DCRP/MP/18/05: - European Network Code – Demand Connection Code (DCC)
What is being proposed
StatusProposerThe Distribution Code Review Panel - www.dcode@energynetworks.org020 7706 5105SummaryThis modification will set out within the Distribution Code and Grid Code the following compliance obligations in the European Network Code – Demand Connection Code (DCC)1. Technical requirements for New* Transmission-connected Demand Facilities; Transmission-connected Distribution Facilities and Distribution Systems.2. Technical requirements for Demand Units used by a Demand Facility or a Closed Distribution System to provide Demand Response Services to System Operators.* ‘New’ is defined as not being connected to the system at the time that the code enters into force and not having concluded a final and binding contract for the purchase of main plant items by two years after entry into force.ImpactConsultationA GC0104 consultation on the development of the proposals for the Grid and Distribution Codes was undertaken from 8 March 2018 to 29 March 2018.Feedback from the formal consultation in March, together with some specific discussions with stakeholders on their response to that consultation, were used to develop the draft of the Distribution Code for the consultation that ran from 17 May to 08 June 2018.DCRP/18/05/PC Consultation PackReport to AuthorityReport to Authority AppendicesAuthority Decision
Details
Timeline
Analysis
Distribution Code code modification. See the codes page for full details.