CCUS Innovation 2.0 competition: MONET - MOF-based negative emissions technology

DESNZ·report·LOW·18 May 2026·Updated 18 May 2026·source document

Summary

DESNZ has published Key Knowledge Deliverables from Promethean Particles' MONET project, a pilot-scale carbon capture rig using Metal Organic Framework solid sorbents, funded under the £1bn Net Zero Innovation Portfolio CCUS Innovation 2.0 programme. The released documents (D3.3 build and D4.1 installation) are factory and site acceptance test verification sheets for a prototype unit tested on Drax's flue gas stream at its CCUS Incubation Site in May 2025. The substantive deliverables (CAPEX/OPEX technoeconomic analysis, lifecycle assessment) are listed as pending release after redaction.

Why it matters

This is grant-funded R&D housekeeping, not a market or rule change: it documents that a prototype rig was built and installed, with no cost, performance, or capture-rate data disclosed. The hidden cost is the public funding line itself: a £1bn innovation portfolio dispenses capital on technology-readiness milestones rather than on demonstrated cost per tonne abated, so the metrics that would let anyone judge value (the redacted TEA and LCA) are exactly what is withheld.

Key facts

  • Project lead: Promethean Particles Limited
  • Funded under DESNZ £1bn Net Zero Innovation Portfolio (NZIP), CCUS Innovation 2.0 programme
  • Technology: Metal Organic Framework (MOF) solid sorbent carbon capture
  • Pilot unit tested on Drax industrial flue gas at Drax CCUS Incubation Site, May 2025
  • Released in full: D6.4 marketing material, D6.5 conference/trade-show material
  • Released after redaction: D3.2 control/safety, D3.3/D3.4 rig build, D4.1 installation, D4.3 operation/decommissioning, D5.1 CAPEX TEA, D5.2 OPEX TEA, D5.3 LCA, D6.6 stakeholder analysis
  • No capture rate, cost per tonne, CAPEX or OPEX figures disclosed in released documents

Areas affected

generatorscarbon pricing

Related programmes

Net Zero
Memo

MONET - MOF-based negative emissions technology Project lead: Promethean Particles Limited The project involved the design and fabrication of a prototype carbon capture unit that utilised Metal Organic Frameworks ( MOFs ) as the novel solid sorbent. It was tested at Drax’s CCUS Incubation Site to demonstrate the separation of carbon dioxide from Drax’s industrial flue gas stream. A Lifecycle Assessment ( LCA ) and Technoeconomic Analysis ( TEA ) were also conducted within this project, based on the data collected from test trials at Drax. May 2025 Pilot-scale System Fabrication, Sorbent Production and Site Integration CCUS Innovation 2.0 Key Knowledge Deliverable 3.3 Key Knowledge Deliverable Cover Sheet This Key Knowledge Deliverable (KKD) has been produced by Promethean Particles Ltd. as part of the Department for Energy Security and Net Zero £1bn Net Zero Innovation Portfolio (NZIP) - CCUS Innovation 2.0 programme. The document is reflective of the status of the project at the time of writing. The material presented could have been subject to change as the project matured. These documents should not be considered a full representation of the final project. Summary of KKD D3.3 – Build of CCS Rig This deliverable report demonstrates the successful build of the MONET testing unit, through a variety of post-construction verification checks and factory acceptance testing (FAT) evidence. Final output will be documents demonstrating the successful build of the rig, including test data demonstrating theoretical operation in line with design specification, and detailing a plan for Drax integration. KKDs to be released in full: D6.4 - Marketing Material Creation D6.5 - Conference Presentations and Trade-Show Exhibitions KKDs to be released after redaction: D3.2 - Control and Safety System Manufacturing D3.3 - Build of Capture Rig D4.1 - Installation of Capture Rig D4.3 - Rig Operation and Decommissioning D5.1 - CAPEX Technoeconomic Analysis (TEA) D5.2 - OPEX TEA D5.3 - Life Cycle Analysis (LCA) D6.6 - Stakeholder Analysis © Crown copyright 2026 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Contents Attached Documents Annex List ______________________________________________ 5 Appendix 1 - D3.3 MONET Equipment Verification Checks ________________________ 6 Appendix 2 – D3.3 MONET Instrument Verification Checks _______________________ 7 Appendix 3 – D3.3 MONET Piping Verification Checks ___________________________ 8 Appendix 4 – D3.3 MONET Cable Installation Sheet 1 ___________________________ 9 Appendix 5 – D3.3 MONET Cable Installation Sheet 2 __________________________ 10 Appendix 6 – D3.3 MONET Cable Installation Sheet 3 __________________________ 11 Appendix 7 – D3.3 MONET Pipework Conformity Certificate______________________ 12 Appendix 8 – D3.3 MONET Hydrostatic Testing _______________________________ 13 Appendix 9 – D3.3 MONET Completed FAT Procedure _________________________ 14 Attached Documents Annex List All installation and verification operations were conducted by outsourced external contractors. The details of each contractor has been redacted from the appendices below. Instrument verification check documents are proceeded by a cover sheet indicating that the tests have been completed. An excerpt from the testing has been included in each appendix for reference. Appendix 1 - D3.3 MONET Equipment Verification Checks Appendix 2 - D3.3 MONET Instrument Verification Checks Appendix 3 - D3.3 MONET Piping Verification Checks Appendix 4 - D3.3 MONET Cable Installation Sheet 1 Appendix 5 - D3.3 MONET Cable Installation Sheet 2 Appendix 6 - D3.3 MONET Cable Installation Sheet 3 Appendix 7 - D3.3 MONET Pipework Conformity Certificate Appendix 8 - D3.3 MONET Hydrostatic Testing Appendix 9 - D3.3 MONET Completed FAT Procedure Appendix 1 - D3.3 MONET Equipment Verification Checks Appendix 2 – D3.3 MONET Instrument Verification Checks Appendix 3 – D3.3 MONET Piping Verification Checks Appendix 4 – D3.3 MONET Cable Installation Sheet 1 Appendix 5 – D3.3 MONET Cable Installation Sheet 2 Appendix 6 – D3.3 MONET Cable Installation Sheet 3 Appendix 7 – D3.3 MONET Pipework Conformity Certificate Appendix 8 – D3.3 MONET Hydrostatic Testing Appendix 9 – D3.3 MONET Completed FAT Procedure If you need a version of this document in a more accessible format, please email alt.formats@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use. May 2025 Site Testing of Pilot-scale Unit CCUS Innovation 2.0 Key Knowledge Deliverable 4.1 Key Knowledge Deliverable Cover Sheet This Key Knowledge Deliverable (KKD) has been produced by Promethean Particles Ltd. as part of the Department for Energy Security and Net Zero £1bn Net Zero Innovation Portfolio (NZIP) - CCUS Innovation 2.0 programme. The document is reflective of the status of the project at the time of writing. The material presented could have been subject to change as the project matured. These documents should not be considered a full representation of the final project. Description of KKD D4.1 - Delivery and Installation of Unit This deliverable report demonstrates the successful installation of the MONET testing unit at a CCUS Incubation facility within a UK power station, through a successfully completed site acceptance testing (SAT) procedure. KKDs to be released in full: D6.4 - Marketing Material Creation D6.5 - Conference Presentations and Trade-Show Exhibitions KKDs to be released after redaction: D3.2 - Control and Safety System Manufacturing D3.4 - Build of Capture Rig D4.1 - Installation of Capture Rig D4.3 - Rig Operation and Decommissioning D5.1 - CAPEX Technoeconomic Analysis (TEA) D5.2 - OPEX TEA D5.3 - Life Cycle Analysis (LCA) D6.6 - Stakeholder Analysis © Crown copyright 2026 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Site Testing of Pilot-scale Unit 4 Contents Planning for Site Integration and Testing ________________________________________ 5 Attached Documents Appendix _______________________________________________ 5 Planning for Site Integration and Testing Document demonstrating and detailing the successful installation of the rig at the test site facility. Attached Documents Appendix Appendix 1 - D4.1 MONET Completed SAT Procedure If you need a version of this document in a more accessible format, please email enquiries@energysecurity.gov.uk Please tell us what format you need. It will help us if you say what assistive technology you use.