DCRP/MP/25/03: EREC G87/3
What is being proposed
This Distribution Code modification relates to the changes proposed to Engineering Recommendation (EREC) G87 Issue 3 . This version was reviewed as part of the Technical Author Service (TAS) provided by Energy Networks Association’s (ENA). DCRP/MP/25/03 Consultation Pack
Details
Analysis
DCRP/MP/25/03 proposes modifications to Engineering Recommendation G87 Issue 3, a technical standard governing electrical connections to distribution networks. The modification has been reviewed by ENA's Technical Author Service and is now under consultation. G87 sets technical requirements for equipment connecting to distribution networks.
Why it matters
This appears to be a routine technical update to connection standards rather than structural reform. Without access to the specific changes proposed, the impact on connection costs or processes remains unclear, though G87 modifications typically affect equipment specifications for new connections.
Key facts
- •Published 2026-03-29
- •Relates to EREC G87 Issue 3
- •Reviewed by ENA Technical Author Service