NESOOFGEMDESNZ
Distribution Code
DCRP/MP/18/03Code Administrator Consultation

DCRP/MP/18/03: - P2/7 Security of Supply

Distribution Code·notice·LOW·13 Mar 2018·source document

What is being proposed

Last Updated: 01/04/2019StatusProposerThe Distribution Code Review Panel - www.dcode@energynetworks.org020 7706 5105SummaryENA EREC P2 is a planning standard and an Annex 1 document to the Distribution Code. The proposed modification of this document has been written to recognise the changes to the load and generation connected to distribution networks since EREC P2/6 was published in 2006. In particular it recognises that:ImpactConsultationThe Distribution Code public consultation sought views from industry stakeholders on the modification to both the ‘DCode’ and Engineering Recommendation (EREC) P2/7. It was published on the 13 March 2018 with a deadline for responses by 19 April 2018.DCRP/18/03/PC Consultation PackEREC P2 Report to Authority May 2018EREC P2 Report to Authority Annexes May 2018Authority Decision

Details

Timeline

Proposal raised13 Mar 2018

Analysis

Distribution Code code modification. See the codes page for full details.