← Distribution Code
DCRP/MP/22/05Workgroup
DCRP/MP/22/05: - Customer Islanding
What is being proposed
This modification was raised to assess and provide guidance on Customer Islanding of single premises connected to the GB Distribution System and consider the required guidance relating to safe detection, operation and re-synchronisation of the installation once supply can be safely reinstated. This process must be available through a manual process for customers who wish to island their installations voluntarily. These requirements are proposed to be included into Engineering Recommendation G99.Legal Text is currently under development.
Details
Analysis
Distribution Code code modification. See the codes page for full details.