NESOOFGEMDESNZ
Distribution Code
DCRP/MP/18/01Code Administrator Consultation

DCRP/MP/18/01: - EREC P28

Distribution Code·notice·LOW·8 Jan 2018·source document

What is being proposed

Last Updated: 01/04/2019StatusProposerThe Distribution Code Review Panel - www.dcode@energynetworks.org020 7706 5105SummaryThe proposed EREC P28 Issue 2 constitutes a full technical revision of Issue 1 published in 1989 and has been extended, amongst other things, to cover assessment and limits for rapid voltage changes (RVCs).The review and subsequent revision of EREC P28 has been overseen by a joint Working Group of various key stakeholders with co-ordination provided by the Energy Networks Association (ENA).ImpactConsultationThe Distribution Code public consultation sought views from industry stakeholders on the modification to both the ‘DCode’ and Engineering Recommendation (EREC) P28. It was published on the 8 January 2018 with a deadline for responses by 31 January 2018.DCRP/18/01/PC Consultation PackAuthority Decision

Details

Timeline

Proposal raised8 Jan 2018

Analysis

Distribution Code code modification. See the codes page for full details.