Renewable Energy Planning Database: quarterly extract

DESNZ·data_release·MEDIUM·6 May 2026·source document

Summary

DESNZ publishes the Q1 2026 extract of the Renewable Energy Planning Database, tracking all UK renewable electricity projects above 150kW through planning, construction, operation, and decommissioning. The database is managed by Barbour ABI and covers project-level detail including capacity, technology type, CfD allocation round, planning status, and grid coordinates. It includes an interactive map and links to the equivalent heat network database.

Why it matters

The REPD is the closest thing to a national register of the renewable build pipeline. For anyone tracking whether Clean Power 2030 targets are credible, this is the raw evidence base on what is actually moving through planning versus what is stalled, refused, or abandoned.

Key facts

  • Quarterly extract covering Q1 2026 (data to end March 2026)
  • Tracks projects from inception through planning, construction, operation, and decommissioning
  • Minimum threshold lowered from 1MW to 150kW in 2021
  • Includes CfD allocation round, RO banding, and FiT tariff data per project
  • Managed by Barbour ABI on behalf of DESNZ

Areas affected

renewablesplanninggrid connectionscfd

Related programmes

CfDClean Power 2030

Memo

What the numbers show

The Q1 2026 REPD extract is the national register of every renewable electricity project above 150kW in the UK, from first planning application through to decommissioning. It covers all technologies: onshore and offshore wind, solar, biomass, anaerobic digestion, energy from waste, battery storage, and hydro.

The database records project-level detail that no other single source provides: installed capacity, technology type, CfD allocation round, planning status, grid coordinates, planning authority, and a full timeline of planning milestones (application submitted, permission granted, appeal lodged, construction started, operational date). The 150kW threshold has applied since 2021; before that, the floor was 1MW, so smaller projects from earlier years may be missing.

The raw extract is the evidence base for whether the UK's renewable pipeline is real or aspirational. Every project that has received planning permission, every project that has been refused, every project sitting in the queue waiting for a decision, and every project that was consented but never built is in here with dates attached.

The critical columns for pipeline analysis are Development Status (the current state of each project) and the dated milestone fields. These let you calculate how long projects spend at each stage, where they stall, and what proportion of consented capacity actually reaches operation.

Trends

The REPD has tracked a consistent pattern over recent quarters. The headline pipeline capacity is large, but the conversion rate from "planning permission granted" to "operational" remains the binding constraint. Consented-but-unbuilt capacity has been growing faster than operational capacity for several years, which means the gap between what is permitted and what is generating widens each quarter.

Solar dominates the volume of new planning applications. Onshore wind applications remain suppressed in England relative to Scotland and Wales, reflecting the lingering effects of the 2015 planning restrictions (partially relaxed in late 2023, but local authority behaviour has been slow to shift). Offshore wind projects move through distinct rounds tied to CfD allocation, and the REPD tracks which round each project was awarded under, making it possible to monitor delivery against auction commitments.

Battery storage (now included in the REPD as a co-located or standalone technology) has grown rapidly in planning applications, but the database reveals a pattern familiar from wind and solar: a large number of consented projects that have not yet started construction. For storage, the bottleneck is grid connection rather than planning permission, which the REPD captures indirectly through the gap between "planning permission granted" and "under construction" dates.

The decommissioned and abandoned categories are worth watching. Early biomass projects from the 2000s are showing up as decommissioned (the Aberthaw co-firing plant, for example, now recorded as decommissioned). These exits reduce installed renewable capacity and are not always offset by new-build at the same pace.

CfD-linked projects can be tracked through the CfD Allocation Round and CfD Capacity fields. This lets you cross-reference REPD status against LCCC contract data to identify projects that won a CfD but have not progressed through planning, or that received planning permission but have not started construction before their longstop date.

What to watch

Clean Power 2030 credibility test. The REPD is the dataset that either supports or undermines the government's Clean Power 2030 target. The question is not how much capacity has planning permission; it is how much capacity is under construction or operational, and whether the flow rate from consent to energisation is sufficient to hit the target. The Q1 2026 extract gives four years of runway to 2030. If large tranches of consented capacity are not moving to construction, the target is not credible regardless of what the pipeline totals say.

Grid connection as the real bottleneck. The REPD does not directly record grid connection status, but the date gaps between "planning permission granted" and "under construction" serve as a proxy. Projects that received consent two or three years ago and have not broken ground are, in most cases, waiting for a connection. This is the same queue problem visible in the NESO TEC register, seen here from the developer's side.

CfD delivery monitoring. Cross-referencing CfD allocation rounds against REPD development status will show which auction vintages are delivering and which are stalling. AR4 and AR5 projects should be moving through construction now. AR6 projects should be in planning. If they are not, the CfD pipeline is thinner than the auction results suggest.

Technology mix shifts. The relative growth rates of solar, onshore wind, offshore wind, and storage in new planning applications signal where the market sees viable projects under current economics. If solar applications continue to outpace wind, that tells you something about the relative attractiveness of the two technologies given current grid charges, connection timelines, and subsidy terms.

Source text10,000 words

The Renewable Energy Planning Database ( REPD ) tracks the progress of UK renewable electricity projects over 150kW through the planning system. It provides as accurate and comprehensive a snapshot as possible of projects, and of progress across the technology sectors, through the following stages: inception planning construction operation decommissioning The database is updated during the month following the end of each quarter. Please note: the minimum threshold for installed capacity was 1MW until 2021, at which point it was lowered to 150kW. This means that projects below 1MW that were going through planning system before 2021 may not be represented in the REPD . Interactive map An interactive map of the REPD data shows the geographical spread of renewable energy projects. If the projects are not visible on the map, refresh your browser (press F5) and they should re-appear. Heat network projects See the equivalent database and map for heat network projects . Contact us Barbour ABI manages the data on behalf of the Department for Energy Security and Net Zero ( DESNZ ). The data is sourced mostly from the web and developers. If you have information about a renewable energy scheme not included in this database, or you spot any inaccuracies in the information provided, please let us know by email to REPD .enquiries@beis.gov.uk . ### REPD Publication Q1 2026 | Old Ref ID | Ref ID | Record Last Updated (dd/mm/yyyy) | Operator (or Applicant) | Site Name | Technology Type | Storage Type | Storage Co-location REPD Ref ID | Installed Capacity (MWelec) | Share Community Scheme | CHP Enabled | CfD Allocation Round | RO Banding (ROC/MWh) | FiT Tariff (p/kWh) | CfD Capacity (MW) | Turbine Capacity (MW) | No. of Turbines | Height of Turbines (m) | Mounting Type for Solar | Development Status | Development Status (short) | Are they re-applying (New REPD Ref) | Are they re-applying (Old REPD Ref) | Address | County | Region | Country | Post Code | X-coordinate | Y-coordinate | Planning Authority | Planning Application Reference | Appeal Reference | Secretary of State Reference | Type of Secretary of State Intervention | Judicial Review | Offshore Wind Round | Planning Application Submitted | Planning Application Withdrawn | Planning Permission Refused | Appeal Lodged | Appeal Withdrawn | Appeal Refused | Appeal Granted | Planning Permission Granted | Secretary of State - Intervened | Secretary of State - Refusal | Secretary of State - Granted | Planning Permission Expired | Under Construction | Operational | Heat Network Ref | Solar Site Area (sqm) | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | N00053B | 1 | 2026-01-16 00:00:00 | RWE npower | Aberthaw Power Station Biomass | Biomass (co-firing) | | | 35 | | No | | | | | | | | | Decommissioned | Decommissioned | | | Aberthaw Power Station, The Leys, Aberthaw Barry | South Glamorgan | Wales | Wales | CF62 4ZW | 302219 | 166320 | Vale of Glamorgan | 04/00580/FUL | | | | | | 2004-04-16 00:00:00 | | | | | | | 2004-09-03 00:00:00 | | | | | 2006-05-01 00:00:00 | 2007-05-01 00:00:00 | | | | AA110 | 2 | 2017-11-20 00:00:00 | Orsted (formerly Dong Energy) / Peel Energy | Hunterston - cofiring | Biomass (co-firing) | | | 170 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Hunterston, Fairlie, West Kilbride, Ayrshire | Strathclyde | Scotland | Scotland | | 218740 | 652937 | Scottish Government (S36) | | | | | | | 2010-06-02 00:00:00 | 2012-06-27 00:00:00 | | | | | | | | | | | | | | | | B0730 | 3 | 2019-12-20 00:00:00 | Scottish and Southern Energy (SSE) | Ferrybridge Multifuel 2 (FM2) | EfW Incineration | | | 70 | | No | | | | | | | | | Operational | Operational | | | | West Yorkshire | Yorkshire and Humber | England | | 447490 | 424684 | The Planning Inspectorate - National Infrastructure | EN010061 | | | | | | 2014-08-20 00:00:00 | | | | | | | 2015-10-28 00:00:00 | | | | 2020-10-28 00:00:00 | 2016-09-01 00:00:00 | 2019-12-20 00:00:00 | | | | 1106000 | 4 | 2003-12-18 00:00:00 | Energy Power Resources | Thetford Biomass Power Station | Biomass (dedicated) | | | 38.5 | | No | | | | | | | | | Operational | Operational | | | Thetford Power Station , Marley Building Materials Site , Two Mile Bottom, Mundford Road, Thetford , Norfolk | Norfolk | Eastern | England | | 585300 | 286900 | Breckland | | | | | | | 1994-06-23 00:00:00 | | | | | | | 1995-05-05 00:00:00 | | | | | | 1998-10-02 00:00:00 | | | | | 5 | 2005-09-29 00:00:00 | Agrigen | Nunn Mills Road Biomass Plant | Biomass (dedicated) | | | 8.8 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | Nunn Mills Road_x000D_, Northampton_x000D_, Northamptonshire | Northamptonshire | East Midlands | England | | 476500 | 259700 | West Northamptonshire | | | | | | | 1997-06-24 00:00:00 | | 1999-02-01 00:00:00 | | | | | | | | | | | | | | | 70700000 | 6 | 2004-08-13 00:00:00 | Incetec / Border Biofuels | Kingmoor Marshalling Yard | Biomass (dedicated) | | | 20 | | No | | | | | | | | | Abandoned | Abandoned | | | Kingmoor Marshalling Yard, Carlisle, Cumbria | Cumbria | North West | England | | 337200 | 559800 | Cumberland | | | | | | | 1999-01-14 00:00:00 | | | | | | | 2000-03-16 00:00:00 | | | | | | | | | | 9162000 | 7 | 2004-11-29 00:00:00 | NOVERA | North Wiltshire Biomass Power Plant | Biomass (dedicated) | | | 5.5 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | North Wiltshire Biomass Power Plant, Kingshill Farm, Cricklade, | Wiltshire | South West | England | | 411500 | 192500 | Wiltshire | 00/01204/EIA | 34716010 | | | | | 2000-05-24 00:00:00 | | 2001-09-11 00:00:00 | | | | | | | | | | | | | | | 100640000 | 8 | 2003-12-23 00:00:00 | Private Developer | | Biomass (dedicated) | | | 15 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Land adjacent to BSW Sawmills, Newbridge on Wye | Powys | Wales | Wales | | 302400 | 256000 | Powys | PR5332/02 | | | | | | 1997-11-10 00:00:00 | 2003-12-23 00:00:00 | | | | | | | | | | | | | | | | 11065000 | 9 | 2004-08-30 00:00:00 | Agricultural Energy Company Limited | Poole Biomass Plant | Biomass (dedicated) | | | 10.9 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Poole Biomass Power Plant, near Wellington , Adjacent to Brickworks and Waste Disposal Site , Near Wellington , Somerset | Somerset | South West | England | | 314900 | 121800 | Somerset | | | | | | | | 2004-08-30 00:00:00 | | | | | | | | | | | | | | | | 12076000 | 10 | 2012-01-04 00:00:00 | Yorkshire Environmental | Eggborough Biomass Power Station | Advanced Conversion Technologies | | | 10.6 | | No | | | | | | | | | Abandoned | Abandoned | | | Eggborough Biomass Power Station Eggborough Near Selby North Yorkshire | North Yorkshire | Yorkshire and Humber | England | | 457200 | 424000 | North Yorkshire | | | | | | | 1996-05-21 00:00:00 | | | | | | | 1997-01-15 00:00:00 | | | | | | | | | | A0047 | 11 | 2018-12-04 00:00:00 | Eastman Peboc Factory | Eastman Peboc Factory | Biomass (dedicated) | | | 31 | | No | | | | | | | | | Appeal Refused | Appeal Refused | | | | Gwynedd | Wales | Wales | | 243260 | 376631 | Isle of Anglesey | | | | | | | 2011-01-15 00:00:00 | | 2012-05-15 00:00:00 | 2013-07-15 00:00:00 | | 2013-07-31 00:00:00 | | | | | | | | | | | | A0138 | 12 | 2012-01-04 00:00:00 | AHS Energy | AHS Energy (Combustion) | Biomass (dedicated) | | | 4.5 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | AHS Energy, Coppards Lane, Northiam, | East Sussex | South East | England | TN31 6QP | 583577 | 125972 | Rother | RR/2009/1283/P | | | | | | 2009-05-20 00:00:00 | | 2009-11-19 00:00:00 | | | | | | | | | | | | | | | A0186 | 13 | 2011-05-05 00:00:00 | Northern Energy Developments | Forestry Commission Depot | Biomass (dedicated) | | | 5 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | Invergarry, | Highland | Scotland | Scotland | PH35 4HG | 229288 | 801062 | Highland | 09/00325/FULLO | | | | | | 2009-08-28 00:00:00 | | 2011-02-22 00:00:00 | | | | | | | | | | | | | | | A0331 | 14 | 2012-04-04 00:00:00 | Dalkia | Chilton Energy Plant | Biomass (dedicated) | | | 18 | | No | | | | | | | | | Operational | Operational | | | Chilton Industrial Estate, Chilton, Ferryhill, | County Durham | North East | England | | 428049 | 530414 | County Durham | 7/2008/0522/DM | | | | | | 2008-09-17 00:00:00 | | | | | | | 2009-11-24 00:00:00 | | | | | 2010-03-01 00:00:00 | 2012-03-12 00:00:00 | | | | A0420 | 16 | 2011-08-17 00:00:00 | Bronzeoak Thermal Processing | Bronzeoak Thermal | Biomass (dedicated) | | | 12.7 | | No | | | | | | | | | Abandoned | Abandoned | | | Btpl, Acorn Industrial Park, Dimmer Lane, Castle Cary, | Somerset | South West | England | BA7 7NR | 361823 | 131905 | Somerset | 02/01774/CPO | | | | | | 2002-06-07 00:00:00 | | | | | | | 2002-08-22 00:00:00 | | | | | | | | | | AA395 | 20 | 2012-07-23 00:00:00 | Land Energy Limited | Chilton Bros Biomass Plant | Biomass (dedicated) | | | 2.5 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | 19 Ladywell Avenue Girvan | Strathclyde | Scotland | Scotland | KA26 9PF | 219921 | 600195 | South Ayrshire | 10/01397/APP | | | | | | 2010-09-18 00:00:00 | 2011-07-21 00:00:00 | | | | | | | | | | | | | | | | AA851 | 22 | 2012-08-10 00:00:00 | Double H Nurseries | Double H Nurseries Biomass Plant | Biomass (dedicated) | | | 1.5 | | Yes | | | | | | | | | Operational | Operational | | | Double H Nurseries, Gore Road, New Milton | Hampshire | South East | England | BH25 5NQ | 422804 | 94625 | New Forest | 12/98264 | | | | | | 2012-01-25 00:00:00 | | | | | | | 2012-05-29 00:00:00 | | | | | | 2012-12-15 00:00:00 | | | | B0242 | 23 | 2016-10-25 00:00:00 | REACT Energy (Kedco) | Newry Biomass Phase 1 (Gasification) | Advanced Conversion Technologies | | | 2 | | No | | | | | | | | | Operational | Operational | | | Newry | Co. Down | Northern Ireland | Northern Ireland | | 117392 | 488885 | Newry, Mourne and Down | | | | | | | | | | | | | | | | | | | | 2012-06-27 00:00:00 | | | | B0376 | 24 | 2012-05-29 00:00:00 | Balfour Beatty | Beckton STW Biodiesel Power Plant | Biomass (dedicated) | | | 8 | | No | | | | | | | | | Operational | Operational | | | Beckton Sewage Treatment Works Jenkins Lane East Ham London | London | London | England | IG11 0AD | 545350 | 181950 | Newham | | | | | | | | | | | | | | | | | | | | 2010-12-01 00:00:00 | | | | B0461 | 26 | 2012-08-07 00:00:00 | Living Power (REG Bio-Power) | Buslingthorpe Power Station (Leeds North) | Biomass (dedicated) | | | 2 | | No | | | | | | | | | Operational | Operational | | | Penraevon Industrial Estate, Buslingthorpe Green, Leeds | West Yorkshire | Yorkshire and Humber | England | LS7 2HG | 430213 | 435435 | Leeds | 10/04466/FU | | | | | | 2010-09-30 00:00:00 | | | | | | | 2010-12-30 00:00:00 | | | | | | 2011-10-14 00:00:00 | | | | C0001 | 27 | 2013-10-08 00:00:00 | Surrey County Council | Redhill Road Biomass Power Plant | Biomass (dedicated) | | | 2.5 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | The Depot, 46 Redhill Road, Cobham | Surrey | South East | England | KT11 1EQ | 508090 | 160261 | Elmbridge | 2012/0423 | | | | | | 2012-02-06 00:00:00 | | 2012-11-06 00:00:00 | | | | | | | | | | | | | | | EN00001 | 28 | 2010-06-09 00:00:00 | Balcas | Invergordon Pellet Mill | Biomass (dedicated) | | | 5 | | No | | | | | | | | | Operational | Operational | | | Invergordon, Ross-shire | Highland | Scotland | Scotland | | 271390 | 870450 | Highland | 06/00944/FULRC | | | | | | 2006-04-15 00:00:00 | | | | | | | 2007-04-16 00:00:00 | | | | | | 2009-11-01 00:00:00 | | | | EN00118 | 32 | 2011-06-29 00:00:00 | Green Renewable Energy Company | Clean Renewable Plant at Old Llynfi Power Station | Biomass (dedicated) | | | 10 | | No | | | | | | | | | Abandoned | Abandoned | | | Old Llynfi Power Station, Aberkenfig, Bridgend | Mid Glamorgan | Wales | Wales | | 288400 | 186900 | Bridgend | 05/364/FUL | | | | | | 2005-03-28 00:00:00 | | | | | | | 2006-02-16 00:00:00 | | | | | | | | | | EN00121 | 33 | 2013-10-08 00:00:00 | Balcas Timber | Balcas Timber Biomass CHP Plant | Biomass (dedicated) | | | 2.5 | | Yes | | | | | | | | | Operational | Operational | | | Balcas Timber Ltd, Laragh, Enniskillen, Co. Fermanagh | Co. Fermanagh | Northern Ireland | Northern Ireland | BT94 2FQ | 31750 | 505000 | Fermanagh and Omagh | | | | | | | 2003-06-01 00:00:00 | | | | | | | 2004-06-01 00:00:00 | | | | | | 2005-11-14 00:00:00 | | | | EN00151 | 34 | 2011-06-29 00:00:00 | Caledonian Paper | Caledonian Papermill | Biomass (dedicated) | | | 26 | | No | | | | | | | | | Operational | Operational | | | Meadowhead Road, Shewalton, Irvine | Strathclyde | Scotland | Scotland | KA11 5AT | 233710 | 634940 | North Ayrshire | 06/00479/PP | | | | | | 2006-05-05 00:00:00 | | | | | | | 2006-07-11 00:00:00 | | | | | | 2009-06-04 00:00:00 | | | | EN00156 | 35 | 2016-05-10 00:00:00 | UK Wood Recycling | Wilton International | Biomass (dedicated) | | | 35.2 | | No | | | | | | | | | Operational | Operational | | | Wilton International, PO Box 1985, Wilton, Middlesbrough, Cleveland | Cleveland | North East | England | TS90 8WS | 458500 | 519500 | Redcar and Cleveland | R/2006/0910/FFM | | | | | | 2006-09-06 00:00:00 | | | | | | | 2006-11-07 00:00:00 | | | | | 2006-11-08 00:00:00 | 2007-03-26 00:00:00 | | | | EN00236 | 37 | 2009-12-04 00:00:00 | Bioflame | South View Farm | Biomass (dedicated) | | | 2 | | No | | | | | | | | | Operational | Operational | | | South View Farm_x000D_, Yatts_x000D_, Pickering | North Yorkshire | Yorkshire and Humber | England | | 480945 | 486785 | North Yorkshire | NYM/2005/0657/FL | | | | | | 2006-02-01 00:00:00 | | | | | | | 2006-10-24 00:00:00 | | | | | | 2007-10-01 00:00:00 | | | | EN00351 | 38 | 2009-03-20 00:00:00 | G B Bio | Tansterne Straw-Burning Power Station | Biomass (dedicated) | | | 10 | | No | | | | | | | | | Revised | Revised | 201 | | Land East of Tansterne Grange, Tansterne Lane, Flinton, | Humberside | Yorkshire and Humber | England | | 522530 | 437505 | East Riding of Yorkshire | 06/09030/STOUT | | | | | | 2006-11-13 00:00:00 | | 2007-08-06 00:00:00 | | | | | | | | | | | | | | | EN00544 | 40 | 2014-12-02 00:00:00 | RWE Innogy | Stallingborough Biomass Power Plant | Biomass (dedicated) | | | 65 | | No | | | | | | | | | Revised | Revised | 202 | | Stallingborough, near the port facilities of Immingham | Humberside | Yorkshire and Humber | England | DN41 8 | 519000 | 411520 | North East Lincolnshire | | | | | | | 2007-02-16 00:00:00 | 2008-06-16 00:00:00 | | | | | | 2011-05-16 00:00:00 | | | | | | | | | | EN00569 | 41 | 2010-06-09 00:00:00 | Norbord | Cowie Biomass Facility | Biomass (dedicated) | | | 15 | | No | | | | | | | | | Operational | Operational | | | Norbord Ltd, Station Road, Cowie, | Stirling | Scotland | Scotland | FK7 7BW | 284085 | 688685 | Stirling | 06/00005/DET | | | | | | 2006-01-06 00:00:00 | | | | | | | 2006-07-27 00:00:00 | | | | | | 2008-02-01 00:00:00 | | | | EN00573 | 42 | 2011-08-18 00:00:00 | Private Developer | Brigg Renewable Energy Plant | Biomass (dedicated) | | | 40 | | No | | | | | | | | | Revised | Revised | 150 | | British Sugar Corporation Ltd, Access roads to power station, Scawby | Humberside | Yorkshire and Humber | England | DN20 9LT | 498860 | 406109 | North Lincolnshire | PA/2008/0793 | | | | | | 2008-05-22 00:00:00 | 2008-09-15 00:00:00 | | | | | | | | | | | | | | | | EN00601 | 43 | 2011-09-12 00:00:00 | Dingle Holdings | Kings Dock Biomass | Biomass (dedicated) | | | 49.9 | | No | | | | | | | | | Appeal Refused | Appeal Refused | | | Kings Dock_x000D_, Swansea_x000D_ | West Glamorgan | Wales | Wales | SA1 8QT | 267902 | 192506 | Swansea | 2007/2684 | APP/B6855/A/09/2111230 | | | | | 2007-11-27 00:00:00 | | 2009-04-06 00:00:00 | | | 2010-12-14 00:00:00 | | | | | | | | | | | | ENA0003 | 44 | 2006-05-23 00:00:00 | TPS (UK) | Thornton Power Station | Biomass (dedicated) | | | 9 | | No | | | | | | | | | Operational | Operational | | | Wyre | Lancashire | North West | England | | 334526 | 443323 | Wyre | | | | | | | | | | | | | | | | | | | | 2002-06-15 00:00:00 | | | | H0064 | 46 | 2016-09-02 00:00:00 | A C Shropshire Ltd | Green's Lodge Farm | Anaerobic Digestion | | | 2 | | Yes | | | | | | | | | Operational | Operational | | | A C Shropshire Ltd, Green's Lodge Farm, Forest Road, Huncote | Leicestershire | East Midlands | England | LE67 4UY | 446531 | 314260 | North West Leicestershire | 2009/0564/01 | | | | | | 2009-09-09 00:00:00 | | | | | | | | | | | | | 2013-05-14 00:00:00 | | | | IF1016 | 47 | 2013-07-04 00:00:00 | Iggesund Paperboard (Workington) | Iggesund Paperboard CHP Plant | Biomass (dedicated) | | | 49 | | Yes | | | | | | | | | Operational | Operational | | | Siddick, Workington, Cumbria | Cumbria | North West | England | CA14 1JX | 300293 | 530977 | Cumberland | 2/2010/0982 | | | | | | 2010-11-17 00:00:00 | | | | | | | 2011-03-08 00:00:00 | | | | | | 2013-02-17 00:00:00 | | | | IF1019 | 48 | 2012-11-15 00:00:00 | Biossence | Cophall Wood (ATT) | Biomass (dedicated) | | | 19 | | Yes | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Land adjoining Cophall Wood Transfer Station, Cophall Wood, Hailsham Road (A22), Polegate | East Sussex | South East | England | | 557716 | 106875 | Wealden | WD/621/CM(EIA) | | | | | | 2009-12-17 00:00:00 | 2010-08-20 00:00:00 | | | | | | | | | | | | | | | | N00009M | 49 | 2010-04-30 00:00:00 | Ancillary Components | Goosey Lodge Industrial Estate | Biomass (dedicated) | | | 16 | | No | | | | | | | | | Operational | Operational | | | Goosey Lodge Industrial Estate_x000D_, Wymington_x000D_, Rushden_x000D_, Northamptonshire_x000D_ | Bedfordshire | Eastern | England | NN10 9LU | 496208 | 236736 | Central Bedfordshire | | | | | | | | | | | | | | | | | | | | 2000-12-31 00:00:00 | | | | N00027B | 50 | 2010-12-07 00:00:00 | Express Power | Express Park | Biomass (dedicated) | | | 40 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | Express Park (Land north of Express Road), Bristol Road, Bridgwater | Somerset | South West | England | | 330660 | 136870 | Somerset | 1/09/03/004 | 1164386 | | | | | 2003-02-25 00:00:00 | | 2004-04-15 00:00:00 | | | | | | | | | | | | | | | N00029B | 51 | 2009-11-05 00:00:00 | Western Skip Hire | Limekiln Hill Quarry | Biomass (dedicated) | | | 1 | | No | | | | | | | | | Abandoned | Abandoned | | | Limekiln Hill Quarry, Mells | Somerset | South West | England | | 372500 | 149500 | Somerset | 106744/010 | | | | | | 2000-04-04 00:00:00 | | | | | | | 2000-12-11 00:00:00 | | | | | | | | | | N00032B | 53 | 2005-08-04 00:00:00 | Energy Power Resources | Grimethorpe Biomass Gasification Power Plant | Biomass (dedicated) | | | 42 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Ferrymoor | South Yorkshire | Yorkshire and Humber | England | | 434700 | 406300 | Barnsley | B/02/0511HR | | | | | | | 2005-08-04 00:00:00 | | | | | | | | | | | | | | | | N00036B | 54 | 2011-06-29 00:00:00 | Private Developer | The Yeld Biomass Project | Biomass (dedicated) | | | 1 | | No | | | | | | | | | Abandoned | Abandoned | | | The Yeld, Lions Hall, Kingston, | Hereford and Worcester | West Midlands | England | HR5 3LY | 334983 | 256434 | Herefordshire, County of | NW20052690/N | | | | | | 2005-08-11 00:00:00 | | | | | | | 2005-09-19 00:00:00 | | | | | | | | | | N00050M | 55 | 2011-06-29 00:00:00 | Talbotts Heating | Talbotts Heating Ltd | Biomass (dedicated) | | | 1.5 | | No | | | | | | | | | Abandoned | Abandoned | | | Talbotts Heating Ltd_x000D_, St Albans Road_x000D_, Stafford | Staffordshire | West Midlands | England | | 392500 | 323500 | Stafford | 00/39093/FUL | | | | | | 2000-05-05 00:00:00 | | | | | | | 2000-07-20 00:00:00 | | | | | | | | | | N00051B | 56 | 2006-04-27 00:00:00 | Peninsular Power | Winkleigh Biogas Generator | Advanced Conversion Technologies | | | 23 | | No | | | | | | | | | Appeal Withdrawn | Appeal Withdrawn | | | Former RAF Airfield, Winkleigh | Devon | South West | England | | 261685 | 109395 | Torridge | 1/2149/2004 | APP/W1145/A/06/2026225 | | | | | 2004-10-15 00:00:00 | | 2006-04-07 00:00:00 | 2006-11-01 00:00:00 | 2007-03-01 00:00:00 | | | | | | | | | | | | | N00052B | 57 | 2011-06-29 00:00:00 | Western Bioenergy, affiliate of Western Log | Western Wood Energy Plant | Biomass (dedicated) | | | 14 | | Yes | | | | | | | | | Operational | Operational | | | Longlands Lane,_x000D_ Margam,_x000D_ nr junction 38 of the M4. | West Glamorgan | Wales | Wales | | 277930 | 186880 | Neath Port Talbot | P2004/0035 | | | | | | 2004-01-09 00:00:00 | | | | | | | 2004-04-27 00:00:00 | | | | | 2006-11-01 00:00:00 | 2009-11-01 00:00:00 | | | | N00063B | 58 | 2010-02-05 00:00:00 | Eccleshal Biomass | Eccleshall Biomass | Biomass (dedicated) | | | 2.6 | | No | | | | | | | | | Operational | Operational | | | Land Adjacent to Raleigh Ind. Estate,_x000D_ Sturbridge_x000D_, Eccleshal_x000D_ | Staffordshire | West Midlands | England | ST21 6JL | 383491 | 330826 | Stafford | 03/00942/FUL | | | | | | 2003-08-05 00:00:00 | | | | | | | 2003-10-29 00:00:00 | | | | | 2006-05-01 00:00:00 | 2007-09-12 00:00:00 | | | | N00064B | 59 | 2009-09-22 00:00:00 | Charlton Sawmills | Charlton Sawmill | Biomass (dedicated) | | | 7 | | No | | | | | | | | | Abandoned | Abandoned | | | Charlton Sawmill, Bideland Dinham, Nr Frome | Somerset | South West | England | BA11 2RH | 372288 | 151929 | Somerset | 084186/009 | | | | | | 2004-06-01 00:00:00 | | | | | | | 2006-03-31 00:00:00 | | | | | | | | | | S0026B2 | 61 | 2006-06-16 00:00:00 | Border Biofuels | Burnside Farm Biomass Plant | Biomass (dedicated) | | | 2.5 | | No | | | | | | | | | Abandoned | Abandoned | | | Glen Cloy, Brodick, Isle of Arran, North Ayrshire | Strathclyde | Scotland | Scotland | | 200700 | 635500 | North Ayrshire | | | | | | | 2001-06-26 00:00:00 | | | | | | | 2001-10-08 00:00:00 | | | | | | | | | | S0030L1 | 62 | 2011-06-29 00:00:00 | EPR Scotland | Westfield Biomass Power Station | Biomass (dedicated) | | | 12.5 | | No | | | | | | | | | Operational | Operational | | | Westfield Development Centre, Fife | Fife | Scotland | Scotland | | 319000 | 695100 | Fife | | | | | | | 1994-03-03 00:00:00 | | | | | | | 1995-12-05 00:00:00 | | | | | | 2000-08-21 00:00:00 | | | | C2329 | 64 | 2015-02-25 00:00:00 | Plymouth Hospital NHS Trust | Derriford Hospital | Biomass (dedicated) | | | 1.5 | | Yes | AR2 | | | | | | | | Operational | Operational | | | Derriford Hospital, Derriford Road, Derriford, Plymouth, | Devon | South West | England | PL6 8DH | 249930 | 59564 | Plymouth | 13/01783/FUL | | | | | | 2013-09-18 00:00:00 | | | | | | | 2013-12-10 00:00:00 | | | | | 2014-07-10 00:00:00 | 2014-10-01 00:00:00 | | | ### Definition Sheet | | | | | | | | | --- | --- | --- | --- | --- | --- | --- | | | | Renewable Energy Planning Database | | | | | | | | | Version: April 2026 (Q1) | | | | | | | Introduction | | | | | | | | | The Renewable Energy Planning Database ('REPD') is managed by Barbour ABI on behalf of the Department of Business, Energy & Industrial Strategy ('BEIS’). The databases track the progress of renewable electricity projects (including those that could also be used for CHP), and electricity storage projects from inception, through planning, construction, operation and decommissioning. The REPD is updated on a quarterly basis, and contains information on all Renewable Electricity and CHP projects up to the end of the previous calendar month. | | | | | | | Table Headings | | | | | | | | General 'REPD' Facility Details | | | | | | | | | Heading | Explanation | | | | | | | Old Ref. ID | The old reference ID associated with a project in a previous version of the database | | | | | | | Ref. ID | Project reference ID number in REPD database | | | | | | | Record Last Updated | Date a project record was last updated or checked | | | | | | | Operator (or Applicant) | Name of operator or applicant | | | | | | | Site Name | Name of development site | | | | | | | Technology Type | Type of technology (e.g. solar photovoltaics, offshore wind etc.) | | | | | | | Installed Capacity (MWelec) | Installed electrical capacity in megawatts (MW) | | | | | | | CHP Enabled | Is the project capable of combined heat and power output | | | | | | | Wind Turbine Capacity (MW) | For windfarms, the individual capacity of each wind turbine in megawatts (MW) | | | | | | | No. of Wind Turbines | For windfarms, the number of wind turbines to be located on the development site | | | | | | | Height of Turbines (m) | For windfarms, the height of the wind turbines in metres (m) | | | | | | | CfD Capacity (MW) | The agreed Contracts for Difference investment capacity | | | | | | | CfD Allocation Round | The round of CFD funding the agreement was made | | | | | | Current Status | | | | | | | | | Heading | Explanation | | | | | | | Development Status | No Application Required - A project that does not require planning permission has been announced by the developer | | | | | | | | Planning Application Submitted - Planning application validated by planning authority | | | | | | | | Planning Application Withdrawn - Planning application has been withdrawn by the applicant | | | | | | | | Planning Permission Granted - Planning permission granted by planning authority | | | | | | | | Planning Permission Refused - Planning permission refused by planning authority | | | | | | | | Revised - The developer has submitted a revised planning application for the same project | | | | | | | | Appeal Lodged - An appeal has been lodged by the applicant following a refusal of planning permission | | | | | | | | Appeal Withdrawn - An appeal against a refusal of planning permission has been withdrawn | | | | | | | | Appeal Refused - An appeal has been refused (dismissed) by the planning inspectorate, such that the original refusal remains | | | | | | | | Appeal Granted - An appeal against a planning refusal has been granted (upheld) and planning permission is therefore granted | | | | | | | | Secretary of State - Called In - A planning application has been called in by the Secretary of State such that the Secretary of State will determine whether planning will be granted or refused | | | ### REPD | Old Ref ID | Ref ID | Record Last Updated (dd/mm/yyyy) | Operator (or Applicant) | Site Name | Technology Type | Storage Type | Storage Co-location REPD Ref ID | Installed Capacity (MWelec) | Share Community Scheme | CHP Enabled | CfD Allocation Round | RO Banding (ROC/MWh) | FiT Tariff (p/kWh) | CfD Capacity (MW) | Turbine Capacity (MW) | No. of Turbines | Height of Turbines (m) | Mounting Type for Solar | Development Status | Development Status (short) | Are they re-applying (New REPD Ref) | Are they re-applying (Old REPD Ref) | Address | County | Region | Country | Post Code | X-coordinate | Y-coordinate | Planning Authority | Planning Application Reference | Appeal Reference | Secretary of State Reference | Type of Secretary of State Intervention | Judicial Review | Offshore Wind Round | Planning Application Submitted | Planning Application Withdrawn | Planning Permission Refused | Appeal Lodged | Appeal Withdrawn | Appeal Refused | Appeal Granted | Planning Permission Granted | Secretary of State - Intervened | Secretary of State - Refusal | Secretary of State - Granted | Planning Permission Expired | Under Construction | Operational | Heat Network Ref | Solar Site Area (sqm) | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | N00053B | 1 | 2026-01-16 00:00:00 | RWE npower | Aberthaw Power Station Biomass | Biomass (co-firing) | | | 35 | | No | | | | | | | | | Decommissioned | Decommissioned | | | Aberthaw Power Station, The Leys, Aberthaw Barry | South Glamorgan | Wales | Wales | CF62 4ZW | 302219 | 166320 | Vale of Glamorgan | 04/00580/FUL | | | | | | 2004-04-16 00:00:00 | | | | | | | 2004-09-03 00:00:00 | | | | | 2006-05-01 00:00:00 | 2007-05-01 00:00:00 | | | | AA110 | 2 | 2017-11-20 00:00:00 | Orsted (formerly Dong Energy) / Peel Energy | Hunterston - cofiring | Biomass (co-firing) | | | 170 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Hunterston, Fairlie, West Kilbride, Ayrshire | Strathclyde | Scotland | Scotland | | 218740 | 652937 | Scottish Government (S36) | | | | | | | 2010-06-02 00:00:00 | 2012-06-27 00:00:00 | | | | | | | | | | | | | | | | B0730 | 3 | 2019-12-20 00:00:00 | Scottish and Southern Energy (SSE) | Ferrybridge Multifuel 2 (FM2) | EfW Incineration | | | 70 | | No | | | | | | | | | Operational | Operational | | | | West Yorkshire | Yorkshire and Humber | England | | 447490 | 424684 | The Planning Inspectorate - National Infrastructure | EN010061 | | | | | | 2014-08-20 00:00:00 | | | | | | | 2015-10-28 00:00:00 | | | | 2020-10-28 00:00:00 | 2016-09-01 00:00:00 | 2019-12-20 00:00:00 | | | | 1106000 | 4 | 2003-12-18 00:00:00 | Energy Power Resources | Thetford Biomass Power Station | Biomass (dedicated) | | | 38.5 | | No | | | | | | | | | Operational | Operational | | | Thetford Power Station , Marley Building Materials Site , Two Mile Bottom, Mundford Road, Thetford , Norfolk | Norfolk | Eastern | England | | 585300 | 286900 | Breckland | | | | | | | 1994-06-23 00:00:00 | | | | | | | 1995-05-05 00:00:00 | | | | | | 1998-10-02 00:00:00 | | | | | 5 | 2005-09-29 00:00:00 | Agrigen | Nunn Mills Road Biomass Plant | Biomass (dedicated) | | | 8.8 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | Nunn Mills Road_x000D_, Northampton_x000D_, Northamptonshire | Northamptonshire | East Midlands | England | | 476500 | 259700 | West Northamptonshire | | | | | | | 1997-06-24 00:00:00 | | 1999-02-01 00:00:00 | | | | | | | | | | | | | | | 70700000 | 6 | 2004-08-13 00:00:00 | Incetec / Border Biofuels | Kingmoor Marshalling Yard | Biomass (dedicated) | | | 20 | | No | | | | | | | | | Abandoned | Abandoned | | | Kingmoor Marshalling Yard, Carlisle, Cumbria | Cumbria | North West | England | | 337200 | 559800 | Cumberland | | | | | | | 1999-01-14 00:00:00 | | | | | | | 2000-03-16 00:00:00 | | | | | | | | | | 9162000 | 7 | 2004-11-29 00:00:00 | NOVERA | North Wiltshire Biomass Power Plant | Biomass (dedicated) | | | 5.5 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | North Wiltshire Biomass Power Plant, Kingshill Farm, Cricklade, | Wiltshire | South West | England | | 411500 | 192500 | Wiltshire | 00/01204/EIA | 34716010 | | | | | 2000-05-24 00:00:00 | | 2001-09-11 00:00:00 | | | | | | | | | | | | | | | 100640000 | 8 | 2003-12-23 00:00:00 | Private Developer | | Biomass (dedicated) | | | 15 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Land adjacent to BSW Sawmills, Newbridge on Wye | Powys | Wales | Wales | | 302400 | 256000 | Powys | PR5332/02 | | | | | | 1997-11-10 00:00:00 | 2003-12-23 00:00:00 | | | | | | | | | | | | | | | | 11065000 | 9 | 2004-08-30 00:00:00 | Agricultural Energy Company Limited | Poole Biomass Plant | Biomass (dedicated) | | | 10.9 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Poole Biomass Power Plant, near Wellington , Adjacent to Brickworks and Waste Disposal Site , Near Wellington , Somerset | Somerset | South West | England | | 314900 | 121800 | Somerset | | | | | | | | 2004-08-30 00:00:00 | | | | | | | | | | | | | | | | 12076000 | 10 | 2012-01-04 00:00:00 | Yorkshire Environmental | Eggborough Biomass Power Station | Advanced Conversion Technologies | | | 10.6 | | No | | | | | | | | | Abandoned | Abandoned | | | Eggborough Biomass Power Station Eggborough Near Selby North Yorkshire | North Yorkshire | Yorkshire and Humber | England | | 457200 | 424000 | North Yorkshire | | | | | | | 1996-05-21 00:00:00 | | | | | | | 1997-01-15 00:00:00 | | | | | | | | | | A0047 | 11 | 2018-12-04 00:00:00 | Eastman Peboc Factory | Eastman Peboc Factory | Biomass (dedicated) | | | 31 | | No | | | | | | | | | Appeal Refused | Appeal Refused | | | | Gwynedd | Wales | Wales | | 243260 | 376631 | Isle of Anglesey | | | | | | | 2011-01-15 00:00:00 | | 2012-05-15 00:00:00 | 2013-07-15 00:00:00 | | 2013-07-31 00:00:00 | | | | | | | | | | | | A0138 | 12 | 2012-01-04 00:00:00 | AHS Energy | AHS Energy (Combustion) | Biomass (dedicated) | | | 4.5 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | AHS Energy, Coppards Lane, Northiam, | East Sussex | South East | England | TN31 6QP | 583577 | 125972 | Rother | RR/2009/1283/P | | | | | | 2009-05-20 00:00:00 | | 2009-11-19 00:00:00 | | | | | | | | | | | | | | | A0186 | 13 | 2011-05-05 00:00:00 | Northern Energy Developments | Forestry Commission Depot | Biomass (dedicated) | | | 5 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | Invergarry, | Highland | Scotland | Scotland | PH35 4HG | 229288 | 801062 | Highland | 09/00325/FULLO | | | | | | 2009-08-28 00:00:00 | | 2011-02-22 00:00:00 | | | | | | | | | | | | | | | A0331 | 14 | 2012-04-04 00:00:00 | Dalkia | Chilton Energy Plant | Biomass (dedicated) | | | 18 | | No | | | | | | | | | Operational | Operational | | | Chilton Industrial Estate, Chilton, Ferryhill, | County Durham | North East | England | | 428049 | 530414 | County Durham | 7/2008/0522/DM | | | | | | 2008-09-17 00:00:00 | | | | | | | 2009-11-24 00:00:00 | | | | | 2010-03-01 00:00:00 | 2012-03-12 00:00:00 | | | | A0420 | 16 | 2011-08-17 00:00:00 | Bronzeoak Thermal Processing | Bronzeoak Thermal | Biomass (dedicated) | | | 12.7 | | No | | | | | | | | | Abandoned | Abandoned | | | Btpl, Acorn Industrial Park, Dimmer Lane, Castle Cary, | Somerset | South West | England | BA7 7NR | 361823 | 131905 | Somerset | 02/01774/CPO | | | | | | 2002-06-07 00:00:00 | | | | | | | 2002-08-22 00:00:00 | | | | | | | | | | AA395 | 20 | 2012-07-23 00:00:00 | Land Energy Limited | Chilton Bros Biomass Plant | Biomass (dedicated) | | | 2.5 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | 19 Ladywell Avenue Girvan | Strathclyde | Scotland | Scotland | KA26 9PF | 219921 | 600195 | South Ayrshire | 10/01397/APP | | | | | | 2010-09-18 00:00:00 | 2011-07-21 00:00:00 | | | | | | | | | | | | | | | | AA851 | 22 | 2012-08-10 00:00:00 | Double H Nurseries | Double H Nurseries Biomass Plant | Biomass (dedicated) | | | 1.5 | | Yes | | | | | | | | | Operational | Operational | | | Double H Nurseries, Gore Road, New Milton | Hampshire | South East | England | BH25 5NQ | 422804 | 94625 | New Forest | 12/98264 | | | | | | 2012-01-25 00:00:00 | | | | | | | 2012-05-29 00:00:00 | | | | | | 2012-12-15 00:00:00 | | | | B0242 | 23 | 2016-10-25 00:00:00 | REACT Energy (Kedco) | Newry Biomass Phase 1 (Gasification) | Advanced Conversion Technologies | | | 2 | | No | | | | | | | | | Operational | Operational | | | Newry | Co. Down | Northern Ireland | Northern Ireland | | 117392 | 488885 | Newry, Mourne and Down | | | | | | | | | | | | | | | | | | | | 2012-06-27 00:00:00 | | | | B0376 | 24 | 2012-05-29 00:00:00 | Balfour Beatty | Beckton STW Biodiesel Power Plant | Biomass (dedicated) | | | 8 | | No | | | | | | | | | Operational | Operational | | | Beckton Sewage Treatment Works Jenkins Lane East Ham London | London | London | England | IG11 0AD | 545350 | 181950 | Newham | | | | | | | | | | | | | | | | | | | | 2010-12-01 00:00:00 | | | | B0461 | 26 | 2012-08-07 00:00:00 | Living Power (REG Bio-Power) | Buslingthorpe Power Station (Leeds North) | Biomass (dedicated) | | | 2 | | No | | | | | | | | | Operational | Operational | | | Penraevon Industrial Estate, Buslingthorpe Green, Leeds | West Yorkshire | Yorkshire and Humber | England | LS7 2HG | 430213 | 435435 | Leeds | 10/04466/FU | | | | | | 2010-09-30 00:00:00 | | | | | | | 2010-12-30 00:00:00 | | | | | | 2011-10-14 00:00:00 | | | | C0001 | 27 | 2013-10-08 00:00:00 | Surrey County Council | Redhill Road Biomass Power Plant | Biomass (dedicated) | | | 2.5 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | The Depot, 46 Redhill Road, Cobham | Surrey | South East | England | KT11 1EQ | 508090 | 160261 | Elmbridge | 2012/0423 | | | | | | 2012-02-06 00:00:00 | | 2012-11-06 00:00:00 | | | | | | | | | | | | | | | EN00001 | 28 | 2010-06-09 00:00:00 | Balcas | Invergordon Pellet Mill | Biomass (dedicated) | | | 5 | | No | | | | | | | | | Operational | Operational | | | Invergordon, Ross-shire | Highland | Scotland | Scotland | | 271390 | 870450 | Highland | 06/00944/FULRC | | | | | | 2006-04-15 00:00:00 | | | | | | | 2007-04-16 00:00:00 | | | | | | 2009-11-01 00:00:00 | | | | EN00118 | 32 | 2011-06-29 00:00:00 | Green Renewable Energy Company | Clean Renewable Plant at Old Llynfi Power Station | Biomass (dedicated) | | | 10 | | No | | | | | | | | | Abandoned | Abandoned | | | Old Llynfi Power Station, Aberkenfig, Bridgend | Mid Glamorgan | Wales | Wales | | 288400 | 186900 | Bridgend | 05/364/FUL | | | | | | 2005-03-28 00:00:00 | | | | | | | 2006-02-16 00:00:00 | | | | | | | | | | EN00121 | 33 | 2013-10-08 00:00:00 | Balcas Timber | Balcas Timber Biomass CHP Plant | Biomass (dedicated) | | | 2.5 | | Yes | | | | | | | | | Operational | Operational | | | Balcas Timber Ltd, Laragh, Enniskillen, Co. Fermanagh | Co. Fermanagh | Northern Ireland | Northern Ireland | BT94 2FQ | 31750 | 505000 | Fermanagh and Omagh | | | | | | | 2003-06-01 00:00:00 | | | | | | | 2004-06-01 00:00:00 | | | | | | 2005-11-14 00:00:00 | | | | EN00151 | 34 | 2011-06-29 00:00:00 | Caledonian Paper | Caledonian Papermill | Biomass (dedicated) | | | 26 | | No | | | | | | | | | Operational | Operational | | | Meadowhead Road, Shewalton, Irvine | Strathclyde | Scotland | Scotland | KA11 5AT | 233710 | 634940 | North Ayrshire | 06/00479/PP | | | | | | 2006-05-05 00:00:00 | | | | | | | 2006-07-11 00:00:00 | | | | | | 2009-06-04 00:00:00 | | | | EN00156 | 35 | 2016-05-10 00:00:00 | UK Wood Recycling | Wilton International | Biomass (dedicated) | | | 35.2 | | No | | | | | | | | | Operational | Operational | | | Wilton International, PO Box 1985, Wilton, Middlesbrough, Cleveland | Cleveland | North East | England | TS90 8WS | 458500 | 519500 | Redcar and Cleveland | R/2006/0910/FFM | | | | | | 2006-09-06 00:00:00 | | | | | | | 2006-11-07 00:00:00 | | | | | 2006-11-08 00:00:00 | 2007-03-26 00:00:00 | | | | EN00236 | 37 | 2009-12-04 00:00:00 | Bioflame | South View Farm | Biomass (dedicated) | | | 2 | | No | | | | | | | | | Operational | Operational | | | South View Farm_x000D_, Yatts_x000D_, Pickering | North Yorkshire | Yorkshire and Humber | England | | 480945 | 486785 | North Yorkshire | NYM/2005/0657/FL | | | | | | 2006-02-01 00:00:00 | | | | | | | 2006-10-24 00:00:00 | | | | | | 2007-10-01 00:00:00 | | | | EN00351 | 38 | 2009-03-20 00:00:00 | G B Bio | Tansterne Straw-Burning Power Station | Biomass (dedicated) | | | 10 | | No | | | | | | | | | Revised | Revised | 201 | | Land East of Tansterne Grange, Tansterne Lane, Flinton, | Humberside | Yorkshire and Humber | England | | 522530 | 437505 | East Riding of Yorkshire | 06/09030/STOUT | | | | | | 2006-11-13 00:00:00 | | 2007-08-06 00:00:00 | | | | | | | | | | | | | | | EN00544 | 40 | 2014-12-02 00:00:00 | RWE Innogy | Stallingborough Biomass Power Plant | Biomass (dedicated) | | | 65 | | No | | | | | | | | | Revised | Revised | 202 | | Stallingborough, near the port facilities of Immingham | Humberside | Yorkshire and Humber | England | DN41 8 | 519000 | 411520 | North East Lincolnshire | | | | | | | 2007-02-16 00:00:00 | 2008-06-16 00:00:00 | | | | | | 2011-05-16 00:00:00 | | | | | | | | | | EN00569 | 41 | 2010-06-09 00:00:00 | Norbord | Cowie Biomass Facility | Biomass (dedicated) | | | 15 | | No | | | | | | | | | Operational | Operational | | | Norbord Ltd, Station Road, Cowie, | Stirling | Scotland | Scotland | FK7 7BW | 284085 | 688685 | Stirling | 06/00005/DET | | | | | | 2006-01-06 00:00:00 | | | | | | | 2006-07-27 00:00:00 | | | | | | 2008-02-01 00:00:00 | | | | EN00573 | 42 | 2011-08-18 00:00:00 | Private Developer | Brigg Renewable Energy Plant | Biomass (dedicated) | | | 40 | | No | | | | | | | | | Revised | Revised | 150 | | British Sugar Corporation Ltd, Access roads to power station, Scawby | Humberside | Yorkshire and Humber | England | DN20 9LT | 498860 | 406109 | North Lincolnshire | PA/2008/0793 | | | | | | 2008-05-22 00:00:00 | 2008-09-15 00:00:00 | | | | | | | | | | | | | | | | EN00601 | 43 | 2011-09-12 00:00:00 | Dingle Holdings | Kings Dock Biomass | Biomass (dedicated) | | | 49.9 | | No | | | | | | | | | Appeal Refused | Appeal Refused | | | Kings Dock_x000D_, Swansea_x000D_ | West Glamorgan | Wales | Wales | SA1 8QT | 267902 | 192506 | Swansea | 2007/2684 | APP/B6855/A/09/2111230 | | | | | 2007-11-27 00:00:00 | | 2009-04-06 00:00:00 | | | 2010-12-14 00:00:00 | | | | | | | | | | | | ENA0003 | 44 | 2006-05-23 00:00:00 | TPS (UK) | Thornton Power Station | Biomass (dedicated) | | | 9 | | No | | | | | | | | | Operational | Operational | | | Wyre | Lancashire | North West | England | | 334526 | 443323 | Wyre | | | | | | | | | | | | | | | | | | | | 2002-06-15 00:00:00 | | | | H0064 | 46 | 2016-09-02 00:00:00 | A C Shropshire Ltd | Green's Lodge Farm | Anaerobic Digestion | | | 2 | | Yes | | | | | | | | | Operational | Operational | | | A C Shropshire Ltd, Green's Lodge Farm, Forest Road, Huncote | Leicestershire | East Midlands | England | LE67 4UY | 446531 | 314260 | North West Leicestershire | 2009/0564/01 | | | | | | 2009-09-09 00:00:00 | | | | | | | | | | | | | 2013-05-14 00:00:00 | | | | IF1016 | 47 | 2013-07-04 00:00:00 | Iggesund Paperboard (Workington) | Iggesund Paperboard CHP Plant | Biomass (dedicated) | | | 49 | | Yes | | | | | | | | | Operational | Operational | | | Siddick, Workington, Cumbria | Cumbria | North West | England | CA14 1JX | 300293 | 530977 | Cumberland | 2/2010/0982 | | | | | | 2010-11-17 00:00:00 | | | | | | | 2011-03-08 00:00:00 | | | | | | 2013-02-17 00:00:00 | | | | IF1019 | 48 | 2012-11-15 00:00:00 | Biossence | Cophall Wood (ATT) | Biomass (dedicated) | | | 19 | | Yes | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Land adjoining Cophall Wood Transfer Station, Cophall Wood, Hailsham Road (A22), Polegate | East Sussex | South East | England | | 557716 | 106875 | Wealden | WD/621/CM(EIA) | | | | | | 2009-12-17 00:00:00 | 2010-08-20 00:00:00 | | | | | | | | | | | | | | | | N00009M | 49 | 2010-04-30 00:00:00 | Ancillary Components | Goosey Lodge Industrial Estate | Biomass (dedicated) | | | 16 | | No | | | | | | | | | Operational | Operational | | | Goosey Lodge Industrial Estate_x000D_, Wymington_x000D_, Rushden_x000D_, Northamptonshire_x000D_ | Bedfordshire | Eastern | England | NN10 9LU | 496208 | 236736 | Central Bedfordshire | | | | | | | | | | | | | | | | | | | | 2000-12-31 00:00:00 | | | | N00027B | 50 | 2010-12-07 00:00:00 | Express Power | Express Park | Biomass (dedicated) | | | 40 | | No | | | | | | | | | Planning Permission Refused | Application Refused | | | Express Park (Land north of Express Road), Bristol Road, Bridgwater | Somerset | South West | England | | 330660 | 136870 | Somerset | 1/09/03/004 | 1164386 | | | | | 2003-02-25 00:00:00 | | 2004-04-15 00:00:00 | | | | | | | | | | | | | | | N00029B | 51 | 2009-11-05 00:00:00 | Western Skip Hire | Limekiln Hill Quarry | Biomass (dedicated) | | | 1 | | No | | | | | | | | | Abandoned | Abandoned | | | Limekiln Hill Quarry, Mells | Somerset | South West | England | | 372500 | 149500 | Somerset | 106744/010 | | | | | | 2000-04-04 00:00:00 | | | | | | | 2000-12-11 00:00:00 | | | | | | | | | | N00032B | 53 | 2005-08-04 00:00:00 | Energy Power Resources | Grimethorpe Biomass Gasification Power Plant | Biomass (dedicated) | | | 42 | | No | | | | | | | | | Planning Application Withdrawn | Application Withdrawn | | | Ferrymoor | South Yorkshire | Yorkshire and Humber | England | | 434700 | 406300 | Barnsley | B/02/0511HR | | | | | | | 2005-08-04 00:00:00 | | | | | | | | | | | | | | | | N00036B | 54 | 2011-06-29 00:00:00 | Private Developer | The Yeld Biomass Project | Biomass (dedicated) | | | 1 | | No | | | | | | | | | Abandoned | Abandoned | | | The Yeld, Lions Hall, Kingston, | Hereford and Worcester | West Midlands | England | HR5 3LY | 334983 | 256434 | Herefordshire, County of | NW20052690/N | | | | | | 2005-08-11 00:00:00 | | | | | | | 2005-09-19 00:00:00 | | | | | | | | | | N00050M | 55 | 2011-06-29 00:00:00 | Talbotts Heating | Talbotts Heating Ltd | Biomass (dedicated) | | | 1.5 | | No | | | | | | | | | Abandoned | Abandoned | | | Talbotts Heating Ltd_x000D_, St Albans Road_x000D_, Stafford | Staffordshire | West Midlands | England | | 392500 | 323500 | Stafford | 00/39093/FUL | | | | | | 2000-05-05 00:00:00 | | | | | | | 2000-07-20 00:00:00 | | | | | | | | | | N00051B | 56 | 2006-04-27 00:00:00 | Peninsular Power | Winkleigh Biogas Generator | Advanced Conversion Technologies | | | 23 | | No | | | | | | | | | Appeal Withdrawn | Appeal Withdrawn | | | Former RAF Airfield,