← Smart Energy Code
DP318Workgroup
DP318: Incorporation of Category 3 Issue Resolution Proposal into the SEC – Batch 12 and GBCS Changes
What is being proposed
Where a UTRN has been sent from the PPMID to the meter the meter will apply the UTRN and send one message to the energy Supplier and a second message to the PPMID informing of the successful top-up. If the meter detects a duplicate UTRN, then the meter will not send a message to the energy Supplier, or the PPMID.
Details
Proposed byDCC
Decision byPanel (Self-Governance)
GovernanceSelf-Governance
Impact onOther
Timeline
Proposal raised10 Mar 2026✓
Analysis
SEC code modification. See the codes page for full details.