PM0153: System Access Reform. Emergency Return to Service (ERTS): Profiling Review. | National Energy System Operator
Summary
NESO has raised PM0153 to revisit the criteria for recalling transmission circuits with longer Emergency Return to Service (ERTS) times during winter. The modification mandates use of a Winter Risk Policy Form to document system margins, constraints, mitigations, and recall plans, with the aim of clearing more winter outages without breaching security standards. It is self-assessed as low impact on Transmission Owners, Transmission Licensees, Generators, and System Operators, with a Panel Decision governance route.
Why it matters
The change is a procedural tightening of outage management to push more winter maintenance through without triggering security breaches, which matters because the Transmission Acceleration Action Plan needs network reinforcement done at the same time as the system runs tighter margins. The unseen cost sits with generators who may be recalled from longer ERTS at short notice, trading a documented Winter Risk Policy for genuine flexibility on when circuits can be taken out.
Key facts
- •Modification reference PM0153 under System Access Reform workstream
- •Status: Proposal Raised (as of 20 February 2026)
- •Governance route: Panel Decision
- •Mandates Winter Risk Policy Form documenting margins, constraints, mitigations, recall plans
- •Self-assessed as Low impact on TOs, TLs, generators, and SOs
- •Proposer: Maria Lopez (NESO)
- •Justified by reference to Transmission Acceleration Action Plan and 2030 clean-power goals
Areas affected
Related programmes
Memo
PM0153: System Access Reform. Emergency Return to Service (ERTS): Profiling Review. | National Energy System Operator Show/Hide Menu Toggle Add to favourites Close tooltip Sign in to add this page to your favourites Sign in or register Show favourites Close Close tooltip Sign in or register to manage your favourites Sign in or register Help You are now signed in Visit My NESO account to view and manage your dataset subscriptions. Maybe later Go to your account PM0153: System Access Reform. Emergency Return to Service (ERTS): Profiling Review. This modification revisits the criteria for recalling of circuits with longer Emergency Return to Service (ERTS) to help secure the transmission system during the winter periods. It mandates the Winter Risk Policy Form to document system margins, constraints, mitigations, and recall plans. By aligning with proven operational methods, this change enables to progress more winter outages securely, supporting the Transmission Acceleration Action Plan and 2030 clean-power goals. Modification status: Current - Proposal Raised Last updated: 20 February 2026 Code Administrator Contact: [email protected] Governance Route: Panel Decision Impacts: Low impact on Transmission Owners, Transmission Licensees, Generators, and System Operators. Code modification proposed by: Maria Lopez [email protected] Documents Proposal Documents Name PM0153 Proposal Form and Annexes Proposal Documents logo--facebook