← Distribution Code
DCRP/MP/22/03Code Administrator Consultation
DCRP/MP/22/03: - EREC P2 Issue 8
What is being proposed
This Distribution Code modification was raised to consider whether changes should be made to Engineering Recommendation P2 Issue 7 to allow the reduction of the minimum security of supply to customers supplied via high voltage feeders supplying demand between 1 and 10MW in a limited number of targeted situations. The public consultation on the modification closed 29 July 2022This modification is being run in parallel with DCRP/MP/22/04.DCRP/22/03/PC - Consultation PackDCRP/MP/22/03 - RTADCRP/MP/22/03 - Decision Letter
Details
Timeline
Proposal raised29 Jul 2022✓
Analysis
Distribution Code code modification. See the codes page for full details.