Grid Code (GC) GC0154: incorporation of interconnector ramping requirements into the Grid Code as per System Operator Guidelines Article 119

OFGEM·decision·low·15 Mar 2024·source document

Summary

Ofgem approved a Grid Code modification requiring interconnectors to meet standardised ramping requirements under EU System Operator Guidelines Article 119. The decision implements the Workgroup alternative rather than the original proposal. This codifies technical requirements that interconnectors must already meet under retained EU law.

Why it matters

The change is administrative — it moves existing technical obligations from EU regulation into domestic Grid Code without altering interconnector operation or market access. As such, it represents regulatory housekeeping rather than market reform.

Key facts

  • Decision published 15 March 2024
  • Implements EU System Operator Guidelines Article 119
  • Workgroup alternative approved over original proposal

Areas affected

grid connectionstransmission
Memo

Grid Code (GC) GC0154: incorporation of interconnector ramping requirements into the Grid Code as per System Operator Guidelines Article 119 | Ofgem Please enable JavaScript in your web browser to get the best experience. BETA This site is currently in BETA. Help us improve by giving us your feedback . Close alert: Grid Code (GC) GC0154: incorporation of interconnector ramping requirements into the Grid Code as per System Operator Guidelines Article 119 Publication type: Decision Publication date: 15 March 2024 Topic: Offshore electricity transmission, Electricity interconnectors Print this page Share the page Share on Facebook Share on Twitter Share on LinkedIn Grid Code Modification GC0154 proposes the incorporation of interconnector ramping requirements into the Grid Code, as per System Operator Guidelines (SOGL) Article 119. The modification contains an Original Proposal and a Workgroup alternative proposal. This document outlines our decision to approve the Workgroup alternative modification proposal. Main document GC0154 Decision Letter [PDF, 228.14KB] Print this page Share the page Share on Facebook Share on Twitter Share on LinkedIn Close