NESOOFGEMDESNZ
Distribution Code
DCRP/MP- ModificatioWorkgroup

DCRP/MP- Modificatio: DCRP/MP- Modification to ER G59/3-1

Distribution Code·notice·LOW·29 Mar 2026·source document

What is being proposed

This modification resulted in the revocation of Section 12.4 (f) where It is no longer a requirement to undertake an additional functional check of the LoM protection by removing one phase of the supply to the Generating Unit. A revision to section 12.3.1 (g) was undertaken to include the provision of two options to carry out a functional test confirming that the Interface Protection has operated. The modification also included minor updates to the Testing of RoCoF elements in Appendix 13.3. A discrepancy was also corrected between the wording contained in Section 12.4 and the testing requirements contained in Appendix 13.3 on how to undertake the test. Some minor typos were also corrected. ER G59/3-2 (2015) was published September 2015.DCRP G59/3-1 Modification – Report to Authority – June 2015G59/3-1 – Authority Decision Letter – August 2015

Details

Analysis

Distribution Code code modification. See the codes page for full details.