. View summary
Change Proposal Withdrawn N/A 23 Apr 2002 CP0795 Meter Readings failing NHHDC Validation. View summary
Change Proposal Implemented N/A 18 Apr 2002 CP0794 Removal of requirement for CT certificates for LV CTs View summary
Change Proposal Withdrawn N/A 18 Apr 2002 CP0793 Meter Readings failing NHHDC Validation. View summary
Change Proposal Implemented N/A 18 Apr 2002 CP0792 Add the MOA as a recipient of D0148 View summary
Change Proposal Implemented N/A 18 Apr 2002 CP0791 Notification of SMRS Refreshes. View summary
Change Proposal Implemented N/A 18 Apr 2002 CP0790 Distribution of Supplier Purchase Matrix (D0041) files View summary
Change Proposal Implemented ELEXON 18 Apr 2002 CP0789 Enhancements to the Validation of NHH Meter Data View summary
Change Proposal Withdrawn ELEXON 18 Apr 2002 CP0788 Definition of new SVA Manual Data Flow View summary
Change Proposal Implemented N/A 18 Apr 2002 CP0787 Enhancements to Instruction File Processing View summary
Change Proposal Implemented N/A 18 Apr 2002 CP0786 Minor Clarifications to BSCP507. View summary
Change Proposal Implemented N/A 18 Apr 2002 CP0785 Minor clarification to SSL330 'National Support Services'. View summary
Change Proposal Withdrawn N/A 18 Apr 2002 CP0784 Improvement to Metering System Proving Tests View summary
Change Proposal Withdrawn N/A 18 Apr 2002 CP0783 Minor Enhancements to BSCP501 View summary
Change Proposal Implemented ELEXON 16 Apr 2002 CP0782 Amendments and Clarifications to BSCP15 View summary
Change Proposal Implemented ELEXON 16 Apr 2002 CP0781 Amendments and Clarifications to BSCP75 View summary
Change Proposal Implemented ELEXON 16 Apr 2002 CP0780 Amendments and Clarifications to BSCP20 and BSCP06 View summary
Modification Rejected London Electricity Group 12 Apr 2002 P079 Revised Rules For Default Energy Imbalance Pricing View summary Ofgem
Change Proposal Implemented ELEXON 9 Apr 2002 CP0779 Clarification to the proving of Half Hourly Metering Systems View summary
Change Proposal Implemented ELEXON 9 Apr 2002 CP0778 Inclusion of Approved (Prop)d CRs in BSCP504 v4.0 View summary
Change Proposal Implemented ELEXON 9 Apr 2002 CP0777 Alterations to FAA Doc. to meet four BSC requirements. View summary
Modification Implemented British Gas 8 Apr 2002 P076 Anomalies Associated With Negative Quantities Of Credit Cover View summary Ofgem
Modification Implemented National Grid 5 Apr 2002 P078 Revised Definitions of System Buy Price and System Sell Price View summary Ofgem
Modification Rejected SSE 5 Apr 2002 P077 Interconnector Multiple BM Units View summary Ofgem
Modification Rejected Powergen 5 Apr 2002 P075 Introduction Of Zonal Transmission Losses View summary Ofgem
Modification Implemented Powergen 5 Apr 2002 P073 Addition To Data Required From Transmission Company When Submitting A Claim For Manifest Error View summary Ofgem
Change Proposal Superseded 5 Apr 2002 CP0776 Inconsistencies between uses of D0139 in BSCP 502 & MRA DTC.
Change Proposal Implemented ELEXON 5 Apr 2002 CP0775 Enhanced validation within CRA. View summary
Change Proposal Implemented ELEXON 5 Apr 2002 CP0774 Definition of new SVA Manual Data Flow View summary
Change Proposal Withdrawn ELEXON 5 Apr 2002 CP0773 Change to return address in forms F601/03 and F601/05 of BSCP 601 'Metering Protocol Approval and Compliance Testing' View summary
Change Proposal Implemented N/A 5 Apr 2002 CP0772 Enhance D0268 'Half Hourly Meter Technical Details' View summary
Change Proposal Rejected N/A 5 Apr 2002 CP0771 Modify timescale associated with provision of the SMRS View summary
Modification Rejected Electricity Direct 4 Apr 2002 P074 Single Cost-reflective Cash-out Price View summary Ofgem
Change Proposal Implemented ELEXON 26 Mar 2002 CP0770 Corrections to SVA PSLs 110, 120, 130 and 140. View summary
Change Proposal Implemented ELEXON 21 Mar 2002 CP0769 Improved NHHDA Screens View summary
Change Proposal Implemented ELEXON 21 Mar 2002 CP0768 D0086 Meter Readings View summary
Change Proposal Superseded ELEXON 18 Mar 2002 CP0767 Modification to timesteps in BSCP28 to align with BSCP 68. View summary
Modification Implemented BSC Panel 14 Mar 2002 P072 Correction Of A Minor Inconsistency In The BSC Arbitrage And Trade Tagging Methodology View summary Ofgem
Change Proposal Withdrawn ELEXON 14 Mar 2002 CP0766 Minor documentation change to BSCP501. View summary
Change Proposal Implemented N/A 12 Mar 2002 CP0765 Introduce two new MTC's to uniquely identify actual MSIDs View summary
Change Proposal Implemented N/A 12 Mar 2002 CP0764 Publication of updated Appendices from BSCP601 on website. View summary
Change Proposal Rejected ELEXON 11 Mar 2002 CP0763 Identify Prepayment Meters and Remove Erroneous Data Items View summary
Change Proposal Rejected ELEXON 8 Mar 2002 CP0762 Meter Advance Reconciliation Results to PDSOs View summary
Modification Implemented National Grid 4 Mar 2002 P071 Transfer of imbalances caused by Balancing Services to the Transmission Company Energy Account View summary Ofgem
Change Proposal Implemented ELEXON 4 Mar 2002 CP0761 BSCP15 Housekeeping change View summary
Modification Rejected SEEBOARD 1 Mar 2002 P070 CMRS Metering For Inter-DNO Boundaries Within A GSP Group View summary Ofgem
Change Proposal Implemented N/A 22 Feb 2002 CP0760 Identification of Prepayment Meters within D0150 View summary
Modification Withdrawn TotalFinaElf Gas and Power Ltd 19 Feb 2002 P069 Short-Term Measures To Alleviate The Inefficiencies Within The Present Credit Energy Indebtedness Methodology View summary Ofgem
Change Proposal Superseded N/A 19 Feb 2002 CP0759 Inconsistencies with estimates based on actual HH data. View summary
Change Proposal Superseded N/A 19 Feb 2002 CP0758 Improvements to estimation and validation techniques in BSCP502 View summary
Change Proposal Implemented N/A 19 Feb 2002 CP0757 Missing Timescale in PSL110 Section 5.3.2 View summary
Change Proposal Implemented N/A 19 Feb 2002 CP0756 Use of email as an alternative to Authorised Signatures View summary
Change Proposal Implemented N/A 19 Feb 2002 CP0755 Enhanced ECVAA Reporting View summary
Modification Implemented BSC Panel 14 Feb 2002 P068 Modification to the BSC relating to the setting of Supplier Caps for use in the Supplier Charges (Liquidated Damages) calculation View summary Ofgem
Change Proposal Implemented National Grid 13 Feb 2002 CP0754 Correction of Defect in SAA-I014 Flow 2 Report View summary
Change Proposal Implemented ELEXON 13 Feb 2002 CP0753 Improvements to the Metering Registration Process View summary
Change Proposal Implemented ELEXON 12 Feb 2002 CP0752 Clarify the NHH Deemed Reading Rules at Final Reconciliation View summary
Change Proposal Implemented ELEXON 12 Feb 2002 CP0751 Amendments and Clarifications to BSCP03 for CDCA View summary
Change Proposal Implemented ELEXON 12 Feb 2002 CP0750 Amendments to BSCP301 View summary
Change Proposal Implemented ELEXON 11 Feb 2002 CP0749 Formalising confirmation of Exempt Export BM Unit Status View summary
Change Proposal Withdrawn ELEXON 8 Feb 2002 CP0748 Estimation of Reactive Metering Data View summary
Change Proposal Implemented ELEXON 7 Feb 2002 CP0747 Introduction of a more efficient D0265 data flow format. View summary
Change Proposal Superseded ELEXON 6 Feb 2002 CP0746 Introduction of a more efficient D0265 data flow format. View summary
Change Proposal Superseded ELEXON 6 Feb 2002 CP0745 Assignment of CALF values to new BMU Units View summary
Change Proposal Implemented ELEXON 25 Jan 2002 CP0744 Notice Period for Category 1 non-compliance reminders View summary
Modification Implemented Powergen UK 22 Jan 2002 P067 Facilitation of further consolidation options for Licence Exempt Generators (DTI Consolidation Working Group ‘Option 4’) View summary Ofgem
Change Proposal Implemented ELEXON 22 Jan 2002 CP0743 Changes to BSCP526 and BSCP26. View summary
Modification Rejected TXU UK Ltd 18 Jan 2002 P066 ECVNAs and MVRNAs To Receive ECVAA Forward Contract Report View summary Ofgem
Change Proposal Withdrawn N/A 16 Jan 2002 CP0742 Removal of HH Instruction Processing Specification from SVA DC View summary
Change Proposal Rejected N/A 16 Jan 2002 CP0741 Removal of NHH Instruction Processing Specification from SVA DC View summary
Change Proposal Superseded N/A 16 Jan 2002 CP0740 Notification of a Party's expulsion or withdrawal. View summary
Modification Withdrawn TXU Europe Energy Trading Ltd 14 Jan 2002 P065 Amendment To The Requirement For A Mod Proposer’s Representative To Attend The Relevant Panel Meeting In Certain Circumstances View summary Ofgem
Modification Withdrawn TXU Europe Energy Trading Ltd 14 Jan 2002 P064 Reduction of GC values to Zero during a BSC Season View summary Ofgem
Change Proposal Implemented N/A 9 Jan 2002 CP0739 Services Description Updates to reflect Code changes v1.0 to v1.1. View summary
Change Proposal Superseded N/A 9 Jan 2002 CP0738 Update to Contact Numbers in BSCP42 View summary
Change Proposal Withdrawn N/A 7 Jan 2002 CP0737 Volume restriction on use of 1kW advance View summary
Change Proposal Implemented 7 Jan 2002 CP0736 Timing of BMRS Reporting of Indicative Imbalance Prices View summary
Modification Implemented British Gas 6 Jan 2002 P063 Change Of Contract Management of MPAN's For Data Collector, Data Aggregator And Meter Operator. View summary Ofgem
Change Proposal Implemented ELEXON 4 Jan 2002 CP0735 Formalisation of Manifest Error process View summary
Modification Implemented TXU UK Ltd 3 Jan 2002 P062 Changes to Facilitate Competitive Supply On The Networks Of New Licensed Distributors View summary Ofgem
Change Proposal Withdrawn ELEXON 3 Jan 2002 CP0734 Requests for High Grade Service View summary
Change Proposal Withdrawn ELEXON 3 Jan 2002 CP0733 Reference to Interim Information and Panel Approved (Prop)d delays View summary
Change Proposal Withdrawn ELEXON 2 Jan 2002 CP0732 Rewrite of BSCP 528 and consolidation of BSCP 528 Addendum
Change Proposal Implemented N/A 2 Jan 2002 CP0731 Rewrite of BSCP 528 and consolidation of BSCP 528 View summary
Modification Implemented Scottish Power 31 Dec 2001 P061 Ad Hoc Adjustments to Settlement involving material errors without resorting to Ad Hoc Settlement Runs View summary Ofgem
Change Proposal Implemented ELEXON 23 Dec 2001 CP0504 Logging Application View summary
Change Proposal Implemented N/A 21 Dec 2001 CP0730 Upgrade to UNIX 5 for NHHDA and EAC/AA software View summary
Change Proposal Rejected N/A 19 Dec 2001 CP0729 Inconsistent Terminology between BSC, CSD & BSC Agents View summary
Change Proposal Superseded ELEXON 18 Dec 2001 CP0728 Estimation of Reactive Metering Data View summary
Change Proposal Implemented ELEXON 18 Dec 2001 CP0727 Enhancements to the SVA BM Unit registration process View summary
Change Proposal Implemented ELEXON 7 Dec 2001 CP0726 Improvements to the Registration BSCP Forms View summary
Modification Implemented British Gas 5 Dec 2001 P060 Amendment To Obligation To Register Metering Systems In Relation To Trade Sales View summary Ofgem
Modification Rejected Innogy plc 3 Dec 2001 P059 The acceptance of Bids and Offers to honour a BM Unit’s dynamic parameters beyond the Balancing Mechanism window View summary Ofgem
Modification Implemented Dynegy 3 Dec 2001 P058 Disapplication of Volume Notifications Relating to a Defaulting Party View summary Ofgem
Modification Rejected British Gas 3 Dec 2001 P057 Amendment To BSC Failing Supplier Process To Allow A Legal Entity To Have Two Party Ids For A Short Period View summary Ofgem
Modification Implemented National Grid 3 Dec 2001 P056 Proposed Modification to the BSC in order to reflect amended references in The National Grid Company plc’s Transmission Licence. View summary Ofgem
Modification Implemented Smartest Energy 30 Nov 2001 P055 BSC conflicts with consolidation of Embedded Generation in Central Volume Allocation View summary Ofgem
Modification Implemented National Grid 29 Nov 2001 P054 Ability To Hold Short Notice BSC Panel Meetings View summary Ofgem
Change Proposal Implemented N/A 26 Nov 2001 CP0725 Enduring Solution for Historical Overwrite in ECVAA View summary
Modification Implemented BSC Panel 16 Nov 2001 P053 Changes to DC, GC and CALF and the Effect on Energy Indebtedness View summary Ofgem
Modification Implemented SEEBOARD 14 Nov 2001 P052 Non-Party Access to the BMRS via the High Grade Service View summary Ofgem
Change Proposal Implemented SVA. Agent 13 Nov 2001 CP0724 Amendment to BSCP508 “Supplier Volume Allocation Agent” View summary
Change Proposal Withdrawn British Gas Trading 9 Nov 2001 CP0723 Automated Meter Reading View summary
Modification Withdrawn UK Coal Mining Ltd 8 Nov 2001 P051 Distribution Of BSC Data To All BSC And Non BSC Parties View summary Ofgem
Modification Rejected UK Coal Mining Ltd 8 Nov 2001 P050 Distribution Of BM Aggregation Report Data To Non BSC Parties View summary Ofgem
Change Proposal Implemented N/A 7 Nov 2001 CP0722 Special Case' DAA Termination View summary
Change Proposal Implemented ELEXON 7 Nov 2001 CP0721 Enhancements to BSCP509 "Changes to Market Domain Data" View summary
Change Proposal Superseded ELEXON 7 Nov 2001 CP0720 FAA's Involvement in Market Entry Process View summary
Change Proposal Withdrawn ELEXON 7 Nov 2001 CP0719 Formalisation of Manual Interactions for Credit Cover View summary
Change Proposal Implemented N/A 6 Nov 2001 CP0718 SVAA SL310 - Defaulting Temperature Data Rules View summary
Change Proposal Withdrawn British Gas Trading 2 Nov 2001 CP0717 Automated Meter Reading View summary
Modification Implemented National Grid 1 Nov 2001 P048 Half Hourly Receipt And Publication Of BSAD Data View summary Ofgem
Modification Implemented BSC Panel 31 Oct 2001 P049 Timing Of Publication Of Indicative P18 Option A Prices On The B.M.R.S View summary Ofgem
Modification Rejected BSC Panel 24 Oct 2001 P047 Termination Process for ECVAA and MVRNA Authorisations View summary Ofgem
Change Proposal Implemented ELEXON 24 Oct 2001 CP0716 Change of tenancy and annual calculation of Load Factors View summary
Change Proposal Implemented N/A 24 Oct 2001 CP0715 Clarification of HHDA data anomaly check View summary
Change Proposal Implemented ELEXON 24 Oct 2001 CP0714 Clarifications to Meter Read Audit Trail View summary
Modification Implemented BSC Panel 23 Oct 2001 P046 Housekeeping Modification View summary Ofgem
Modification Implemented BSC Panel 19 Oct 2001 P045 Introduction of Price Adjusters for Settlement Days 5 April 2001 to 24 September 2001 inclusive View summary Ofgem
Change Proposal Implemented ELEXON 16 Oct 2001 CP0713 Correction to ECVAA Service Description View summary
Change Proposal Implemented N/A 15 Oct 2001 CP0712 Making Transmission Company Reports Available View summary
Modification Rejected Powergen 8 Oct 2001 P044 Correction of Notification Errors where Parties are able to satisfy a Reasonable and Prudent Operator test View summary Ofgem
Change Proposal Implemented N/A 8 Oct 2001 CP0711 Generate an exception error if EAC/AA receives NULL Meter Advance in EAC/AA Request File View summary
Modification Rejected Western Power Distribution 1 Oct 2001 P043 Provision of Annualised Advance (AA) and Estimated Annual Consumption (EAC) Data View summary Ofgem
Change Proposal Implemented N/A 1 Oct 2001 CP0710 Updating PCSec Keys & FTP Account Passwords View summary
Change Proposal Withdrawn ELEXON 1 Oct 2001 CP0709 Alignment of the use of Participation Capacity in BSCP65 View summary
Modification Withdrawn Utility Link Ltd. 27 Sept 2001 P042 Allow Appointment Of different HHDCs For Import & Export Meters View summary Ofgem
Modification Rejected Utility Link Ltd. 27 Sept 2001 P041 Allocation Of individual NHH MPANs To different BM Units View summary Ofgem
Change Proposal Implemented ELEXON 27 Sept 2001 CP0708 Inconsistency R014A in NDFC with Logica IDD View summary
Change Proposal Rejected ELEXON 27 Sept 2001 CP0707 Inconsistency Between the BMRA and NGC Interface View summary
Change Proposal Rejected Powergen UK plc 27 Sept 2001 CP0706 Provision of SVA HH Data by accredited sources View summary
Change Proposal Rejected Powergen UK plc 27 Sept 2001 CP0705 Provision of SVA Meter Advance Register data by Suppliers View summary
Modification Rejected SEEBOARD 25 Sept 2001 P040 Calculation of Negative Estimates of Annual Consumption (EAC) View summary Ofgem
Change Proposal Implemented ELEXON 25 Sept 2001 CP0704 Re-badging of the SVA Data Catalogue View summary
Change Proposal Implemented ELEXON 24 Sept 2001 CP0703 Inconsistencies in the Credit Default Process View summary
Modification Implemented BSC Panel 20 Sept 2001 P039 Improvements To The Administration Of The Payment Default Process View summary Ofgem
Modification Rejected Slough Energy Supplies Limited 19 Sept 2001 P038 Redefined Definition Of C A D To Allow Prompt Price Reporting View summary Ofgem
Change Proposal Implemented Cap Gemini 18 Sept 2001 CP0702 Operability Changes to Data Marshalling Software View summary
Change Proposal Withdrawn N/A 17 Sept 2001 CP0701 Missing SVA Metering System Details View summary
Change Proposal Withdrawn SEEBOARD 13 Sept 2001 CP0700 Calculation of Negative EAC by the EAC/AA System View summary
Modification Implemented London Electricity plc 11 Sept 2001 P037 To provide for the remedy of past errors in Energy Contract Volume Notifications and in Metered Volume Reallocation Notifications View summary Ofgem
Modification Rejected Innogy plc 10 Sept 2001 P036 The generation of Bid-Offer Acceptances relating to energy delivered as a result of providing Applicable Balancing Services View summary Ofgem
Change Proposal Implemented N/A 7 Sept 2001 CP0699 Inconsistencies in Provision of Monitoring Reports View summary
Change Proposal Implemented ELEXON 7 Sept 2001 CP0698 Enhancements to Instruction Processing Rules View summary
Change Proposal Withdrawn ELEXON 7 Sept 2001 CP0697 Removal of Inconsistency in BSCP75 View summary
Change Proposal Implemented ELEXON 7 Sept 2001 CP0696 Application of Default if no Consumption Data Available View summary
Change Proposal Implemented ELEXON 7 Sept 2001 CP0695 Additional Authorisations with BSCP38 for SVA Processes View summary
Change Proposal Implemented N/A 7 Sept 2001 CP0694 Inconsistency relating to Transferred Data View summary
Change Proposal Withdrawn ELEXON 6 Sept 2001 CP0693 Allow (HHDA) to apply default where no data provided by HHDC. View summary
Modification Rejected APX 5 Sept 2001 P035 Qualified ECVNAs View summary Ofgem
Change Proposal Superseded N/A 4 Sept 2001 CP0692 Increase Array Size within Logging Application View summary
Change Proposal Implemented ELEXON 3 Sept 2001 CP0691 Revised Proving & Validation Rules View summary
Change Proposal Implemented N/A 3 Sept 2001 CP0690 Clarifications/Improvements to Unmetered Supplies View summary
Change Proposal Implemented Cap Gemini 30 Aug 2001 CP0689 Increase Array Size within Logging Application View summary
Change Proposal Implemented N/A 24 Aug 2001 CP0688 Changes to SAA URS View summary
Change Proposal Implemented N/A 24 Aug 2001 CP0687 Changes to BMRA for ECVAA Interim Release View summary
Change Proposal Implemented N/A 24 Aug 2001 CP0686 Changes to NDFC for ECVAA Interim Release View summary
Change Proposal Implemented N/A 24 Aug 2001 CP0685 Changes to SAA Service Description for ECVAA Interim Release View summary
Change Proposal Superseded ELEXON 24 Aug 2001 CP0684 Changes to Categories of Market Organisations View summary
Change Proposal Withdrawn Western Power Distribution 23 Aug 2001 CP0683 Provision of EACs to PDSO View summary
Change Proposal Implemented N/A 23 Aug 2001 CP0682 Upgrade to the ISRA/SVAA software to Oracle 9i View summary
Change Proposal Implemented ELEXON 23 Aug 2001 CP0681 New Measure for NHH BMU Allocation Process View summary
Change Proposal Implemented N/A 21 Aug 2001 CP0680 Enhancements to Standing Data Change Form View summary
Change Proposal Implemented N/A 20 Aug 2001 CP0679 Removal of Inconsistency from BSCP07 View summary
Change Proposal Implemented ELEXON 20 Aug 2001 CP0678 Inconsistency between BSC & the Reporting Catalogue View summary
Modification Rejected National Grid 14 Aug 2001 P034 Transfer of imbalances caused by Balancing Services to the Transmission Company Energy Account View summary Ofgem
Change Proposal Withdrawn ELEXON 14 Aug 2001 CP0677 Capitalizing of term "meter period value" in SL130 View summary
Change Proposal Withdrawn ELEXON 14 Aug 2001 CP0676 Changes to CoP 3 for HHTAG Recommendations View summary
Change Proposal Implemented N/A 14 Aug 2001 CP0675 Errors in install.log upon installation. View summary
Change Proposal Implemented N/A 14 Aug 2001 CP0674 Amend NHHDA Logical Design for CP628 View summary
Change Proposal Implemented N/A 14 Aug 2001 CP0673 Amend NHHDA Physical Design for CP628 View summary
Change Proposal Withdrawn N/A 13 Aug 2001 CP0672 Changes to CoP 4 for HHTAG Recommendations. View summary
Change Proposal Withdrawn N/A 13 Aug 2001 CP0671 Changes to CoP 5 for HHTAG Recommendations View summary
Change Proposal Withdrawn ELEXON 13 Aug 2001 CP0670 Changes to CoP 6 for HHTAG Recommendations View summary
Change Proposal Implemented ELEXON 13 Aug 2001 CP0669 HHTAG Recommendations for CoP 7 Version 1 View summary
Change Proposal Implemented ELEXON 13 Aug 2001 CP0668 When box needs clarifying View summary
Change Proposal Implemented ELEXON 13 Aug 2001 CP0667 Change to section 3.7.7 (item c) of BSCP508 View summary
Change Proposal Withdrawn ELEXON 13 Aug 2001 CP0666 Amendments to AP508 View summary
Change Proposal Implemented ELEXON 13 Aug 2001 CP0665 Removal of Obligation for MDD Manual Data flows View summary
Modification Implemented National Grid 10 Aug 2001 P033 Rectification of inconsistencies in terminology between the BSC and Grid Code OC2 View summary Ofgem
Change Proposal Superseded ELEXON 10 Aug 2001 CP0664 Addition of field "GSP Group ID" in form "AP507/01 View summary
Change Proposal Implemented ELEXON 26 Jul 2001 CP0663 NHHDA Archiving Software Defect OR 3139 View summary
Change Proposal Implemented ELEXON 24 Jul 2001 CP0662 Revise timescales for Annual/Ad-hoc LLF Loads View summary
Change Proposal Implemented N/A 24 Jul 2001 CP0661 BSCP65 - MDD Updates: Supplier Stops Trading View summary
Change Proposal Implemented N/A 24 Jul 2001 CP0660 Amendment to SSL330 Relating to Response Times View summary
Change Proposal Implemented ELEXON 20 Jul 2001 CP0659 Issues with ISRA Archiving View summary
Change Proposal Implemented N/A 20 Jul 2001 CP0658 Amendments to the Acceptance Test Pack for ISRA/SVAA Archiving Project View summary
Change Proposal Superseded N/A 20 Jul 2001 CP0657 Amendments to ISRA/SVAA System Management Guide View summary
Change Proposal Superseded N/A 20 Jul 2001 CP0656 Amendments to ISRA/SVAA Operations Guide View summary
Change Proposal Superseded N/A 20 Jul 2001 CP0655 Amendments to ISRA/SVAA Physical Design View summary
Change Proposal Superseded N/A 20 Jul 2001 CP0654 Amendments to ISRA/SVAA Logical Design View summary
Change Proposal Superseded N/A 20 Jul 2001 CP0653 Amendments to SSL320 for ISRA/SVAA Archiving Project View summary
Change Proposal Superseded N/A 20 Jul 2001 CP0652 Amendments to ISRA/SVAA URS View summary
Change Proposal Superseded N/A 20 Jul 2001 CP0651 Amendments to ISRA/SVAA software View summary
Modification Withdrawn AES Fifoots Point Ltd 17 Jul 2001 P032 Limited Redefinition Of B M Units View summary Ofgem
Modification Withdrawn Greenwich Energy Trading Limited 16 Jul 2001 P031 Waiving Of Charges Under Annex D3 For Parties Who Are Setting Up Their Operations During The Commissioning Periods With Effect From 27 March 2001 View summary Ofgem
Modification Implemented Utilyx 12 Jul 2001 P030 Availability Of Market Information To B.S.C. Parties And Non-B.S.C. Parties View summary Ofgem
Modification Rejected Utility Link Ltd. 11 Jul 2001 P029 Improve Efficiency Of PARMS Reporting Requirements View summary Ofgem
Change Proposal Withdrawn N/A 9 Jul 2001 CP0650 Changes to the Acceptance Test Pack for NHHDA V7.2.0 View summary
Change Proposal Implemented N/A 9 Jul 2001 CP0649 Changes to NHHDA Instruction Processing Specification View summary
Change Proposal Implemented N/A 9 Jul 2001 CP0648 OR3106 - The Special Case DAA is not Validating Correctly View summary
Change Proposal Withdrawn ELEXON 4 Jul 2001 CP0647 Removing/Mitigating Effect of Sys Balancing Actions (MP18) View summary
Modification Implemented Dynegy 3 Jul 2001 P028 Review of Governance and Modification Procedures View summary Ofgem
Modification Rejected Electricity Direct 26 Jun 2001 P027 Amendment To The Derivation Of Imbalance Prices View summary Ofgem
Change Proposal Withdrawn N/A 26 Jun 2001 CP0646 Accreditation of ECVNA and MVRNA Registrations View summary
Modification Rejected BizzEnergy 25 Jun 2001 P026 Market-Driven Trading Neutrality Band View summary Ofgem
Modification Rejected BP 25 Jun 2001 P025 Commissioning Status In NETA View summary Ofgem
Modification Amalgamated Dynegy 22 Jun 2001 P024 Review Of The Modification Procedures View summary Ofgem
Modification Amalgamated Dynegy 22 Jun 2001 P023 Review Of The Imbalance Settlement Group (ISG). View summary Ofgem
Modification Implemented Dynegy 22 Jun 2001 P022 The Provision Of Generator Planned Outage Information to All BSC Signatories. View summary Ofgem
Change Proposal Implemented N/A 22 Jun 2001 CP0645 Incorrect Default Rules for missing DA Data View summary
Change Proposal Withdrawn ELEXON 21 Jun 2001 CP0644 Extension To Selection Criteria for MP18 View summary
Modification Amalgamated Amerada Hess Gas Limited 20 Jun 2001 P021 Review of Modification Group and Panel Procedures View summary Ofgem
Change Proposal Implemented ELEXON 20 Jun 2001 CP0643 Modification P10 - Removing De Minimis Acceptances View summary
Change Proposal Implemented N/A 19 Jun 2001 CP0642 Enduring Process to Replace W016 View summary
Change Proposal Withdrawn N/A 19 Jun 2001 CP0641 Enduring Process to replace WA021 View summary
Change Proposal Withdrawn N/A 19 Jun 2001 CP0640 Change to CDCA URS View summary
Change Proposal Implemented N/A 19 Jun 2001 CP0639 Handling of Missing or Invalid Data (SAA) View summary
Change Proposal Withdrawn ELEXON 19 Jun 2001 CP0638 HH Estimation Using Physical Meter Readings View summary
Change Proposal Implemented ELEXON 14 Jun 2001 CP0637 Meter Serial Number Field Length (CDCA) View summary
Change Proposal Rejected N/A 13 Jun 2001 CP0636 Inconsistencies in BSCP28 View summary
Change Proposal Superseded ELEXON 13 Jun 2001 CP0635 Inconsistencies between the BSC & CRA URS View summary
Change Proposal Implemented N/A 13 Jun 2001 CP0634 Inconsistency between IDD, NDFC & Reporting Catalogue View summary
Change Proposal Superseded ELEXON 13 Jun 2001 CP0633 Bid-Offer records within Settlement Report View summary
Change Proposal Implemented ELEXON 13 Jun 2001 CP0632 Inconsistencies in SAA URS View summary
Change Proposal Implemented ELEXON 13 Jun 2001 CP0631 Inconsistencies in the BMRA URS View summary
Change Proposal Implemented ELEXON 13 Jun 2001 CP0630 Inconsistency in BSCP01 View summary
Change Proposal Implemented ELEXON 13 Jun 2001 CP0629 Inconsistencies between the BSC & the CDCA URS View summary
Modification Rejected London Electricity plc 11 Jun 2001 P019 To provide for the remedy of errors in Energy Contract Volume Notifications and in Metered Volume Reallocation Notifications View summary Ofgem
Change Proposal Implemented ELEXON 11 Jun 2001 CP0628 Design Deficiency in Non Half Hourly Data Aggregator (NHHDA) View summary
Change Proposal Withdrawn ELEXON 8 Jun 2001 CP0627 Changes to BSCP301 View summary
Change Proposal Rejected ELEXON 8 Jun 2001 CP0626 Out of Sequence File Handling View summary
Change Proposal Withdrawn ELEXON 7 Jun 2001 CP0625 Inconsistencies between the BSC and the BMRA URS View summary
Change Proposal Superseded ELEXON 7 Jun 2001 CP0624 Change to BSCP05 View summary
Change Proposal Superseded ELEXON 7 Jun 2001 CP0623 Change to BSCP03 View summary
Change Proposal Withdrawn 7 Jun 2001 CP0622 Changes to the NETA Data File Catalogue View summary
Change Proposal Withdrawn 7 Jun 2001 CP0621 Changes to BSCP20 View summary
Change Proposal Withdrawn ELEXON 7 Jun 2001 CP0620 Receipt of CDCA-I050 View summary
Change Proposal Implemented ELEXON 7 Jun 2001 CP0619 Amendments to TAA URS View summary
Change Proposal Withdrawn ELEXON 7 Jun 2001 CP0618 Changes to the CDCA URS View summary
Change Proposal Withdrawn ELEXON 7 Jun 2001 CP0617 Inconsistencies between the BSC & the Reporting Catalogue View summary
Change Proposal Withdrawn ELEXON 6 Jun 2001 CP0616 Service Levels for the Reporting of data to NGC by Logica View summary
Change Proposal Implemented ELEXON 6 Jun 2001 CP0615 Alignment of the CRA URS with the BSC View summary
Change Proposal Implemented ELEXON 6 Jun 2001 CP0614 BSCP32: Metering Dispensations - Consultation comments View summary
Change Proposal Withdrawn ELEXON 6 Jun 2001 CP0613 FAA Bad Debt Processing View summary
Change Proposal Withdrawn ELEXON 6 Jun 2001 CP0612 Changes to the CRA URS View summary
Change Proposal Withdrawn ELEXON 6 Jun 2001 CP0611 Inconsistencies between the CRA URS and BSCP65 View summary
Change Proposal Implemented ELEXON 6 Jun 2001 CP0610 IDD Documentation Errors and Inconsistencies View summary
Change Proposal Implemented ELEXON 6 Jun 2001 CP0609 Visual Inspection of Metering Systems - Changes to BSCP05 View summary
Change Proposal Implemented ELEXON 6 Jun 2001 CP0608 Improvements to BSCP509 View summary
Change Proposal Rejected ELEXON 6 Jun 2001 CP0607 Error Messaging View summary
Change Proposal Rejected ELEXON 6 Jun 2001 CP0606 Support for PCSec under Windows 2000 View summary
Change Proposal Rejected ELEXON 6 Jun 2001 CP0605 UNIX Version of PCSec View summary
Change Proposal Withdrawn ELEXON 6 Jun 2001 CP0604 Removal of restriction on Polling Interval View summary
Change Proposal Withdrawn ELEXON 6 Jun 2001 CP0603 PCSec as a Windows NT Service View summary
Change Proposal Rejected ELEXON 6 Jun 2001 CP0602 Three Enhancements for PCSec View summary
Change Proposal Withdrawn ELEXON 5 Jun 2001 CP0601 Utilisation of Interconnector Error Administrator BMUs View summary
Change Proposal Withdrawn N/A 5 Jun 2001 CP0600 BSCCo Ltd as a Recipient of SAA-I014 Sub flow 2. View summary
Change Proposal Rejected N/A 5 Jun 2001 CP0599 Non Unique ECVN / MVRN Feedback Reports View summary
Change Proposal Implemented ELEXON 5 Jun 2001 CP0598 Procedural problem with BSCP 04 View summary
Change Proposal Implemented ELEXON 5 Jun 2001 CP0597 Changes to SAA-I014 to meet NGC's Audit Requirements View summary
Change Proposal Implemented ELEXON 5 Jun 2001 CP0596 Correction to the SAA URS View summary
Change Proposal Implemented ELEXON 5 Jun 2001 CP0595 Suppression of ELEXON Exception Reports View summary
Change Proposal Superseded ELEXON 5 Jun 2001 CP0594 Incorporation of the manual disputes process in CSDs View summary
Change Proposal Implemented ELEXON 4 Jun 2001 CP0593 Interim Initial Settlement Run (CDCA URS) View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0592 Inconsistencies between Central Services Software and the NDFC View summary
Change Proposal Superseded ELEXON 4 Jun 2001 CP0591 Availability of Transmission Company SAA-I014 Reports View summary
Change Proposal Rejected ELEXON 4 Jun 2001 CP0590 Design enhancements to the standing data process View summary
Change Proposal Implemented ELEXON 4 Jun 2001 CP0589 BMRA BM Unit Identification View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0588 Data Receipt and Validation by the SAA View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0587 Inconsistency for Data Retention Requirements View summary
Change Proposal Rejected ELEXON 4 Jun 2001 CP0586 Notification of Files where decryption has failed View summary
Change Proposal Superseded ELEXON 4 Jun 2001 CP0585 BMRA and SAA Data Corrections to Replace W018 View summary
Change Proposal Implemented ELEXON 4 Jun 2001 CP0584 BSCP26: Policing of Metering Systems for CVA View summary
Change Proposal Superseded ELEXON 4 Jun 2001 CP0583 Clarification of methods for requesting reports under BSCP41 View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0582 Update of Logica TAA Service description View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0581 Update of Logica SAA Service description View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0580 Update of Logica ECVAA Service description View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0579 Update of Logica CDCA Service description View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0578 Update of Logica CRA Service description View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0577 Update of Logica BMRA Service description View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0576 Recording of Transmission Los Factors by Settlement Period View summary
Change Proposal Withdrawn ELEXON 4 Jun 2001 CP0575 Party and Party Agent Authorisations View summary
Change Proposal Rejected N/A 4 Jun 2001 CP0574 Payment & Settlement Calendars View summary
Change Proposal Rejected ELEXON 4 Jun 2001 CP0573 Amendment to BSCP71 View summary
Change Proposal Implemented ELEXON 4 Jun 2001 CP0572 Inconsistencies between the BSC and BSCP01 View summary
Change Proposal Implemented ELEXON 4 Jun 2001 CP0571 Amendments to the ECVAA URS View summary
Change Proposal Implemented ELEXON 1 Jun 2001 CP0570 Aggregation Rule – acknowledgements by CDCA View summary
Change Proposal Implemented ELEXON 1 Jun 2001 CP0569 BSCP20 – Equipment Owners consent View summary
Change Proposal Implemented ELEXON 1 Jun 2001 CP0568 Allocation of BM Units View summary
Change Proposal Implemented ELEXON 1 Jun 2001 CP0567 Inconsistencies in BSCP15 and BSCP20 View summary
Change Proposal Implemented ELEXON 1 Jun 2001 CP0566 IDD & BSCP03 - Consistent originator of flow CDCAI013 View summary
Change Proposal Implemented ELEXON 1 Jun 2001 CP0565 Inconsistencies within BSCP26 View summary
Change Proposal Rejected ELEXON 1 Jun 2001 CP0564 Implementation of short codes for dialling of CVA meters View summary
Change Proposal Implemented ELEXON 1 Jun 2001 CP0563 Inconsistencies in BSCP01 & BSCP03 View summary
Change Proposal Rejected ELEXON 1 Jun 2001 CP0562 Inconsistencies in the CDCA URS View summary
Change Proposal Withdrawn ELEXON 1 Jun 2001 CP0561 Process to Obtain French Interconnector Meter Readings View summary
Change Proposal Implemented ELEXON 31 May 2001 CP0560 Handling of BMRA During BM System Operation Outages View summary
Change Proposal Implemented ELEXON 30 May 2001 CP0559 Inclusion of Settlements Run Type Info in Aggregated Reports View summary
Change Proposal Withdrawn N/A 30 May 2001 CP0558 Removal of Support for D0269 & D0270 version 001 dataflows View summary
Change Proposal Implemented N/A 30 May 2001 CP0557 Income tax processing within the Funds Transfer System View summary
Change Proposal Rejected ELEXON 30 May 2001 CP0556 Participation Capacity Clarification in BSCP65 version 2 View summary
Change Proposal Implemented ELEXON 29 May 2001 CP0555 Amendments to the SAA URS View summary
Change Proposal Implemented ELEXON 29 May 2001 CP0554 Amendments to BSCP301 View summary
Change Proposal Implemented ELEXON 29 May 2001 CP0553 Amendments to FAA URS View summary
Change Proposal Superseded 29 May 2001 CP0552 Enduring Process to replace W016 - CRA Registration Details View summary
Change Proposal Implemented ELEXON 29 May 2001 CP0551 Enduring Process to replace W006 - P0181 flow to SVAA View summary
Change Proposal Withdrawn ELEXON 25 May 2001 CP0550 Addition of Authentication Processes in BSCP38 View summary
Change Proposal Implemented ELEXON 25 May 2001 CP0549 Display duration of BMRA System Warning Messages View summary
Change Proposal Implemented ELEXON 25 May 2001 CP0548 Default Values and Effective Dates for Line Loss Factors View summary
Change Proposal Implemented ELEXON 25 May 2001 CP0547 ECVNA and MVRNA Registration, Authorisation and Termination View summary
Change Proposal Implemented ELEXON 25 May 2001 CP0546 Enduring Solution to replace NETA Workaround 001 View summary
Change Proposal Implemented ELEXON 25 May 2001 CP0545 BSCP07: Standing Data Changes - Consultation comments View summary
Change Proposal Withdrawn ELEXON 25 May 2001 CP0544 Notification and Sealing of Metering Equipment for CVA View summary
Change Proposal Implemented ELEXON 25 May 2001 CP0543 BMRA Browser Support View summary
Change Proposal Withdrawn 24 May 2001 CP0542 BSCP65 - MDD Updates: Supplier Stops Trading View summary
Modification Implemented National Grid 23 May 2001 P018 Removing / Mitigating The Effect Of System Balancing Actions In The Imbalance Price Calculations View summary Ofgem
Modification Implemented Northern Electric plc 23 May 2001 P016 Removal Of Restriction For Submitting Summer Demand Capacity & Generation Capacity View summary Ofgem
Change Proposal Rejected ELEXON 23 May 2001 CP0541 Changes to BMCAEC/BMCAIC View summary
Change Proposal Implemented ELEXON 23 May 2001 CP0540 Adequate ECVAA Delay Functionality View summary
Change Proposal Implemented ELEXON 23 May 2001 CP0539 Disregard Historic ECV Data for on the Day ECVNs View summary
Change Proposal Withdrawn Trading Development 23 May 2001 CP0538 Release 2 of the New Electricity Arrangements View summary
Change Proposal Implemented ELEXON 23 May 2001 CP0537 BMRA Reporting of Historic Market Data View summary
Modification Rejected Vattenfall 22 May 2001 P015 Removal Of Price Spikes Associated With System Balancing From System Prices View summary Ofgem
Modification Rejected National Grid 22 May 2001 P014 Manifest Error Provisions Where the Bid/Offer Acceptance In Question Has Not Been Acted Upon View summary Ofgem
Change Proposal Rejected ELEXON 22 May 2001 CP0536 Parameters for Automatically Generated BM Units View summary
Change Proposal Rejected ELEXON 22 May 2001 CP0535 ECVAA Functionality for MVRNA and ECVNA Authorisations View summary
Change Proposal Withdrawn ELEXON 22 May 2001 CP0534 Disregard Contract Trading Party during Credit Checking View summary
Change Proposal Superseded ELEXON 22 May 2001 CP0533 Clarification of methods for requesting reports under BSCP41 View summary
Change Proposal Implemented ELEXON 22 May 2001 CP0532 SAA-I014: Denominator Value in Residual Cashflow Reallocation View summary
Change Proposal Withdrawn ELEXON 22 May 2001 CP0531 Incorrect Reference in BSCP 507 View summary
Change Proposal Rejected ELEXON 22 May 2001 CP0530 Reporting of CALF Values to ELEXON View summary
Change Proposal Implemented ELEXON 22 May 2001 CP0529 Entry of Negative CALF Values into CRA View summary
Change Proposal Implemented ELEXON 22 May 2001 CP0528 Inconsistency between BSCP15 and BSCP508 View summary
Change Proposal Implemented ELEXON 22 May 2001 CP0527 IDD Part 1 - Documentation Errors and Inconsistencies View summary
Change Proposal Withdrawn ELEXON 22 May 2001 CP0526 To bring Method of Communication required in line with IDD View summary
Change Proposal Withdrawn ELEXON 22 May 2001 CP0525 To bring Method of Communication required in line with IDD View summary
Change Proposal Withdrawn ELEXON 22 May 2001 CP0524 To bring Method of Communication required in line with IDD View summary
Change Proposal Withdrawn ELEXON 22 May 2001 CP0523 To bring Method of Communication required in line with IDD View summary
Change Proposal Withdrawn ELEXON 22 May 2001 CP0522 To bring Method of Communication required in line with IDD View summary
Change Proposal Implemented ELEXON 22 May 2001 CP0521 Inconsistencies between BSCPs and IDD View summary
Change Proposal Rejected ELEXON 22 May 2001 CP0520 Credit Level Naming Inconsistency View summary
Change Proposal Implemented ELEXON 22 May 2001 CP0519 Calculation by the ECVAA of a Trading Party’s ‘MEA’ View summary
Change Proposal Implemented ELEXON 22 May 2001 CP0518 Enhancements to the Non Half Hourly Balancing Mechanism View summary
Change Proposal Superseded ELEXON 22 May 2001 CP0517 Multiple Ad-hoc runs to Settle Disputes View summary
Modification Rejected London Electricity plc 18 May 2001 P020 Revision of Obligations of Parties in Relation to BM Unit Registrations View summary Ofgem
Modification Rejected PowerEx 18 May 2001 P017 ECVNAs To Receive 7 Day Report View summary Ofgem
Change Proposal Implemented N/A 18 May 2001 CP0516 Amend EAC/AA Logical Design for the EAC/AA Release 7 Project View summary
Change Proposal Implemented N/A 18 May 2001 CP0515 Additional error handling for tolerance values View summary
Change Proposal Implemented N/A 18 May 2001 CP0514 Amend EAC/AA System Management Guide for EAC/AA Release 7 View summary
Change Proposal Implemented N/A 18 May 2001 CP0513 Amend EAC/AA Operations guide for the EAC/AARelease7 project View summary
Change Proposal Implemented N/A 18 May 2001 CP0512 Amend the EAC/AA s/w for upgrade to Oracle 8i View summary
Modification Withdrawn Amerada Hess Gas Limited 16 May 2001 P013 Change to Modification Group procedures View summary Ofgem
Change Proposal Implemented ELEXON 11 May 2001 CP0511 CVA Meter Status Reports View summary
Modification Implemented Damhead Creek Limited 9 May 2001 P012 Reduction Of Gate Closure From 3.5 Hours To 1 Hour View summary Ofgem
Modification Rejected The European Power Source Company (UK) Limited 9 May 2001 P011 Revision Of Minimum Credit Cover Requirements View summary Ofgem
Change Proposal Implemented ELEXON 9 May 2001 CP0510 SAA and BMRA System Sell and Buy Price Default Rules View summary
Change Proposal Implemented ELEXON 4 May 2001 CP0509 BSCP68 - Removal of Metering System Transfer restrictions View summary
Modification Implemented National Grid 2 May 2001 P010 Eliminating Imbalance Price Spikes Caused By Truncating Effects View summary Ofgem
Modification Rejected Scottish Power 1 May 2001 P009 Correction Of Technical Error In Respect Of The Energy Contract Volume Notifications Under Section P.2.3 And Adjustment Of Settlement Data Under Section U.2.5. View summary Ofgem
Change Proposal Implemented ELEXON 1 May 2001 CP0508 Submission of registration details changes to BSCCo View summary
Change Proposal Superseded ELEXON 26 Apr 2001 CP0507 Submission of registration details changes to BSCCo View summary
Change Proposal Superseded ELEXON 23 Apr 2001 CP0506 Incorrect estimated settlement data View summary
Change Proposal Rejected ELEXON 23 Apr 2001 CP0505 Changes to the NGC BSAD Methodology Statement for Mod P3 View summary
Modification Implemented National Grid 20 Apr 2001 P008 Introduction Of A Price Adjuster To Reflect Option Fees For Balancing Services Contracts In Setting System Buy Price And System Sell Price View summary Ofgem
Modification Implemented Powergen 18 Apr 2001 P007 Allocation Of Supplier Demand To The Same BM Unit In A GSP Group For All Suppliers In The Same Company Group View summary Ofgem
Change Proposal Implemented ELEXON 18 Apr 2001 CP0503 Ability to change registration details for Party Agents View summary
Change Proposal Implemented ELEXON 18 Apr 2001 CP0502 Correction of qualification procedures View summary
Change Proposal Implemented ELEXON 18 Apr 2001 CP0501 Alignment of NETA Business Process Model with baseline 3.2 View summary
Modification Implemented BSC Panel 5 Apr 2001 P006 Removal Of Obligation To Publish Price Data In Ft View summary Ofgem
Modification Implemented London Electricity plc 28 Mar 2001 P005 Extension Of Indemnity Under Section B2.9 View summary Ofgem
Modification Implemented Dynegy 28 Mar 2001 P004 Dual Energy Contract Notification View summary Ofgem
Modification Rejected Electricity Direct 27 Mar 2001 P003 Correction Of Price Spikes Generated By De-Minimis NGC Purchases View summary Ofgem
Modification Implemented British Gas 27 Mar 2001 P002 Revision Of The Methodology For Assessing Credit Indebtedness. View summary Ofgem
Modification Rejected OM London Exchange Ltd 27 Mar 2001 P001 Extension Of The Definition Of ECVAA Systems Failure For Permitting Post Gate Closure Notification View summary Ofgem