NESOOFGEMDESNZ
Distribution Code
DCRP/GC0106Code Administrator Consultation

DCRP/GC0106: - Implementation of the EU NC System Operation Guidelines

Distribution Code·notice·LOW·29 Mar 2026·source document

What is being proposed

Last Updated: 01/04/2019StatusProposerThe Distribution Code Review Panel - www.dcode@energynetworks.org020 7706 5105SummaryThis modification is to ensure that the data exchange provisions within the Distribution Code are compliant with the requirements of the European Network Code – Transmission System Operation Guideline (SOGL) and of the KORRR.ImpactConsultationThe Distribution Code public consultation sought views from industry stakeholders on the modification to both the ‘DCode’. It was published on the 2018 with a deadline for responses by 2018.DCRP/18/01/PC Consultation PackDCRP/GC0106 - Report to AuthorityAuthority Decision

Details

Analysis

Distribution Code code modification. See the codes page for full details.