DESNZ·data_release·LOW·6 May 2026·source document

Summary

DESNZ publishes its quarterly heat networks pipeline, listing government-supported district and communal heating projects across England and Wales. The database tracks roughly 50 schemes from planning through construction to operation, mostly gas-fired CHP and heat pump systems serving residential and mixed-use developments. This is a heat sector transparency exercise with no direct bearing on electricity market rules, grid connections, or network charging.

Why it matters

Heat networks are a parallel decarbonisation track that does not change electricity market structure. The data confirms continued reliance on gas CHP in new district heating, which locks in gas demand rather than electrifying heat.

Key facts

  • Database covers Feb-Apr 2026 planning data across England, Wales, and Scotland
  • Majority of schemes use gas-fired CHP as primary technology
  • Several mine-water and ground-source heat pump schemes in North East England
  • Projects range from 3 connections (Earlston) to 5,500 (Woodberry Down, Hackney)
Memo10,000 words

Government supports the growth of the UK heat networks market as a crucial part of the UK’s heat decarbonisation journey. Providing accurate information on the market and signposting upcoming projects to investors is essential for developers and other partners within the heat networks supply chain. These pipelines contain overviews of projects and upcoming procurements that are currently being supported by government. We provide the most up-to-date information available to us, but it represents a single point in time, typically a quarterly extract or consultant’s report (the year data is received is noted). Attached documents: the Project Pipeline shows a broad overview of government supported projects, brings together heat network investment opportunities in England and Wales. It includes one page summaries of each project that includes a project description and other data including forecast financial information the Procurement Pipeline provides information about upcoming procurement opportunities on heat networks projects supported by government funding and projects by HeatNIC members the Heat Networks Planning Database ( HNPD ) provides a picture of heat network deployment across the UK based on planning applications. It tracks the progress of projects through multiple stages including inception, planning, construction, operation and decommissioning. This interactive map of the HNPD data shows the geographical spread of heat network projects Through publishing these documents, we aim to: provide an overview of the pipeline of the heat networks projects across England and Wales enable potential sources of finance to assess the scale of the sector facilitate conversations enable new finance to enter the sector If you’re an investor or new entrant and would like further information or if you would like to provide feedback on how we could improve these documents, please contact us at heatnetworks@energysecurity.gov.uk using Heat Networks pipelines in the title. For the Heat Networks Planning Database, if you have information about a heat network scheme not included in the database, spot any inaccuracies, or have any feedback, please let us know by email to HNPD .enquiries@energysecurity.gov.uk . ### Heat Networks Planning Database (HNPD): February 2026 - April 2026 (CSV) | Ref ID | Record Last Updated (dd/mm/yyyy) | Operator (or Applicant) | Site Name | Connection to communal, district or campus heat network | New, renovation or expansion of existing heat network | Number of customer connections | Types of Building (domestic, non domestic or mixed) | Types of buildings | Technology Type | Secondary plant technology | Third plant technology | Backup plant technology | Installed Capacity (MWelec) | Primary Fuel type | Heat Source | Temperature of heat supply (Celsius) | Heat Storage | Heat Storage (Volume m3) | Heat Enabled | Cooling Enabled | CHP Enabled | Length of distribution network in m | Average diameter of pipes in mm | Development Status | Development Status (short) | Are they re-applying (New REPD Ref) | Are they re-applying (Old REPD Ref) | Address | County | Region | Country | Post Code | X-coordinate | Y-coordinate | Planning Authority | Planning Application Reference | Appeal Reference | Secretary of State Reference | Type of Secretary of State Intervention | Judicial Review | | | Planning Application Submitted | Planning Application Withdrawn | Planning Permission Refused | Appeal Lodged | Appeal Withdrawn | Appeal Refused | Appeal Granted | Planning Permission Granted | Secretary of State - Intervened | Secretary of State - Refusal | Secretary of State - Granted | Planning Permission Expired | Under Construction | | | Operational | Decommissioned / Abandoned / No Application Made | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 5726 | 12/06/2023 | Scottish Borders Council | High Street, Earlston - Community Campus | Communal | New | 3 | Non Domestic | Nursery, Medical Centre, Library | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Under Construction | Under Construction | | | High Street, Earlston | Borders | Scotland | Scotland | TD4 6JQ | 357768 | 638464 | Scottish Borders | 21/01797/FUL | | | | | | | 16/11/2021 | | | | | | | 28/04/2022 | | | | | 12/06/2023 | | 12/12/2024 | | | | 8281 | 07/04/2021 | GT Energy UK Limited | Etruria Valley Geothermal Heat Plant | District | Expansion | | | Unspecified | Ground Source Heat Pumps | | | | | Electric | Deep Geothermal - Mine Water | | | | Yes | | No | | | Planning Permission Granted | Awaiting Construction | | | Land Off Festival Way | Staffordshire | West Midlands | England | ST1 5PU | 386852 | 347977 | Stoke-on-Trent | 20/00986/FUL | | | | | | | 19/11/2020 | | | | | | | 18/02/2021 | | | | | | | | | | | 8544 | 17/10/2022 | University of York | The University Of York - Energy Centre | Campus | Expansion | | Non Domestic | University | Gas Fired CHP | | | Gas Boiler | 2.00 | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | S/O Kimberlow Lane, Heslington, York | North Yorkshire | Yorkshire and Humber | England | YO10 5DD | 462454 | 450613 | York | 20/00427/REM | | | | | | | 03/03/2020 | | | | | | | 08/10/2020 | | | | | | 02/08/2021 | 02/01/2023 | | | | 8545 | 05/11/2021 | The Wheler Foundation | Ledston Hall | Communal | New | 10 | Domestic | Residential | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Operational | Operational | | | Ledston Hall, Hall Lane, Ledston, Castleford | West Yorkshire | Yorkshire and Humber | England | WF10 2BB | 443542 | 428939 | Leeds | 20/00261/LI | | | | | | | 14/01/2020 | | | | | | | 04/12/2020 | | | | | | | | 01/11/2021 | | | 8546 | 29/07/2022 | Plymouth City Council | The Guildhall - Energy centre | District | Renovation | 3 | Non Domestic | Office, Town Hall | Air Source Heat Pumps | | | Gas Boiler | | Electric | | | | | Yes | | No | | | Under Construction | Under Construction | | | The Guildhall, Royal Parade, Plymouth | Devon | South West | England | PL1 2BJ | 247835 | 54394 | Plymouth | 20/01673/LBC | | | | | | | 09/11/2020 | | | | | | | 11/03/2021 | | | | | | 01/04/2022 | | | | | 8550 | 15/03/2021 | South West London and St Georges NHS Trust | Springfield Hospital | District | New | | Non Domestic | Hospital | Gas Fired CHP | | | Gas Boiler | 0.40 | Gas | | | | | Yes | Yes | Yes | | | Under Construction | Under Construction | | | Springfield University Hospital Site, 61 Glenburnie Road, Tooting | London | London | England | SW17 7DJ | 527307 | 172337 | Wandsworth | 2010/3703 | | | | | | | 10/09/2010 | | | | | | | 20/06/2012 | | | | | | 01/12/2020 | 01/03/2023 | | | | 8553 | 06/01/2023 | Stanhope Plc | Ruskin Square Development | District | New | | Mixed | Residential, Retail | Gas Fired CHP | | | | 1.40 | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Adj to East Croydon Station, George Street, inc 1-5 Station Approach, Dingwall Road, Croydon | Surrey | London | England | CR0 1LF | 532835 | 165717 | Croydon | 11/00631/P | | | | | | | 03/03/2011 | | | | | | | | | | | | | 01/10/2013 | 01/05/2016 | | | | 8554 | 11/03/2022 | Energetik | 4 Advent Way | District | New | | Mixed | Unspecified | Gas Boiler | Gas Fired CHP | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | 4 Advent Way, Upper Edmonton | London | London | England | N18 3AG | 535731 | 192446 | Enfield | 18/04517/FUL | | | | | | | 05/12/2018 | | | | | | | | | | | | | 23/04/2021 | 23/02/2023 | | | | 8556 | 06/01/2023 | South Tyneside Council | Viking Energy Network | District | New | | Mixed | Residential, Hospital, Office, Gym, Town Hall, Community Hub | Water Source Heat Pumps | Gas Fired CHP | | | | Electric | | | Yes | 50.00 | Yes | | Yes | 4600.00 | | Operational | Operational | | | Adj River Tyne | Tyne and Wear | North East | England | NE33 | 431842 | 565695 | South Tyneside | ST/0655/20/LAA | | | | | | | 07/12/2020 | | | | | | | 29/03/2021 | | | | | | | | 01/03/2023 | | | 8557 | 14/12/2021 | Manchester City Council | Manchester Civic Quarter Heat Network | District | New | | Non Domestic | Library, Gallery, Arena, Town Hall | Gas Fired CHP | Gas Boiler | | | 27.00 | Gas | | | | | Yes | Yes | Yes | 2000.00 | 450.00 | Operational | Operational | | | Ncp Car Park Manchester Central | Greater Manchester | North West | England | M2 3WS | 383669 | 397661 | Manchester | 118869/VO/2018 | | | | | | | 22/01/2018 | | | | | | | | | | | | | | | 01/01/2022 | | | 8559 | 15/03/2021 | Taylor Wimpey | Osiers Road, Wandsworth | Communal | New | 109 | Domestic | Residential | Gas Boiler | | | | | Gas | | 70.00 | | | Yes | | No | | | Under Construction | Under Construction | | | Linton Fuels, Osiers Road | London | London | England | SW18 1NR | 525428 | 175090 | Wandsworth | 2016/6164 | | | | | | | 25/10/2016 | | | | | | | | | | | | | 01/10/2018 | | | | | 8561 | 15/03/2021 | Thameswey Group | Poole Road Energy Centre | District | New | | Mixed | Unspecified | Gas Fired CHP | | | | | Gas | | | | | Yes | Yes | Yes | | | Operational | Operational | | | 9 - 13 Poole Road And Poole Road, Goldsworth Road And Church Street West, Woking | Surrey | South East | England | GU21 6DY | 500188 | 158466 | Woking | PLAN/2018/1362 | | | | | | | 24/12/2018 | | | | | | | 30/08/2019 | | | | | | | | 01/05/2021 | | | 8563 | 19/10/2023 | Mersey Heat | Liverpool Waters Energy Centre | District | New | | Mixed | Unspecified | Gas Boiler | Water Source Heat Pumps | | | 40.00 | Gas | | | Yes | 260.00 | Yes | Yes | No | | | Under Construction | Under Construction | | | Sherwood Street, Vauxhall | Merseyside | North West | England | L3 7DW | 333964 | 391968 | Liverpool | 20F/3223 | | | | | | | 11/12/2020 | | | | | | | 24/03/2021 | | | | | | 01/10/2023 | 01/01/2025 | | | | 8564 | 06/01/2023 | Colchester Borough Council | Colchester Northern Gateway South | District | New | | Mixed | Residential, Care Home, Hospital, Medical Centre, Office, Restaurant | Water Source Heat Pumps | Gas Boiler | | | 0.80 | Electric | | | | | Yes | | No | | | Under Construction | Under Construction | | | Btw Via Urbis Romanae & Mill Road | Essex | Eastern | England | CO4 5XD | 600110 | 228904 | Colchester | 190665 | | | | | | | 29/03/2019 | | | | | | | 17/07/2019 | | | | | | 01/11/2023 | 01/01/2026 | | | | 8565 | 12/01/2022 | Veolia ES (UK) Limited | Lewisham Spine Heat Network Expansion (Alternative Route) | District | Expansion | | Mixed | Unspecified | EfW Incineration | Gas Fired CHP | | | | Gas | Heat from Energy from Waste Plants | | | | Yes | | Yes | 1037.00 | | Under Construction | Under Construction | | | Convoys Limited, Prince Street | London | London | England | SE8 3JH | 535589 | 178016 | Lewisham | DC/20/117685 | | | | | | | 29/07/2020 | | | | | | | 19/03/2021 | | | | | | 01/11/2024 | 01/11/2026 | | | | 8566 | 12/01/2022 | Veolia ES (UK) Limited | Lewisham Spine Heat Network Expansion | District | Expansion | | Mixed | Unspecified | EfW Incineration | Gas Fired CHP | | | | Gas | Heat from Energy from Waste Plants | | | | Yes | | Yes | 1037.00 | | Under Construction | Under Construction | | | Convoys Limited, Prince Street | London | London | England | SE8 3JH | 535589 | 178016 | Lewisham | DC/20/117728 | | | | | | | 29/07/2020 | | | | | | | 24/11/2020 | | | | | | 01/07/2021 | 01/07/2023 | | | | 8567 | 10/12/2021 | Royal Liverpool Childrens Hospital NHS Trust | Alder Hey Hospital - District Heating Network | Campus | New | | Non Domestic | Hospital | Ground Source Heat Pumps | | | | | Electric | Shallow Geothermal | 45.00 | Yes | | Yes | Yes | No | | 200.00 | Planning Permission Granted | Awaiting Construction | | | Royal Liverpool Childrens N H S Trust Alder Hey Hospital | Merseyside | North West | England | L12 2AP | 340370 | 391870 | Liverpool | 20F/3268 | | | | | | | 17/12/2020 | | | | | | | 19/10/2021 | | | | | | | | | | | 8568 | 11/01/2022 | Cambridgeshire County Council | Swaffham Prior Community Heat Network | District | New | 300 | Domestic | Residential | Ground Source Heat Pumps | Air Source Heat Pumps | | Gas Boiler | | Electric | Deep Geothermal | 72.00 | | | Yes | | No | | | Operational | Operational | | | Liberty Barns, Heath Road, Swaffham | Cambridgeshire | Eastern | England | CB25 0LA | 557931 | 263400 | East Cambridgeshire | CCC/20/054/FUL | | | | | | | 24/07/2020 | | | | | | | 21/09/2021 | | | | | | | | 28/10/2021 | | | 8569 | 11/03/2021 | Highland Energy Supply Co.Limited | Heather Brae - District Heating Facility | District | New | 6 | Domestic | Residential | Biomass (dedicated) | | | | | Woodchip/Pellet | | | | | Yes | | No | | | Planning Application Withdrawn | Application Withdrawn | | | Lower Dell Nursery, Nethy Bridge | Highland | Scotland | Scotland | PH25 3DQ | 300993 | 820206 | Highland | 20/04665/FUL | | | | | | | 25/11/2020 | 09/02/2021 | | | | | | | | | | | | | | | | | 8570 | 01/09/2022 | Pierfront Developments | Cleveland Road Flats | Communal | New | 16 | Domestic | Residential | Gas Boiler | | | | | Gas | | | | | Yes | | No | | | Planning Permission Granted | Awaiting Construction | | | 32 Cleveland Road, Bournemouth | Dorset | South West | England | BH1 4QD | 410569 | 92311 | Bournemouth, Christchurch and Poole | 7-2022-2323-H | | | | | | | 11/04/2022 | | | | | | | 16/06/2022 | | | | | | | | | | | 8572 | 09/01/2023 | South Tyneside Metropolitan Borough Council /Vital Energi Utilities Limited | Hebburn Minewater District Heating Project | District | New | | | Unspecified | Ground Source Heat Pumps | | | | 0.90 | Electric | Deep Geothermal - Mine Water | | | | Yes | | No | 300.00 | | Under Construction | Under Construction | | | Hebburn Town, Hebburn | Tyne And Wear | North East | England | NE33 2RL | 436659 | 566883 | South Tyneside | ST/0725/21/LAA | | | | | | | 27/07/2021 | | | | | | | 18/02/2022 | | | | | | 28/06/2022 | 28/09/2023 | | | | 8576 | 11/03/2021 | London Square | London Square Bermondsey | District | New | 409 | Mixed | Residential, Office, Retail | Gas Fired CHP | Air Source Heat Pumps | | | | Gas | | | | | Yes | Yes | Yes | | | Under Construction | Under Construction | | | Rich Industrial Estate, Crimscott Street, Willow Walk, Southwark | London | London | England | SE1 5SF | 533408 | 178918 | Southwark | 15/AP/2474 | | | | | | | 18/06/2015 | | | | | | | 07/12/2016 | | | | | | 01/01/2018 | 01/01/2024 | | | | 8577 | 06/06/2023 | London Borough of Southwark | Aylesbury Estate Regeneration | District | New | 589 | Mixed | Residential, Nursery, Gym, Community Hub | Gas Fired CHP | Gas Boiler | | | 2.00 | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Aylesbury Estate, Bounded By Albany Road, Portland Street, Westmoreland Road And Bradenham Close, Walworth | London | London | England | SE17 2EP | 533146 | 178042 | Southwark | 14/AP/3843 | | | | | | | 13/10/2014 | | | | | | | 05/08/2015 | | | | | | 01/07/2019 | 01/08/2023 | | | | 8578 | 06/01/2023 | Native Land | PHASE 1 Bankside Yards, Western Site | District | New | 142 | Domestic | Residential | Gas Fired CHP | Gas Boiler | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Sampson House, 64 Hopton Street and Ludgate House, 245 Blackfriars Road, Southwark | London | London | England | SE1 9UF | 531684 | 180473 | Southwark | 12/AP/3940 | | | | | | | 10/12/2012 | | | | | | | 28/03/2014 | | | | | | | | | | | 8579 | 08/04/2025 | Galliard Homes Limited | Wickside Residential & Commercial | District | New | 436 | Domestic | Residential | Gas Fired CHP | | | Gas Boiler | | Gas | | | | | Yes | Yes | Yes | | | Under Construction | Under Construction | | | Mcgrath Works Depot Waste Recycling Station | London | London | England | E9 5HH | 537144 | 184390 | Tower Hamlets | 16/00451/OUT | | | | | | | 09/11/2016 | | | | | | | 21/01/2020 | | | | | | 01/03/2023 | 01/12/2026 | | | | 8581 | 29/11/2022 | Network Homes | 1 Vinyl Square Apartments & Comercial | District | New | 135 | Mixed | Residential, Retail | Gas Fired CHP | | | | | Gas | | | Yes | | Yes | | Yes | | 65.00 | Under Construction | Under Construction | | | The Old Vinyl Factory, 1 Vinyl Square, Blyth Road, Hayes | London | London | England | UB3 1DD | 509155 | 179653 | Hillingdon | 59872/APP/2019/3852 | | | | | | | 09/12/2019 | | | | | | | 22/05/2020 | | | | | | 01/09/2022 | 01/08/2024 | | | | 8583 | 20/05/2024 | MHS Homes Group | St Clements House | Communal | New | 44 | Domestic | Residential | Gas Boiler | Gas Fired CHP | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | St Clements House, Corporation Street, Rochester | Kent | South East | England | ME1 1NL | 574568 | 168392 | Medway | MC/20/0932 | | | | | | | 22/04/2020 | | | | | | | 06/11/2020 | | | | | 01/02/2024 | | 01/08/2025 | | | | 8584 | 10/03/2021 | Leeds City Council | Leeds PIPES - City Centre (Phase 2) | District | New | 236 | Mixed | Residential, Office | EfW Incineration | Gas Fired CHP | | | | Gas | Heat from Energy from Waste Plants | | | | Yes | | Yes | 5000.00 | 300.00 | Under Construction | Under Construction | | | Leeds City Council, Civic Hall, Calverley Street | West Yorkshire | Yorkshire and Humber | England | LS1 1UR | 429835 | 434078 | Leeds | 20/02387/FU | | | | | | | 27/05/2020 | | | | | | | | | | | | | 11/06/2020 | 01/11/2029 | | | | 8585 | 15/03/2022 | Westrock | Crawley Energy Centre | District | New | | Mixed | | Gas Fired CHP | | | | | Gas | | | Yes | 19.00 | Yes | | Yes | | | Operational | Operational | | | Town Hall, The Boulevard, Northgate, Crawley | West Sussex | South East | England | RH10 1UZ | 527192 | 136870 | Crawley | CR/2018/0139/FUL | | | | | | | 25/04/2018 | | | | | | | 02/08/2019 | | | | | | | | 01/07/2022 | | | 8587 | 20/01/2023 | Adur District Council | Shoreham Heat Network | District | New | | | Unspecified | Water Source Heat Pumps | Gas Fired CHP | | | | Electric | | | | | Yes | | Yes | 2100.00 | | Abandoned | Abandoned | | | Various locations in throughout Shoreham | West Sussex | South East | England | | | | | | | | | | | | | | | | | | | | | | | | | | | | 01/09/2022 | | 8589 | 22/10/2024 | Bradford Energy Limited | Bradford Energy Network (BEN) - Phase 1 | District | New | | Mixed | Unspecified | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | | 5000.00 | | Under Construction | Under Construction | | | Bradford City Centre | West Yorkshire | Yorkshire and Humber | England | BD1 1LB | 416292 | 432856 | Bradford | 22/04003/MAF | | | | | | | 14/09/2022 | | | | | | | 20/06/2023 | | | | 24/10/2025 | | 01/01/2023 | 01/01/2026 | | | | 8591 | 20/01/2023 | Cardiff City Council | Cardiff Heat Network - Phase 1 | District | New | | Mixed | Residential, College, Arena, Town Hall, Hotel | EfW Incineration | Gas Fired CHP | | Gas Boiler | 15.00 | Gas | Heat from Energy from Waste Plants | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Various locations in throughout Cardiff | South Glamorgan | Wales | Wales | CF1 | | | | 21/01612/MNR | | | | | | | 25/06/2021 | | | | | | | 22/10/2021 | | | | | | 01/01/2022 | 01/01/2023 | | | | 8592 | 20/01/2023 | Leep Holdings (Utilities) Limited | South West Exeter Heat Network | District | New | | Mixed | Unspecified | EfW Incineration | Gas Fired CHP | | Gas Boiler | | Gas | Heat from Energy from Waste Plants | | Yes | 300.00 | Yes | | Yes | | | Abandoned | Abandoned | | | Various locations in throughout South West Exeter | Devon | South West | England | | | | | | | | | | | | | | | | | | | | | | | | | | | | 24/05/2021 | | 8594 | 30/01/2024 | Gateshead Energy Company | Gateshead District Energy Scheme - East Extension | District | Expansion | | | Unspecified | Ground Source Heat Pumps | | | | 6.00 | Electric | Deep Geothermal - Mine Water | | | | Yes | | Yes | 5000.00 | | Operational | Operational | | | Local Environmental Services Construction Depot, Shearlegs Road East, Gateshead | Tyne And Wear | North East | England | NE8 3EN | 426377 | 563267 | Gateshead | DC/20/00884/FUL | | | | | | | 29/03/2020 | | | | | | | 17/12/2020 | | | | | | | | 01/03/2023 | | | 8600 | 15/03/2023 | London Borough of Hackney | Woodberry Down | District | New | 5500 | Domestic | Residential | Gas Fired CHP | Gas Boiler | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Woodberry Down, Hackney | London | London | England | N4 2SB | 532470 | 187642 | Hackney | 2013/3223 | | | | | | | 08/11/2013 | | | | | | | 20/08/2014 | | | | | | | | | | | 8604 | 25/02/2025 | MEP Limited | Manchester OPEN (Octagon House - Energy Centre) | District | New | | | Unspecified | Gas Fired CHP | | | | 9.90 | Gas | | | | | Yes | Yes | Yes | | | Planning Permission Granted | Awaiting Construction | | | Manchester | Greater Manchester | North West | England | M13 0EA | 385480 | 396088 | Manchester | 141343/FO/2024 | | | | | | | 31/10/2024 | | | | | | | 09/01/2025 | | | | 09/01/2028 | | | | | | | 8608 | 10/03/2021 | Leep Holdings (Utilities) Limited | Media City Heat and Power Network | Campus | New | 1 | Non Domestic | Office | Gas Fired CHP | Absorption Chiller using heat from CHP | | Gas Boiler | 12.50 | Gas | | | | | Yes | Yes | Yes | 2000.00 | | Operational | Operational | | | Media City, Manchester | Greater Manchester | North West | England | | | | | | | | | | | | | | | | | | | | | | | | | | | 01/01/2020 | | | 8649 | 10/05/2024 | Bristol City Council | Redcliffe Heat Network | District | Renovation | | | Not Specified | Gas Fired CHP | | | Gas Boiler | | Gas | | | | | Yes | | Yes | | | No Application Required | No Application Required | | | Redcliffe, Bristol | Gloucestershire | South West | England | BS1 6PJ | 359263 | 172180 | Bristol, City of | | | | | | | | | | | | | | | | | | | | | | | | | | 8653 | 10/03/2021 | Oxfordshire County Council | Oxford City Centre | District | | | | | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | No Application Made | No Application Made | | | Oxford City Centre | Oxfordshire | South East | England | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | 8657 | 09/01/2023 | Bristol City Council | Bedminster | District | New | | | Unspecified | Water Source Heat Pumps | | | | | Electric | Deep Geothermal - Mine Water | | | | Yes | | No | | | Under Construction | Under Construction | | | Various Locations Throughout Bedminster | Gloucestershire | South West | England | | | | | | | | | | | | | | | | | | | 07/04/2021 | | | | | | 05/07/2021 | | | | | 8674 | 11/09/2025 | The Wheat Quarter Limited | Wheat Quarter | Communal | New | 160 | Mixed | Residential, Retail, Museum, Gym, Community Hub | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Planning Application Submitted | Application Submitted | | | Former Shredded Wheat Factory | Hertfordshire | Eastern | England | AL7 1RR | 524215 | 212958 | Welwyn Hatfield | 6/2021/0181/MAJ | | | | | | | 05/02/2021 | | | | | | | | | | | | | 01/05/2026 | 01/03/2030 | | | | 8675 | 19/04/2022 | The Wheat Quarter Limited | Wheat Quarter | Communal | New | 438 | Domestic | Residential | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Planning Application Submitted | Application Submitted | | | Former Shredded Wheat Factory | Hertfordshire | Eastern | England | AL7 1RR | 524215 | 212958 | Welwyn Hatfield | 6/2021/0181/MAJ | | | | | | | 05/02/2021 | | | | | | | | | | | | | | | | | | 8676 | 22/03/2021 | London Borough of Barking and Dagenham | Thames Road Apartments | District | New | 156 | Domestic | Residential | Air Source Heat Pumps | | | Gas Boiler | | Electric | | 65.00 | | | Yes | | No | | | Under Construction | Under Construction | | | 12 Thames Road, Barking | Essex | London | England | IG11 0HZ | 546093 | 182732 | Barking and Dagenham | 19/01970/FUL | | | | | | | 23/12/2019 | | | | | | | 23/04/2020 | | | | | | | 01/03/2024 | | | | 8679 | 22/03/2021 | Audley St Elphins Limited | Audley Retirement Village - Block M | District | New | 74 | Domestic | Care Village | Gas Fired CHP | | | Gas Boiler | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Crow Gables, 131 Fairmile Lane, Cobham | Surrey | South East | England | KT11 2BU | 511932 | 161118 | Elmbridge | 2019/0329 | | | | | | | 05/02/2019 | | | | | | | 29/04/2019 | | | | | | | | | | | 8680 | 05/07/2022 | First Endeavour LLP | Auchmill Road | District | Expansion | 92 | Domestic | Residential | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Operational | Operational | | | 218 Auchmill Road, Aberdeen | Grampian | Scotland | Scotland | AB21 9NB | 390376 | 809332 | Aberdeen City | 191460/DPP | | | | | | | 24/09/2019 | | | | | | | 20/03/2020 | | | | | | | | 01/10/2022 | | | 8681 | 01/03/2022 | Clarion Housing / London Square | St Michaels Square | District | New | 235 | Mixed | Residential, Office, Retail, Restaurant | Gas Fired CHP | | | Gas Boiler | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | 6-44 Station Road And Queens Hall Car Park, Poplar Walk, Croydon | Surrey | London | England | CR0 2RB | 532206 | 166072 | Croydon | 15/01419/P | | | | | | | 31/03/2015 | | | | | | | 31/03/2017 | | | | | | 28/06/2022 | 01/03/2024 | | | | 8683 | 11/01/2022 | Urbanest Limited | Roman Wall House, Crutched Friars and Emperor House | Campus | New | 1 | Non Domestic | Student Accommodation | Gas Fired CHP | | | Gas Boiler | | Gas | | | | | Yes | Yes | Yes | | | Operational | Operational | | | Emperor House & Roman Wall House, 35-36 Vine Street & 1-2 Crutched Friars, City | London | London | England | EC3N 2HT | 533564 | 181006 | City of London | 17/00239/FULMAJ | | | | | | | 24/03/2017 | | | | | | | 09/11/2017 | | | | | | | | 01/11/2021 | | | 8685 | 24/03/2021 | Telereal Trillium | Rome House | District | New | 142 | Domestic | Residential | Gas Fired CHP | | | Gas Boiler | | Gas | | | | | Yes | | Yes | | | Operational | Operational | | | Castle House & Rome House, 119-127 Gordon Road, West Ealing | London | London | England | W13 8QD | 516846 | 180863 | Ealing | P/2015/4089 | | | | | | | 12/08/2015 | | | | | | | 20/02/2017 | | | | | | | | 31/12/2021 | | | 8686 | 10/05/2022 | London Borough of Ealing Council | High Lane Estate Regeneration Development | District | New | 153 | Mixed | Residential, Retail, Restaurant, Community Hub | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | Yes | | | Planning Application Submitted | Application Submitted | | | High Lane Estate, Ealing | London | London | England | W7 3QY | 514989 | 181415 | Ealing | 210009OUT | | | | | | | 18/12/2020 | | | | | | | | | | | | | | | | | | 8687 | 06/01/2023 | Barratt London | Western Circus, Acton | District | New | 353 | Domestic | Residential | Gas Fired CHP | | | | 0.20 | Gas | | | | | Yes | | Yes | | | Operational | Operational | | | Argos Homebase Superstore, Western Avenue, Acton | London | London | England | W3 7XX | 521514 | 180843 | Ealing | 178944FUL | | | | | | | 20/12/2017 | | | | | | | 08/08/2018 | | | | | | | | 01/09/2022 | | | 8688 | 28/01/2025 | Aldau Hotel Investments Limited | The Portal, Gypsy Corner | Communal | New | 702 | Mixed | Residential, Retail, Hotel | Air Source Heat Pumps | Water Source Heat Pumps | | Gas Boiler | | Electric | | | | | Yes | | Yes | | | Planning Permission Granted | Awaiting Construction | | | Holiday Inn London West, 4 Portal Way. Acton | London | London | England | W3 6RT | 520613 | 181659 | Ealing | 191854OPDFUL | | | | | | | 23/04/2019 | | | | | | | 04/02/2020 | | | | | | 01/10/2025 | 01/05/2029 | | | | 8689 | 11/01/2022 | Countryside Properties (UK) Limited Head Office | Alma Estate Regeneration - Phase 2, 2Ai & 2Aii | District | New | 349 | Mixed | Residential, Medical Centre, Retail, Community Hub | Gas Fired CHP | Air Source Heat Pumps | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Alma Estate, Enfield | London | London | England | EN3 4QL | 535917 | 195651 | Enfield | 17/04748/RM | | | | | | | 15/11/2017 | | | | | | | 24/04/2018 | | | | | 01/09/2018 | | | | | | 8690 | 04/03/2024 | Viewpoint Estates | Chase Road | District | Expansion | 200 | Domestic | Residential | Gas Fired CHP | | | Gas Boiler | | Gas | | | | | Yes | | Yes | | | Appeal Granted | Awaiting Construction | | | Southgate Office Village, 286 Chase Road, Southgate | London | London | England | N14 6HF | 529758 | 194437 | Enfield | 19/01941/FUL | 21/00054/REFUSE | | | | | | 03/06/2019 | | 15/09/2020 | 12/03/2021 | | | 14/12/2021 | 14/12/2021 | | | | | | 01/10/2024 | 01/10/2029 | | | | 8691 | 24/03/2021 | Concept Business Group | Mast Pond Wharf / King Henry Dock | Communal | New | 93 | Domestic | Residential | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Planning Permission Granted | Awaiting Construction | | | South East London Aquatic Centre, Europe Road, Woolwich | London | London | England | SE18 5QN | 542809 | 179160 | Greenwich | 11/1584/F | | | | | | | 07/07/2011 | | | | | | | 30/03/2012 | | | | | | | | | | | 8692 | 09/01/2023 | The Berkeley Group | M&S White City Site - Phase 1 - Plots A1,A2 & A3 | District | New | 439 | Mixed | Residential, Unspecified Commercial | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | M&S White City Site, 54 Wood Lane, Shepherds Bush | London | London | England | W12 7RQ | 523362 | 180675 | Hammersmith and Fulham | 2014/04726/OUT | | | | | | | 03/10/2014 | | | | | | | 16/12/2015 | | | | | | | | | | | 8693 | 24/03/2021 | St George Developments Limited | Chelsea Creek - Buildings G & H | District | New | 415 | Domestic | Residential | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Imperial Road, Fulham Gasworks And Imperial Wharf, Fulham | London | London | England | | 526199 | 176668 | Hammersmith and Fulham | 2018/02929/FUL | | | | | | | 03/09/2018 | | | | | | | 29/03/2019 | | | | | | 01/01/2021 | 01/07/2023 | | | | 8694 | 09/01/2023 | Muse Developments Limited | Hale Wharf, Tottenham Hale, Phase 1 | District | New | 250 | Mixed | Residential, Retail | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Hale Wharf, Ferry Lane, Tottenham | London | London | England | N17 9NF | 534818 | 189551 | Haringey | HGY/2016/1719 | | | | | | | 07/06/2016 | | | | | | | 12/06/2017 | | | | | | 01/04/2019 | 01/04/2024 | | | | 8695 | 05/03/2022 | Muse Developments Limited | Hale Wharf, Tottenham Hale, Phase 2 | District | New | 245 | Domestic | Residential | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Hale Wharf, Ferry Lane, Tottenham | London | London | England | N17 9NF | 534818 | 189551 | Haringey | HGY/2018/2351 | | | | | | | 06/08/2018 | | | | | | | 10/09/2018 | | | | | | | 31/08/2024 | | | | 8696 | 06/01/2023 | London Borough of Lambeth | Westbury Estate Regeneration Phase 1 | Communal | New | 40 | Domestic | Residential | Gas Fired CHP | Air Source Heat Pumps | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Westbury Estate, South Lambeth | London | London | England | SW8 3DH | 529294 | 176331 | Lambeth | 17/06112/FUL | | | | | | | 20/12/2017 | | | | | | | | | | | | | 01/01/2019 | 01/01/2021 | | | | 8699 | 30/11/2021 | Fenton Whelan Limited | Park Modern Development - 57 Apartments & Commercial Units | Communal | New | 59 | Mixed | Residential, Dentist, Retail, Gym | Gas Fired CHP | Gas Boiler | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | `117 - 125 Bayswater Road, 2 - 6 Queensway, Consort House And 7 Fosbury Mews & Consort House, Paddington | London | London | England | W2 3JH | 525955 | 180628 | Westminster | 15/10671/FULL | | | | | | | 04/12/2015 | | | | | | | 02/03/2017 | | | | | | 01/11/2020 | 01/05/2023 | | | | 8701 | 17/10/2022 | Royal Holloway University of London | Rusham Park Student Village | Communal | New | 1400 | Non Domestic | Student Accommodation | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Planning Permission Granted | Awaiting Construction | | | Rusham Park, Whitehall Lane, Egham | Surrey | South East | England | TW20 9NW | 500613 | 170148 | Runnymede | RU.20/0098 | | | | | | | 10/01/2020 | | | | | | | 13/09/2022 | | | | 13/09/2024 | | | | | | | 8702 | 06/01/2023 | Thameswey Group | Thameswey Energy Centre, Poole Road | District | New | | Mixed | Unspecified | Gas Fired CHP | | | Gas Boiler | 6.00 | Gas | | | | | Yes | | Yes | | | Operational | Operational | | | Poole Road, Goldsworth Road & Church Street West, Woking | Surrey | South East | England | GU21 6DY | 500186 | 158489 | Woking | PLAN/2016/1444 | | | | | | | 30/12/2016 | | | | | | | 26/03/2021 | | | | | | | | 01/07/2021 | | | 8703 | 01/12/2022 | Woking Borough Council / Thameswey Group | Sheerwater Regeneration Phases 2, 3 and 4 | District | New | 699 | Mixed | Residential, Nursery, Unspecified Commercial | Gas Fired CHP | | | | 1.20 | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Sheerwater Estate, Albert Drive, Sheerwater, Woking | Surrey | South East | England | GU21 5UA | 502932 | 160337 | Woking | PLAN/2018/0337 | | | | | | | 29/03/2018 | | | | | | | 24/07/2020 | | | | | | 01/01/2022 | 01/09/2024 | | | | 8704 | 24/03/2021 | Warwick Gates LLP | Warwick Gates Retirement Home, Phase 3 - 69 Extra Care Flats | District | New | 69 | Domestic | Care Village | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Operational | Operational | | | Earl Rivers Avenue, Adj Gallagher House, Gallagher Way, Gallagher Business Park, Warwick | Warwickshire | West Midlands | England | CV34 6AF | 430876 | 263466 | Warwick | W/15/2163 | | | | | | | 12/02/2016 | | | | | | | 13/05/2016 | | | | | | | | 01/04/2022 | | | 8705 | 11/01/2022 | Sterling Property Ventures Limited | 103 Colmore Row - Offices/Shops/Restaurant - Natwest Tower | District | Expansion | 2 | Non Domestic | Office, Caf� | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Operational | Operational | | | Former National Westminster House, 103 Colmore Row, Birmingham | West Midlands | West Midlands | England | B3 3AG | 406791 | 286996 | Birmingham | 2015/04428/PA | | | | | | | 03/06/2015 | | | | | | | 01/09/2015 | | | | | | | | 01/12/2021 | | | 8707 | 11/01/2022 | Durham County Council | Dawdon Mine Water Treatment Site - Energy Centre | District | New | | Mixed | Unspecified | Water Source Heat Pumps | | | | | Electric | Deep Geothermal - Mine Water | | | | Yes | | No | | | Operational | Operational | | | Dawdon Mine Water Treatment Site, Fox Cover Industrial Estate, Seaham | County Durham | North East | England | SR7 7DN | 443117 | 547508 | County Durham | DM/20/03594/FPA | | | | | | | 14/12/2020 | | | | | | | 12/03/2021 | | | | | | | | 26/11/2021 | | | 8708 | 24/03/2021 | The University of Manchester / Mubadala Development Company | Fallowfield Student Residences Project - Phase 3 | District | New | 897 | Domestic | Student Accommodation | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Planning Permission Granted | Awaiting Construction | | | Owens Park Tower, Wilmslow road, Fallowfield, Manchester | Greater Manchester | North West | England | M14 6HD | 385680 | 394118 | Manchester | 110184/FO/2015/S1 | | | | | | | 30/09/2015 | | | | | | | 11/12/2015 | | | | | | | | | | | 8711 | 31/03/2026 | The University of Manchester | Fallowfield Student Residences - Phase 2 | District | New | 1191 | Domestic | Student Accommodation | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Owens Park Tower, Fallowfield, Manchester | Greater Manchester | North West | England | M14 6HD | 385680 | 394118 | Manchester | 110184/FO/2015/S1 | | | | | | | 30/09/2015 | | | | | | | 11/12/2015 | | | | | 01/12/2025 | | 01/12/2030 | | | | 8712 | 03/11/2022 | Ziser | Cricklewood Broadway Development | Communal | New | 167 | Domestic | Residential | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Planning Permission Granted | Awaiting Construction | | | 249-289 Cricklewood Broadway & 32-56 & 60-74 Hassop Road, Cricklewood | London | London | England | NW2 6NX | 523635 | 185910 | Brent | 21/0470 | | | | | | | 18/02/2021 | | | | | | | 24/10/2022 | | | | | | | | | | | 8713 | 24/03/2021 | Urban Pulse Crown Court Llp | 25 Dunstable Place - 194 Apartments | Communal | New | 194 | Domestic | Residential | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Planning Application Submitted | Application Submitted | | | 25 Dunstable Place, Old Court House Car Park, Luton | Bedfordshire | Eastern | England | LU1 2QT | 508894 | 221250 | Luton | 20/01608/FUL | | | | | | | 08/01/2021 | | | | | | | | | | | | | | | | | | 8714 | 02/03/2023 | City of London Corporation | Salisbury Square Development | District | New | 3 | Non Domestic | Office, Law Building, Emergency Service | Ground Source Heat Pumps | | | | | Electric | Shallow Geothermal | | | | Yes | | No | | | Under Construction | Under Construction | | | Bounded By Fleet Street, Salisbury Court, Salisbury Square, Primrose Hill & Whitefriars St | London | London | England | EC4Y 8AA | 531491 | 181144 | City of London | 20/00997/FULEIA | | | | | | | 16/12/2020 | | | | | | | 30/07/2021 | | | | | | 28/01/2023 | 28/01/2028 | | | | 8715 | 05/08/2022 | Acton Gardens LLP | Acton Gardens Phase 7.2 | Communal | New | 185 | Domestic | Residential | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Planning Permission Granted | Awaiting Construction | | | Acton Gardens Phase 7.2, Belgrave Close, Acton | London | London | England | W3 8QA | 519984 | 179940 | Ealing | 211783REM | | | | | | | 28/01/2021 | | | | | | | 24/05/2021 | | | | | | 01/10/2023 | | | | | 8716 | 05/02/2024 | Premiere Real Estate Developments Limited | Rosebank Way, Acton - 23 Flats | Communal | New | 23 | Domestic | Residential | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Under Construction | Under Construction | | | Btw Rosebank Way & Leamington Park, Rosebank Way | London | London | England | W3 6TT | 520634 | 181447 | Ealing | 211685FUL | | | | | | | 03/02/2021 | | | | | | | | | | | 20/08/2024 | | | 01/07/2024 | | | | 8717 | 09/07/2024 | Royal Borough of Greenwich Property Group | Kidbrooke Park Road Flats | District | New | 118 | Mixed | Residential, Unspecified Commercial | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Under Construction | Under Construction | | | W/O Kidbrooke Park Road, Kidbrooke Park Road, Kidbrooke, Blackheath | London | London | England | SE3 9PX | 540952 | 175843 | Greenwich | 20/2330/F | | | | | | | 05/08/2020 | | | | | | | 03/12/2020 | | | | | 01/03/2022 | | 01/09/2026 | | | | 8718 | 01/10/2022 | Catalyst Housing Group | Wornington Green Estate - Phase 2B, Block 6 - 230 Housing Units | Communal | New | 230 | Domestic | Residential | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Under Construction | Under Construction | | | Wornington Green Estate, Portobello Road, North Kensington | London | London | England | W10 5QQ | 524218 | 181950 | Kensington and Chelsea | PP/20/05500 | | | | | | | 05/10/2020 | | | | | | | 18/12/2020 | | | | | 01/10/2022 | | 01/06/2025 | | | | 8719 | 21/02/2022 | London Borough of Lambeth | Olive Morris House - 74 Flats & Retail Unit | Communal | New | 76 | Mixed | Residential, Unspecified Commercial | Gas Fired CHP | | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Olive Morris House, 18 Brixton Hill, Brixton | London | London | England | SW2 1RD | 530845 | 174914 | Lambeth | 15/02264/FUL | | | | | | | 16/04/2015 | | | | | | | 15/10/2015 | | | | | | 01/10/2020 | 01/01/2023 | | | | 8720 | 05/12/2022 | L&S Student Limited | 333-337 New Cross Road - Student Accommodation | Campus | New | 1 | Non Domestic | Student Accommodation | Air Source Heat Pumps | | | | 0.81 | Electric | | 45.00 | Yes | | Yes | | No | | | Under Construction | Under Construction | | | 333-337 New Cross Road, New Cross | London | London | England | SE14 6AT | 536530 | 177057 | Lewisham | DC/20/116334 | | | | | | | 07/05/2020 | | | | | | | 25/11/2020 | | | | | | 01/11/2022 | 01/12/2023 | | | | 8721 | 18/01/2024 | Southwark Charities | 216-220 Blackfriars Road - 62 Apartments & Office/Community Areas | Communal | New | 64 | Mixed | Residential, Office, Public House | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Planning Permission Granted | Awaiting Construction | | | The Prince William Pub, 216-220 Blackfriars Road, N/O Nicholson Street, Southwark | London | London | England | SE1 0XL | 531705 | 180184 | Southwark | 20/AP/3250 | | | | | | | 11/12/2020 | | | | | | | 20/07/2022 | | | | | | 01/04/2024 | 01/11/2027 | | | | 8722 | 24/03/2021 | Chafford Hundred Freehold Limited | Howard Road, Chafford Hundred | Communal | New | 344 | Domestic | Residential | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Planning Permission Refused | Application Refused | | | R/O Bannatynes Sports Centre, Howard Road, Chafford Hundred, Grays | Essex | Eastern | England | RM16 6YJ | 559194 | 179459 | Thurrock | 20/01709/FUL | | | | | | | 09/12/2020 | | 11/06/2021 | | | | | | | | | | | | | | | | 8723 | 29/10/2024 | London Borough of Brent | Wembley High Road Mixed Development | Communal | New | 250 | Domestic | Residential | Air Source Heat Pumps | Gas Boiler | | | | Electric | | | | | Yes | | No | | | Under Construction | Under Construction | | | Jnct Of Cecil Avenue, High Road, Wembley | London | London | England | HA9 8DQ | 518677 | 185593 | Brent | 19/2891 | | | | | | | 12/08/2019 | | | | | | | 29/03/2021 | | | | | 01/04/2024 | | 01/10/2026 | | | | 8724 | 22/08/2022 | Telford Homes Plc | Stratford International Mixed Development | District | Expansion | 380 | Domestic | Residential | Gas Fired CHP | Air Source Heat Pumps | | | | Gas | | | | | Yes | | Yes | | | Under Construction | Under Construction | | | Stratford International Bus Layover Site, Adj To Stratford International Station, International Way, Stratford, Olympic Park | London | London | England | E20 1YY | 538065 | 184808 | Newham | 19/00391/FUL | | | | | | | 01/10/2019 | | | | | | | 22/10/2021 | | | | | | | 01/08/2025 | | | | 8725 | 08/07/2025 | Westminster City Council | Carlton Dene - 65 Extra Care Flats & 22 Flats | Communal | New | 87 | Domestic | Residential, Care Village | Air Source Heat Pumps | | | | | Electric | | | | | Yes | | No | | | Under Construction | Under Construction | | | Carlton Dene Care Home & Peebles House, 45 Kilburn Park Road, Kilburn | London | London | England | NW6 5XD | 525485 | 183070 | Westminster | 20/08040/FULL | | | | | | | 16/12/2020 | | | | | | | 31/03/2022 | | | | | 01/05/2024 | | 01/10/2026 | | | | 8726 | 16/12/2021 | Salmon Harvester Properties | The Wycliffe Centre Redevelopment | District | New | 167 | Domestic | Care Village | Biomass (dedicated) | | | | | Biofuel | | | | | Yes | | No | | | Under Construction | Under Construction | | | The Wycliffe Centre, Horsleys Green, High Wycombe | Buckinghamshire | South East | England | HP14 3XL | 478634 | 194894 | Buckinghamshire | 17/08285/FUL | | | | | | | 11/12/2017 | | | | | | | 16/03/2018 | | | | | | 01/10/2020 | 01/01/2023 | | | | 8731 | 11/01/2022 | Nottingham University Hospitals NHS Trust | Nottingham University Hospitals Energy Centre | Campus | New | 1 | Non Domestic | Hospital | Gas Fired CHP | Air Source Heat Pumps | | | | Gas | | | | | Yes | | Yes | | | Operational | Operational | | | Nottingham University Hospitals, Nhs Trust City Hospital Site, Hucknall Road, Nottingham | Nottinghamshire | East Midlands | England | NG5 1PB | 456481 | 343879 | Nottingham | 18/00866/PFUL3 | | | | | | | 03/05/2018 | | | | | | | 31/08/2018 | | | | | | | | 25/10/2021 | | | 8733 | 29/03/2021 | Galliard Homes Limited | The Stage, Shoreditch Offices | District | New | 386 | Mixed | Residential, Office, Retail | Gas Fired CHP | | | | | Gas | | | | | Yes | Yes | Yes | | | Under Construction | Under Construction | | | Curtain Road, Shoreditch, Hackney | London | London | England | EC2A 3PQ | 533438 | 182257 |