Summary

Ofgem's ECO4 progress report shows 1,032,211 measures notified as of March 2026, with suppliers at 97.83% of their £224.3m Home Heating Cost Reduction Obligation target. Heating controls dominate delivery at 504,480 measures (49% of total), followed by loft insulation (123,178) and solid wall insulation (88,278). The scheme runs to 31 December 2026.

Why it matters

ECO4 is a supplier obligation that redistributes costs from all bill-payers to fuel-poor households. It does not change market structure, charging methodology, or what can be built. The dominance of heating controls — cheap to install, easy to score — illustrates how obligation schemes optimise for compliance metrics rather than thermal performance.

Key facts

  • 1,032,211 total measures notified, up 3,701 from previous month
  • 97.83% progress toward £224.3m HHCRO target (91.60% approved, 6.23% notified)
  • 97.20% progress toward 90,011 solid wall minimum requirement
  • EFG minimum requirement exceeded at 122.76%
  • ECO4 Flex cap at 57.99% of £110m
  • Heating controls account for 504,480 of 1,032,211 measures (48.9%)
  • Solar PV: 65,221 measures installed under ECO4
  • Scheme ends 31 December 2026
  • Data accurate as of 09 March 2026

Timeline

Effective date31 Dec 2026

Areas affected

suppliersretail market

Related programmes

Net Zero
Memo

Energy Company Obligation public reports and data | Ofgem Please enable JavaScript in your web browser to get the best experience. BETA This site is currently in BETA. Help us improve by giving us your feedback . Close alert: Energy Company Obligation public reports and data Energy Company Obligation 3 interim measures The Energy Company Obligation 4 order commenced on 27 July 2022 and will run to 31 December 2026. Measures delivered between 1 April 2022 to 26 July 2022 will contribute to Energy Company Obligation 4 delivery and will be known as Energy Company Obligation 3 Interim measures as they are delivered in accordance with Energy Company Obligation 3 regulations. Suppliers had to notify us of any Energy Company Obligation 3 interim measures installed between 1 April 2022 and 26 July 2022 by the end of September 2022. Any Energy Company Obligation 4 measures completed between 27 July 2022 and 31 July 2022 also had to be notified by the end of September 2022. Any measures completed on or after 1 August 2022 must be notified by the end of the month following the month in which installation of a measure was completed. Progress towards Phase 1, 2, 3 and 4 To achieve its ECO obligations, a supplier must install measures that qualify under the scheme and deliver annual bill savings for the household. ECO4 sets a main obligation called the Home Heating Cost Reduction Obligation (HHCRO), which requires energy suppliers to achieve a total of £224.3 million in annual bill savings for domestic premises by 31 December 2026. The obligation is divided between energy suppliers based on their respective shares of the domestic gas and electricity market. A supplier meets its obligations under ECO4 by promoting qualifying actions (‘measures’) at eligible domestic premises, and must do so in full no later than 31 December 2026. The overall obligation period for ECO4 runs from the commencement of the ECO4 Order on 27 July 2022 to 31 December 2026 and is split into four phases: Phase 1: 27 July 2022 to 31 March 2023 Phase 2: 1 April 2023 to 31 March 2024 Phase 3: 1 April 2024 to 31 March 2025 Phase 4: 1 April 2025 to 31 December 2026 A supplier’s total obligation is determined by adding together their obligations for each phase. They must meet their total obligation by the end of 31 December 2026. Percentage of energy company progress towards obligations and cap Percentage of energy company progress towards Home Heating Cost Reduction Obligation Percentage of energy company progress towards Solid Wall Minimum Requirement Percentage of energy company progress towards EFG Minimum Requirement Percentage of energy company progress towards Flex cap Percentage of projects by status Percentage of measures by status Notified ECO 4 measures by category The table below shows the measures submitted to Ofgem as of 09 March 2026. This does not include ECO 4 measures that have been notified as exemption measures. For further details on exemption measures, please refer to our Energy Company Obligation (ECO4) Guidance: Delivery . Measure Type ECO4 SA ECO3 Interim ECO4 Total Boiler - Repair of a broken heating system 0 0 0 0 Boiler - Replacement of a broken efficient heating system 1,847 1,804 428 4,079 Boiler - Upgrade to a renewable heating system 0 0 33,255 33,255 Boiler - Upgrade to a non-renewable heating system 4 1 78,113 78,118 Boiler - Upgrade to Unknown - - 2 2 Cavity Wall Insulation 13,724 12,723 27,735 54,182 District Heating Connection 0 2 1,317 1,319 ESH - Repair of a broken efficient electric storage heater with a high heat retention electric storage heater - - 0 0 ESH - Replacement of a broken efficient electric storage heater with a high heat retention electric storage heater 0 0 0 0 ESH - Upgrade to a high heat retention electric storage heater 1,749 1,724 11,123 14,596 First time central heating to a non-renewable heating system 2,775 1,802 15,212 19,789 First time central heating to a renewable heating system 32 72 13,081 13,185 First time central heating to an unknown heating system* - - 4 4 Heating controls 15,809 5,169 483,502 504,480 Loft Insulation 11,883 4,039 107,256 123,178 Other Insulation 100 35 5,152 5,287 Park Home Insulation 29 0 1,235 1,264 Room-in-roof Insulation 946 290 17,703 18,939 Solar PV 138 103 64,980 65,221 Solid Wall Insulation 6,956 1,570 79,752 88,278 Underfloor Insulation 4,703 896 1,436 7,035 Total 60,695 30,230 941,286 1,032,211 Table commentary A total of 238,029 Energy Company Obligation 4 projects have been submitted, an increase of 3,701 projects from the previous month. *A small number of measures have been submitted with an invalid post main heating source for the property, suppliers will be required to update this information Other Insulation includes the following measure types - flat & pitched roof insulation, solid floor insulation, window glazing, draught proofing and higher performance external doors. These measures are grouped together given the low delivery volumes Percentage of energy company progress towards obligations and cap Percentage of energy company progress towards obligations and cap Data is accurate as of 09 March 2026. Notified delivery refers to measures and projects which suppliers have submitted to the Energy Company Obligation 4 register. The notified percentage will count partial project scores from non-approved measures, where the measures and projects are still undergoing their eligibility review. Approved delivery refers to those that have passed eligibility reviews to count towards the obligation target. The approved percentage will count full project scores from approved projects. Where a project has been completed but yet to be approved, partial project scores from the approved associated measures are used. Please note that: Due to notification and validation errors, there are measures and projects which do not have scores generated, meaning the current progress figures do not reflect 100% of delivery towards ECO4. As of 09 March 2026, the data shows progress for 97.68% of delivery, therefore actual delivery is likely to be higher. Progress from approved surplus actions carried over from ECO3 is now reflected in the data. As of July 2025, ECO3 Int and ECO4 Surplus Action progress will remain static for the next few months whilst some digital improvements are being implemented. More information Show Obligation/Cap Target Type Unit Target Approved % Notified % Total % Home Heating Cost Reduction Obligation Obligation £ in billions 0.22 91.60% 6.23% 97.83% Solid Wall Minimum Requirement Obligation Number of households 90,011 91.57% 5.63% 97.20% EFG Minimum Requirement Obligation £ in billions 0.16 114.99% 7.77% 122.76% ECO4 Flex Cap £ in billions 0.11 53.27% 4.72% 57.99% Close